Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206B597 + (ML20206B597)
- 05000213/LER-1986-020, :on 860508,automatic Reactor & Turbine Trip Occurred During Turbine Vibration Tests.Caused by Operator Accelerating Turbine at Too High Rate.Shift Supervisor & Operators Counseled + (ML20206B598)
- IR 05000312/1988032 + (ML20206B601)
- ML20206B603 + (ML20206B603)
- RA99-074, Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function + (ML20206B606)
- 05000368/LER-1988-017, :on 881005,discovered That Periodic Surveillance Test of Containment Cooling Units Not Performed Prior to Exceeding Max Allowable Time.Caused by Personnel Error.Surveillance Testing Initiated + (ML20206B607)
- IR 05000206/1986027 + (ML20206B608)
- ML20206B609 + (ML20206B609)
- 05000354/LER-1988-001, :on 880126,emergency Diesel Generator a Experienced Invalid Failure During post-maint Retest.Caused by Jumper Wire Missing in Voltage Regulator Ac Shutdown Contactor.Contactor Refigured + (ML20206B611)
- PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process + (ML20206B614)
- 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl + (ML20206B615)
- PNO-IV-88-087, on 881108,radioactive Contamination Found in Metal Turnings in Steel Flanges Imported from Italy. Contamination Appears to Be Small Amounts of Co-60 Uniformly Distributed Throughout Flange Matl + (ML20206B618)
- ML20206B620 + (ML20206B620)
- 05000354/LER-1988-026, :on 881006,discovered That Quarterly Surveillance of Emergency Diesel Generator Fuel Oil Storage Tanks Signed on But Not Completed.Caused by Personnel Error. Surveillance Restructured for Multiple Checks + (ML20206B621)
- ML20206B623 + (ML20206B623)
- ML20206B625 + (ML20206B625)
- IR 05000498/1999010 + (ML20206B630)
- ML20206B633 + (ML20206B633)
- 05000368/LER-1986-008, :on 860430,util Discovered Penetration Fire Barriers for Piping Penetration Room Had Not Been Surveilled for 18-month Interval.Breach in Barrier Found on 860501.Breach Sealed.Procedures Revised + (ML20206B647)
- ML20206B651 + (ML20206B651)
- ML20206B652 + (ML20206B652)
- U-600594, Amended Final Deficiency Rept 55-80-10 Re Welding of Temporary & Permanent Nonsafety Attachments to safety-related Structures & Components.Internal Repts, Documenting Investigation Provided to Region III + (ML20206B653)
- ML20206B656 + (ML20206B656)
- ML20206B659 + (ML20206B659)
- ML20206B662 + (ML20206B662)
- ML20206B663 + (ML20206B663)
- ML20206B664 + (ML20206B664)
- ML20206B667 + (ML20206B667)
- ML20206B670 + (ML20206B670)
- ML20206B672 + (ML20206B672)
- ML20206B673 + (ML20206B673)
- ML20206B676 + (ML20206B676)
- ML20206B677 + (ML20206B677)
- B13065, Application for Amend to License DPR-61,changing Tech Spec Tables 7.2-1 & 8.2-1 to Identify Which Radiation Monitors Required to Be Operable.Fee Paid + (ML20206B679)
- ML20206B682 + (ML20206B682)
- ML20206B684 + (ML20206B684)
- ML20206B685 + (ML20206B685)
- ML20206B688 + (ML20206B688)
- ML20206B689 + (ML20206B689)
- ML20206B691 + (ML20206B691)
- ML20206B693 + (ML20206B693)
- ML20206B697 + (ML20206B697)
- ML20206B698 + (ML20206B698)
- ML20206B699 + (ML20206B699)
- ML20206B701 + (ML20206B701)
- IR 05000445/1988070 + (ML20206B703)
- ML20206B704 + (ML20206B704)
- ML20206B708 + (ML20206B708)
- U-600608, Potentially Reportable Deficiency 55-86-02 Interim Rept Re Electrical Lugs Installed on Vendor Leads of Limitorque Operators.Initially Reported on 860508.Leads W/Unacceptable Size Lugs Will Be Reworked + (ML20206B709)
- ST-HL-AE-2847, Forwards FSAR Pages Supporting Request to Utilize Heatup & Cooldown Curves for Tech Specs Instead of Curves Previously Submitted.Changes Will Be Incorporated in Future FSAR Amend + (ML20206B710)
- ML20206B711 + (ML20206B711)