Updates App M to Restart Readiness Assessment Rept Dtd 880926,previously Submitted
ML20205M213
Person / Time
Site: Pilgrim
Issue date: 10/13/1988
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Carr, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8811020385
Download: ML20205M213 (4)


Text

i

,1 i

e. ee 5:

Transmitted via 5520 10/13/88 to V. Stello's_0ffice Mary Jo MEMORANDUM FOR: Chairman Zech Comissioner Roberts Commissioner Carr Comissioner Rogers FROH: Victor Stello, Jr., Executive Director for Operations SUBJECT UPDATE OF PILGRIM NUCLEAR POWER STATION RESTART READINESS ASSESSMENT REPORT ,

This updates Appendix !! to the staff's Restart Readiness Assessment Report, i dated September 26, 1988, previously provided to you.

As of October 13, 1988, the licensee has provided information to NRC staff on all restart open items identified in Appendix 11. The NRC staff has completed i its reviews on all but the following three items, which are currently under review: A.3, A.13, and A.17. ,

l None of these remaining items is considered major.

NICINAL SIGNED BY Yictor Stello, Jr.

Executivo Director for Operations CC:

See Next Page i

! CONTACT:

W. Russell, RI 346-5299

\ l

\

i es1102g@@@@@o80393 E00/ COMMISSION - 0001.0.0 A

%DR PDC 10/13/88 -

. .a :c. ..

t

- Memorandum for. Chairman Zech 2 a

cc: -

.R. Bird,' Senior Vice President - Nuclear,iBECo Chairman, Board of Selectmen, Plymouth j Chairman, Board of Selectr,an, Carver I Chairman,BoardofSelectmen,Duxbury/

Chairman, Board'of Selectmen, Marshfield Chairman, Board of Selectmen, Kingston The Fonorable Edward P. Kirby The Honorable Peter V..Forman The Honorable Edward J. Markey Plymouth Civil Defense Director P. Agnes, Assistant Secretary of Public Safety, Comonwealth of Massachusetts M. Ernst, Committee on Energy, Comonwealth of Massachusetts S. Pollard, Energy Secretary, Comonwealth of Massachusetts B.'McIntyre, Chairman, De)artment of Public Utilities N. Johnson, Chairman, Dux)ury Nuclear Comittee R. Boulay M. Conyngham H. J6ka K. Anderson Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Comonwealth of Massachusetts (2)

SECY OGC ED0/ COMMISSION - 0002.0.0 10/13/88

.~

Memorandun for Chairman Zech 3 o bec:

j- Region I Docket Room (with concurrences) 1

~T.~ Murley..NRR B. Clayton, ED0 W. Kane, RI T. Hartin, RI

!- S. Ebneter, RI l- Pilgrim Restart Panel Members

S. Collins, RI l J. Wiggins, RI l

A. Blough, RI R. Bellamy, RI J. Durr, RI B. Boger, NRR R. Wessman, NRR l D. Mcdonald, NRR i L. Doerflein, RI l C. Warren SRI - Pilgrim

! M. Miller, RI K. Abraham, RI (2)

M. J. DiDonato, RI (2) l E. Wenzinger, RI J. Linville, RI F. Miraglia, NRR D. Crutchfield, NRR S. Yarga, NRR C. Rossi, NRR F. Akstulewicz, NRR l J. Roe, NRR i F. Congel, NRR l

l l

l l

9 RI:DRP :DRP RI:DRP

/h RI:RW EDO RBlough/mjd - JWiggins pCollins WRussell VStello 10//9/88 10/()/88 10/()/88 10/ /88 10/ /88 ED0/C0t911SSION - 0003.0.0 10/13/88

Memorandum for Chairnian Zech 3 bec:

Region I Docket Room (with concurrences)

T. Murley, NRR B. Clayton, EDO W. . Kane , RI T. Mar',in, RI S. Ebneter, RI Pilgrim Restart Panel Members S. Collins, RI J.'Wiggins, RI A. Blough, RI R. Bellamy, RI J. Durr, RI ,

f B. Boger, NRR '

R. Wessman, NRR D. Mcdonald, NRR L. Doerflein,- RI C. Warren, SRI - Pilgrim M. Miller, RI K. Abraham, RI (2)

M. J. DiDonato, RI (2)

E. Wenzinger, RI J. Linville, RI F. Miraglia, NRR D. Crutchfield, NRR S. Varga, NRR C. Rossi, NRR F. Akstulewicz, NRR J. Roe, NRR F. Congel, NRR L

I l

i I

T f

e RI:DRP RI:DRP RI:DRP RI:RA El0 j RBlough/mjd JWiggins SCollins WRussell .

llo j 10/ /88 10/ /88 10/ /88 10/ /88 1 //J/88

- _ - - _ - - - - . _ - - - - - _. _ . - -. _.-_.- - - . . - - . .