Text
. _ - _ - - -
o:
- N' b
s DCT I 3-1988 In Reply Refer To:
Docket:
50-267 Public Service Company of Colorado ATTN:
Robert O. Williams,-Jr.
Vice President Nuclear Operations 24?0 W. 26th Avenue, Suite 15c Denver, Coloraoo 80211 Gentlemen:
+
This is to advise you of an inspection initiative that has been implemented NRC 6Ide for all operating reactors.
Periodically, one or more subject areas b
(e.g., plant configuration control, maintenance, emergency operating procedures) will be selected for specific team inspection emphasis in the fundamental inspection program. Maintenance has been selected as an area of emphasis by the Director of Nuclear Reactor Regulation, after consultation with the Regional Administrators, and with input from various NRC offices.
Maintenance team inspections will be scheduled at each of the Region IV facilities within the next two years.
The purpose of the inspection is to evaluate each licensee's maintenance performance, both safety related and balance of plant, against existing regulations, industry standards, and accepted good industry practices. The inspection will address all aspects of maintenance performance including preventive and corrective maintenance, its scheduling, planning, performance, parts acquisition, and engineering support.
To accomplish this task, Region IV has selected two team leaders and formed a multidisciplined inspection team. The team leaders are Dennis L. Kelley and Raymond P. Mullikin.
The teams engineering discipline areas are: mechanical, electrical, instrument / control, health physics, and management evaluation.
The inspections will consist of two on-site inspection weeks separated by a week of off-site inspection. Several weeks prior to the inspection you will receive e letter identifying the team members, specifying the schedule dates of the inspection, a request for specific infonnation, and identifying a one or two day site visit by the team leader to discuss in detail the scope of the inspection.
?.
f, D:b 0:9P RIV:C:0PS
- JEGAGLIARDO JLf!L 0AN LJCALLAN
/ /88
/0/$/88 to/n/88 1
- previously concurred.
l l
9(
50 881CQ40269 681013 PDR ADOCK 05000267 f(
i Q
B.,
a Public Service Company of Colorado If you have questions regarding this inspection, the Region IV team leader designated for your site (Dennis Kelley, 817-860-8289) will be pleased to answer your questions.
Sincerely,
,p.c segne1 M f N b(Jtb L. J. Callan, Director Division of Reactor Projects cc:
Fort St. Vrain Nuclear Station Manager, Nuclear Production Division 16805 WCR 19)
Platteville, Colorado 80651 Fort St. Vrain Nuclear Station P. Tomlinson, Manager. Quality Assurance Division (sameaddress)
Colorado Radiation Control Program Director Colorado Public Utilities Commission bec to DMB (IE01) bec distrib. by RIV:
~
RRI R. D. Martin, RA SectionChief(DRP/B)
Project Engineer DRP/B RPB-DRSS Lisa Shea, RM/ALF MIS System RSTS Operator K. Heitner NRR Project Manager RIV File DRS DRP J. Gagliardo J. Gagliardo Reading File D. Kelley R. Mullikin A. Gody, NRR J. Roe, NRR