Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204G879 + (ML20204G879)
- ML20204G881 + (ML20204G881)
- ML20204G882 + (ML20204G882)
- ML20204G884 + (ML20204G884)
- ML20204G887 + (ML20204G887)
- ML20204G888 + (ML20204G888)
- ML20204G890 + (ML20204G890)
- ML20204G892 + (ML20204G892)
- ML20204G893 + (ML20204G893)
- ML20204G895 + (ML20204G895)
- ML20204G898 + (ML20204G898)
- ML20204G900 + (ML20204G900)
- ML20204G902 + (ML20204G902)
- ML20204G903 + (ML20204G903)
- ML20204G904 + (ML20204G904)
- ML20204G905 + (ML20204G905)
- ML20204G910 + (ML20204G910)
- ML20204G915 + (ML20204G915)
- ML20204G919 + (ML20204G919)
- ML20204G920 + (ML20204G920)
- ML20204G924 + (ML20204G924)
- ML20204G928 + (ML20204G928)
- 05000331/LER-1984-037, :on 840929,reactor Scrammed on hi-hi Intermediate Range Monitor Signals from Channel E & F. Cause May Be Attributed to Spurious Electrical Noise.Review of Design & Installation Performed + (ML20204G931)
- ML20204G932 + (ML20204G932)
- 05000395/LER-1984-042, :on 840928,while Investigating Event Associated W/ Radiation Monitor RM-A4,discovered Plant Design May Not Satisfy Intent of Tech Spec 3.3.2, ESF Actuation Sys Instrumentation. Monitor Returned to Svc + (ML20204G933)
- ML20204G935 + (ML20204G935)
- ML20204G936 + (ML20204G936)
- RBG-19261, Interim Deficiency Rept DR-228 Re Defective Tdi Supplied Cylinder Head Valves in Standby Diesel Generator.Interim or Final Status Rept Will Be Provided by 841205 + (ML20204G940)
- ML20204G941 + (ML20204G941)
- ML20204G942 + (ML20204G942)
- ML20204G944 + (ML20204G944)
- ML20204G947 + (ML20204G947)
- ML20204G948 + (ML20204G948)
- ML20204G950 + (ML20204G950)
- ML20204G953 + (ML20204G953)
- ML20204G955 + (ML20204G955)
- PY-CEI-NRR-0609, Responds to NRC Re Violations Noted in Insp Rept 50-441/87-01.Corrective Actions:Piping Recribbed on Dunnage & Sloped to Allow for Drainage.End Caps Placed Only on High End of Piping Spools.Piping Spools Inspected Annually + (ML20204G956)
- ML20204G958 + (ML20204G958)
- ML20204G961 + (ML20204G961)
- ML20204G963 + (ML20204G963)
- ML20204G964 + (ML20204G964)
- ML20204G967 + (ML20204G967)
- W3P84-3152, Forwards Suppl to Addl Info Re Basemat Hairline Cracks. Muenow & Assoc,Inc Performed Ultrasonic Testing of Interface Between Top of Basemat & Bottom Fill Concrete.Test Confirms Sonic Energy Not Penetrating Fill Concrete + (ML20204G968)
- ML20204G970 + (ML20204G970)
- ML20204G972 + (ML20204G972)
- ML20204G973 + (ML20204G973)
- ML20204G976 + (ML20204G976)
- L-84-315, Forwards Info in Response to NRC Re Regulatory Effectiveness Review.Info Withheld (Ref 10CFR73.21) + (ML20204G979)
- 2CAN118401, Advises That on 841027,two IAEA-installed Seals Removed from Missile Shield Structure Provided in Containment Over CRD Mechanism During Unscheduled Outage to Perform Maint,Per 841026 Telcon + (ML20204G983)
- ML20204G985 + (ML20204G985)
- ML20204G987 + (ML20204G987)