Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202A833 + (ML20202A833)
- ML20202A834 + (ML20202A834)
- ML20202A836 + (ML20202A836)
- ML20202A837 + (ML20202A837)
- ML20202A838 + (ML20202A838)
- ML20202A839 + (ML20202A839)
- ML20202A840 + (ML20202A840)
- ML20202A842 + (ML20202A842)
- PNO-II-86-044, informs That Hurricane Bonnie Poses No Threat to Any NRC Licensed Facility According to Present Location & Projected Path.Direction & Intensity of Hurricane Discussed.Region II Will Monitor Hurricane Until Downgraded + (ML20202A843)
- IR 05000254/1997027 + (ML20202A844)
- ML20202A845 + (ML20202A845)
- ML20202A846 + (ML20202A846)
- ML20202A848 + (ML20202A848)
- IR 05000461/1998002 + (ML20202A849)
- ML20202A850 + (ML20202A850)
- BECO-86-041, Forwards Sanitized Rev 0 to Mark I Wetwell to Drywell Vacuum Breaker Load Methodology & Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Pilgrim Station Unit 1, Per 860123 Request + (ML20202A853)
- ML20202A854 + (ML20202A854)
- ML20202A856 + (ML20202A856)
- ML20202A857 + (ML20202A857)
- ML20202A860 + (ML20202A860)
- ML20202A869 + (ML20202A869)
- ML20202A870 + (ML20202A870)
- ML20202A871 + (ML20202A871)
- 0CAN019902, Forwards Listing of Specific SW Piping Segments for Both Units 1 & 2 for Scope of Needed Relief,Per Discussion with NRC Project Manager & IAW GL-90-05 + (ML20202A872)
- ML20202A873 + (ML20202A873)
- ML20202A875 + (ML20202A875)
- ML20202A877 + (ML20202A877)
- 05000423/LER-1997-053, :on 971024,channel Check Surveillance Requirements Were Not in Compliance W/Ts.Caused by Inadequate Monitoring by Mgt of Surveillance Program. Procedures That Need to Require Channel Checks,Corrected + (ML20202A883)
- ML20202A884 + (ML20202A884)
- ML20202A885 + (ML20202A885)
- ML20202A887 + (ML20202A887)
- ML20202A888 + (ML20202A888)
- ML20202A889 + (ML20202A889)
- ML20202A890 + (ML20202A890)
- 05000321/LER-1997-006-03, :on 971031,apparent LPRM TIP Calibr Tube Failure Resulted in Primary Sys Pressure Boundary Leakage. Caused by Small Matl or Mfg Flaw in TIP Calibr Tube.Replaced Entire LPRM Assembly + (ML20202A891)
- IA-86-428, Responds to FOIA Request for Investigation Rept (Case 1-84-014) Re Harassment of QA Auditors at Unit 2.Rept & Accompanying Exhibits Available in Pdr.Portions of Records Withheld (Ref FOIA Exemptions 6 & 7) + (ML20202A892)
- ML20202A892 + (ML20202A892)
- ML20202A894 + (ML20202A894)
- ML20202A895 + (ML20202A895)
- ML20202A896 + (ML20202A896)
- ML20202A901 + (ML20202A901)
- ML20202A902 + (ML20202A902)
- 05000293/LER-1997-024, :on 971023,plant Valve Configuration for Inerting Primary Containment Was Outside Design Basis.Caused by Failure to Recognize Procedure Specified Valve line-up Could Result in Bypass Flow Path from Drywell Atmosphere + (ML20202A903)
- ML20202A904 + (ML20202A904)
- ML20202A905 + (ML20202A905)
- ML20202A906 + (ML20202A906)
- ML20202A907 + (ML20202A907)
- ML20202A909 + (ML20202A909)
- ML20202A911 + (ML20202A911)
- ML20202A912 + (ML20202A912)
- IR 05000409/1986006 + (ML20202A913)