Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205M162 + (ML20205M162)
- ML20205M163 + (ML20205M163)
- ML20205M164 + (ML20205M164)
- BSEP-86-0453, Special Rept 1-SR-86-003:on 860314,7-day Time Frame for Limiting Condition of Operation for Two Potentially Inoperable Fire Doors Exceeded.Doors Subj to Excessive Differential Pressure Conditions.Part 21 Related + (ML20205M166)
- ML20205M167 + (ML20205M167)
- ML20205M168 + (ML20205M168)
- ML20205M169 + (ML20205M169)
- ML20205M170 + (ML20205M170)
- ML20205M172 + (ML20205M172)
- ML20205M175 + (ML20205M175)
- ML20205M176 + (ML20205M176)
- PNO-IV-86-011, on 860409,unit Shut Down More than 48 H When Leak of Approx 8 Gpm Identified in Packing of Pressurizer Bypass Spray Valve.Plant Shut Down for 15-day Outage in Order to Perform Tech Spec Surveillances & Maint + (ML20205M178)
- ML20205M179 + (ML20205M179)
- ML20205M181 + (ML20205M181)
- ML20205M182 + (ML20205M182)
- ML20205M183 + (ML20205M183)
- 3F0486-06, Forwards Annual Update to Proposed Schedule for Implementation of Requirements for Emergency Response Capability,Per NUREG-0737,Suppl 1 & 830531 Commitment + (ML20205M186)
- ML20205M187 + (ML20205M187)
- ML20205M188 + (ML20205M188)
- ML20205M190 + (ML20205M190)
- ML20205M192 + (ML20205M192)
- ML20205M193 + (ML20205M193)
- ML20205M198 + (ML20205M198)
- ML20205M199 + (ML20205M199)
- ML20205M200 + (ML20205M200)
- ML20205M203 + (ML20205M203)
- ML20205M204 + (ML20205M204)
- ML20205M206 + (ML20205M206)
- IR 05000313/1986005 + (ML20205M209)
- ML20205M210 + (ML20205M210)
- ML20205M211 + (ML20205M211)
- ML20205M213 + (ML20205M213)
- ML20205M214 + (ML20205M214)
- ML20205M215 + (ML20205M215)
- PNO-II-86-026, inspector Dispatched to Follow Up Rept of Possible Overexposure of Two Nuclear Medicine Technologists. Film Badges Showed Doses of 8.9 & 3.4 Rems.Ring TLDs Showed 4.3 & 2.6 Rems,Respectively.Investigation Continuing + (ML20205M217)
- ML20205M221 + (ML20205M221)
- ML20205M222 + (ML20205M222)
- ML20205M225 + (ML20205M225)
- ML20205M231 + (ML20205M231)
- 3F0499-01, Forwards Response to NRC 990304 RAI Re LAR 222,requesting Changes to CREVS & Vftp.Ltr Established No New Commitments + (ML20205M232)
- ML20205M233 + (ML20205M233)
- ML20205M234 + (ML20205M234)
- ML20205M236 + (ML20205M236)
- JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) + (ML20205M239)
- ML20205M241 + (ML20205M241)
- JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) + (ML20205M242)
- JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld + (ML20205M245)
- ML20205M246 + (ML20205M246)
- ML20205M247 + (ML20205M247)
- SVP-99-063, Responds to NRC Re Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions:Revised Site ISI Procedure Qcap 0410-06, ISI Plan Implementation for Third Ten Year Insp Interval + (ML20205M251)
- ML20205M252 + (ML20205M252)