ML20204G910

From kanterella
Jump to navigation Jump to search
Forwards One License Renewal Application Consisting of NRC Form 398 & NRC Form 396 for M Nemcek License Number SOP-30475-2 & Docket Number 55-30267 for NRC Processing,In Accordance with 10CFR55.57.Without Encls
ML20204G910
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/22/1999
From: Myers L
CENTERIOR ENERGY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
PY-CEI-OIE-0492, PY-CEI-OIE-492, NUDOCS 9903260335
Download: ML20204G910 (1)


Text

. _ _ _ _ _

Perry Nuclear PVwer Plant

, Oto 4 i ,

Lew W. Mpre 440-280-5915 WO President Fax 440-280-8029 March 22,1999 PY-CEl/OIE-0492L Regional Administrator, Region ill United States Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Perry Nuclear Power Plant Docket No. 50-440 License Renewal Application Ladies and Gentlemen:

In accordance with 10 CFR 55.57, enclosed for Nuclear Regulatory Commission (NRC) processing is one (1) license renewal application consisting of a NRC Form 398 (original and two copies) and a NRC Form 396 for Mr. Michael Nemcek, License Number SOP-30475-2 and Docket Number 55-30267.

Please note the enclosed forms are submitted for a license renewai application and are not the result of changing physical conditions.

If you have questions or require additionalinformation, please contact Mr. Henry L. Hegrat, Manager - Regulatory Affairs, at (216) 280-5606.

Very truly yours, MO JLt<D Enclosure cc: Ms. M. A. Bies - Operator Licensing Section, Region 111 (w/o)

NRC Project Manager (w/o) i NRC Resident inspector (w/o)

NRC Document Control Desk (w/o) h O .

9903260335 990322 "

PDR ADOCK 05000440 -

V PDR j

)