Potentially Reportable Deficiency Rept DER 86-10 Re Saturation of Radiation Monitoring Instruments.Due to Investigation,Testing & Evaluation,Final Rept Date Extended from 860605 to 860714
ML20206B623
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/04/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36760-EEVB, DER-86-10, NUDOCS 8606190148
Download: ML20206B623 (2)


Text

c

~~

dECBysy imc Arizona Nuclear Power Project i383,r:n g

" D 34 P.O. Box 52034 e PHOENIX. ARIZONA 85072-2034 June 4, 1986 ANPP-36760-EEVB/LAS[dN!-92.00 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, 3 Docket Nos. 50/528, $29, 530

Subject:

Time Extension for Report - DER 86-10 A 50.55(e) Potentially Reportable Deficiency Relating to Saturation of Radiation Monitoring Instruments File: 86-006-216; D.4.33.2

Reference:

(A) Telephone Conversation between R. C. Sorenson.and T. R. Bradish on March 12, 1986. (Initial Reportability - DER 86-10)

(B) ANPP-36076, dated April 11, 1986 (Interim Report - DER 86-10)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency by Reference (A) and an Interim Report was submitted by Reference (B). At that time, it was estimated that a Final Report would be available by June 5, 1986.

Due to the extensive investigation, testin8, and evaluation required, it is now expected that the Final Report will be submitted by July 14, 1986.

There is no new information or change to the Interim Report at this time.

Very truly yours, AM E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVBJr/DRL/1df Idf/009/TE86-10

$$f 30 $ SIO

$8 s

l 0 i

.RM7

0

~

-a.~

. DER 86 Time Extension Mr. D. F. Kirsch Acting Director ANPP-36760-EEVB/LAS/DRL-92.00 June 4, 1986 Page 2 cc:

J. M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission W shington, D. C. 20555 a

A. C. Gehr (4141)

R. P. Zimmerman (6295)

Records Center Institute of Nuclear Power Operations

1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia. 30339