Text
_,
- - - - - _ - - - - - _ _ _ .
- _ _ - _
s.
- .
e,
W
February 2, 1998
Mr. Walter G. MacFarland, IV
Chief Nuclear Officer
Clinton Power Station -
Idinois Power Company
Mall Code V 275
P.O. Box 678
Clinton,IL 61727
SUBJECT:
NRC RADIATION PROTECTION INSPECTION REPORT
50-461/98002(DRS)
Dear Mr. MacFarland:
On January 9,1998, '.he NRC completed an inspection at your Clinton Nuclear Power Station.
The enclosed report presents the results of this Inspection.
The inspection was an examination of activities conducted under your license as they relate to
radiation safety and to compliance with the Commission's rules and regulations and with the
conditions of your license. The inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with personnel. Specifically, the
inspection focussed on your respiratory protection program, radioactive material transportation
program, and the operability of area and process radiation monitors. No violations of NRC
requirements were identified.
. We observed strong ownership sr.d oversight of your respiratory protection program. The
program was well implemented, and your staff had taken initiatives to improve the program and
procedures. Your staff also properly implemonted the radioactive material tramportation
program. . Radioactive shipments were packaged properly, and shipping documents were well
prepared. We observed several minor inconsistencies conceming the implementing
procedures that your staff acknowledged and will resolve.
We also observed problems with the scheduling and completion of area and process radiation
monitor surveillances. The area and process radiation monitor control console, which is located
in the control room, has been continuously monitored by a radiation protection technician so
. that numerous nuisance alarms can be acknowledged in a timely manner. Operators indicated
that the control console is a distraction to them and that the data provided by the console may
not be reliable. Although your staff has recently placed a high priority on correcting these
issues, these problems have existed for a long period of time. This is a good example of your
staff's willingness to live with problems at the station.
\\
gt.ON
~
eso2 toots 6 9eo2o2
ADOCK05oogt
DR
ll 'l Ill.iI,llll 41
...
,
-___
_ - _ _ _ _ _ - _ _ _ _ _ _ _ _
o
A
- ,
W. G. MacFarland
2
February 2, 1998
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this W'er and its
enclosure will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have conceming this inspection.
Sincerely,
Original Signed by John A. Grobe
John A. Grobe, Director
Division of R3 actor Safety
Docket No. 50-461
License No. NPF-6
Enclosure:
Inspection Report 50 461/98002(DRS)
cc w/ encl:
W. D. Romberg, Assistant Vice President
R. Phares, Manager, Nuclear Safety and
Performance improvement
J. Sipek, Director- Licensing
Nathan Schloss, Economist,
Office of the Attomey General
G. Stramback, Regulatory Services
Project Manager, General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, Illinois Commerce Commission
Distribution
Docket File w/ encl
Rlli PRR w/ encl
Rlll Enf. Coordinator w/ encl
PUBLIC IE-01 w/enci
SRI, Clinton w/enct
TSS w/enci
LPM, NRR w/enct
J. L. Caldwell, Rlil w/enci
DOCDESK w/enci
- DRP w/ encl
A. B. Beach, Rill w/enct
CAA1 w/ encl
DRS w/ enc!
DOCUMENT NAME: G:\\DRS\\CLl98002.DRS (SEE PREVIOUS CONCURRENCE)
To receive e top of tMe document,ind6cate in tiis box: 'C's Co y w/o ottienci *E's Copy w en/enci *N" a No copy
r
~
FFICE
Rlli
1-
Rlli
l
Rlli
[
Rlli
a f(
NAME
SOrth:sd/jp
GShear
TKozak
JGrotQN
DATE
02/ /98
02/ /98
02/ /98
02/ # 4
OFFICIAL RECORD COPY
..
__
_
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _
<.
i
,
e.
J. G. Cook
2
Ir.' accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
We will gladly discuss ary questions you have conceming this inspection.-
Sincerely,
hl
John A. Grobe Director
Division of Reactor Safety
Docket No. 50-461
License No, i4PF-6
Enclosure:
Inspection Report 50-461/98002(DRS)
cc w/ encl:
W. D. Romberg, Assistant Vice President
W. G. MacFarland, IV, Chief Nuclear Officer
R. Phares, Manager, Nuclear Safety and
Performance improvement
J. Slpek, Director - Licensing
Nathan Schloss, Economist,
Office of the Attomey General
G. Stramback, Regulatory Services
Project Manager, General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, Illinois Commerce Commission
Distributl0D
Dockat Filo w/ encl
Rlli PRR w/enci
Rill Enf. Coordinator w/ encl
PUB'
IE-01 w/ encl
SRI, Clinton w/enci
TSS w/enci
LPM,
1w/ encl
J. L. Caldwell, Rllt w/enci
DOCDESK w/ encl
DRP, aci
A. B. Beach, Rlll w/e,1cl
CAA1 w/enci
>
DRS w/enci
DOCUMENT NAMt!: G:\\DRS\\CLl98002.DRS
To receive a com of this document. Indicate in the bou: *C's Co y wto sWond T = Copy wtaWend T = No co y
OFHCE
Rlli
l6
Rill
l (, Rjl
l(3
Rlli
l
NAME
SOrtn:sd/jpyo
GShear gb
TKozak &
JGrobe
'
DATE
01/X/98
01/4/98
01/W98
01/ /98
OFFICIAL RECORD COPY
. . . .
.
..
.
.
.
.
.