ML20206B693
| ML20206B693 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/10/1988 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20206B696 | List: |
| References | |
| NUDOCS 8811150535 | |
| Download: ML20206B693 (6) | |
See also: IR 05000445/1988070
Text
.
..
..
..
..
- - - _ - _ _ . _ .
..
s.
..
a'
'
-
NOV I 01988
In Reply Refer To:
Dockets:
50-445/88-70
30-446/88-66
Mr. W. G. Counsil
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Counsil
This refers to the inspection conducted by Mr. M. Runyan and a NRC
consultant during the period October 5 through November 1, 1988, of
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and ?, and to the discussion of our findings with Mr. H. D. Bruner
and oths; members of your staff at the conclusien of the
inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedur0c and representative
records, interviews with personnel, and observations by the
inspectors.
During this inspectior,. it was found that certain of your
activities were in violation of HRC requirements, as specified in
the enclosed Notice of Violation.
A written response to this
violation is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
The response directed by this letter and the accompanylag Notice is
not subject to the cicarance procedures of the office c. danagement
and Budget as required by the Paperwork Reduction Act of 1980,
PL 96-511.
W
.CFO)
IV CPPD OSP
IP:CPPD:OSP
AD:IP:CPPD OSP
MRunyan
HLivermore ( V
RWarnick
11/10 /88
11/gg /88
11/10/88
C
sstissos35 s91110
ADOCK 05000445
PD'
0
Ig
_. .
.
_
r- : p,
,
. \\ :.
_.
.,7 ( z.
~
,.
,
TU Electric
2
NW l 01988
^
Shou 1d.you have any questions concerning this inspection, we will
be pleased -to discuss them with you.
Sincerely,
,
ORIGINAL EIGNED BY R. F. WT'itHC):
'
I
R.
F. Warnick, Assistant Director
for Inspection Programs
comanche Peak Project Division
Office of Special Projects
Enclosures
Appendix A - Not'.ce of Violation
Appendi:: B - Inspection Report
50-445/88-70; 50-446/88-66
cc w/enclosurert
See next page
i
n
l
1
1
l
i
' '
^
L
/
t
- p'ut:vy[o,
.-
",
UNITED STATES
[
NUCLEAR REGULATORY COMMISSION
o
a
I
WAsHmoroei. o. c. rosss
t
jf
%.....#
U l 01988
In Reply Refer To:
Dockets:
50-445/88-70
50-446/88-66
,
Mr. W. G. Counsil
Executive Vice President
TU Electric
400 North Olive Street, Lock Box El
Dallas, Texas
75201
Dear Mr. Counsil:
1
This refers to the inspection conducted by Mr. M. Runyan and a NRC
consultant during the period October 5 through N
em6er 1,
1988, of
activitiec authorized by NRC Construction Permit, CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our firdings with Mr. H. D. Bruner
and other members of your staff at t'
conclusion of the
inspection.
The enclosed copy of our inspectica report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personne', and observations by the
-
inspectors.
During this inspection, it was found that certain of your
activities were in violation of NF.C requirements, as specified in
the enclosed Notice of Violation.
A written responsr. to this
violation is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
,
copy of this letter, the enclosures, and your response to this
'
letter will be placed in the NRC Public Document Room.
The response directed by this letcar and the accompanying Notice is
not subject to the clearance procedures of the office of Management
and Budget as required by the Papervark Reduction Act of 1980,
PL 96-511.
'
!
!
_
.
}
.._____ __________ ___ _ .
?
.
TIJ Electric
2
'
NCY l 01988
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
RF M
R.
F. Warnick, Assistant Director
for Inspection Programs
comanche Peak Project Division
office of Special Projects
Enclosures:
'
Appendix A - Notice of Violation
Appendix B - Inspection Report
50-445/88-70; 50-446/88-66
cc w/ enclosures:
See next page
i
_
_ ___
s
.
..
.
TU Electric
cc w/ enclosure:
Roger D. Walker
Nancy H. Williams
Manager, Nuclear Licensing
CYGNA Energy Services
TU Electric
Suite 390
Skyway Tower
2121 N. California Blvd
400 North Olive Street, L.9. 81
Walnut Creek, CA
94596
Dallas, TX
75201
-
Robert A. Wooldridge, Esq.
Juanita Ellis
Worsham, Forsythe, Sampols
President - CASE
and Wooldridge
1426 South Polk Street
2001 Bryan Tower
Dallas, TX
75224
Suite 2500
Dallas, TX
75201
Susan M. Theisen
Assistant Attorney General
Mr. Homer C. Schmidt
Environmental Protection Division
Director of Nuclear
P.O. Box 12548, Capitol Station
Services
Austin, TX
78711-1546
TU Electric
Skyway Tower
Jack R. Newman, Esq.
400 N. Olive St., L.B.
81
Newman & Holtzinger, P.C.
Dallas, TX
75201
1615 L Street, NW, Suite 1000
Washington, D.C.
20036
Mr. J. L. Vota
Westinghouse Electric
GDS Associates, Inc.
Corporation
'
1850 Parkway Place, Suite 720
Post Office Box 355
Marietta, GA
30067-8237
Pittsburgh, PA
15230
Mr. 2. W. Ackley
Lanny A. Sinkin
Stone & Webster Engineering
Christic Instituto
Corporation Project Mgr.
1324 N. Capitol Street
20002
P. O. Box 1002
Glen Rose, Texas
76043
David R.
Pigott, Esq.
Orrick, Herrington & Sutcliffe
Anthony Z. Roisman, Esq.
600 Montgomery Street
suite 600
San Francisco, CA
94111
1401 New York Avenue, NW
20005
Robert Jablon
Bonnie S.
Blair
Ms. Billie Pirner Garde, Esq.
Spiegel & McDiarmid
Government Accountability Project
1350 New York Avenue, NW
Midwest Office
20005-4798
104 East Wisconsin Avenue
Appleton, WI
54911
TU Electric
c/o Bethesda Licensing
Regiornal Administrator, Region IV
3 Metro Center, Suite 610
U.S. Nuclear Regulatory Commission
Bethesda, MD
20814
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
i
i
,
_
s
t
9
.
.
TU' Electric
-
cc w/ enclosure:
(continued)
George A. Farker, Chairman
Public Utility Committee
Senior citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, TX
77010
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
Suite 700
1025 Thomas Jefferson St., NW
20007
Texas Radiation Control
Program Director
Texas Department of Health
1100 West 49th Street
Austin, TX
78756
4
m
- ,
. _ - - - , - -