|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K1411999-06-16016 June 1999 Forwards Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety ML20195J6401999-06-14014 June 1999 Discusses Licensee 990331 Remediation Plan for Welds Susceptible to Intergranular Stress Corrosion Cracking at Quad Cities Nuclear Power Station,Unit 1 & Requests Licensee Address Concerns Discussed & Propose Plan to Implement C/A ML20207H6171999-06-14014 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/99-01 & 50-265/99-01,per 990217 & 0401 Ltrs Which Transmitted NOV Associated with Insp Repts 50-254/98-23 & 50-265/98-23 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206S3981999-05-14014 May 1999 Forwards Insp Repts 50-254/99-06 & 50-265/99-06 on 990307-0420.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206S1131999-05-13013 May 1999 Informs That on 990505 NRC Staff Held Planning Meeting for Plant to Identify Insp Activities at Facility Over Next 6 to 12 Months ML20206S1561999-05-12012 May 1999 Informs of Plans to Conduct Public Meeting on 990608 in Rock Island,Il to Present Planned Changes to NRC Regulatory Processes & Pilot Plant Program for Quad Cities Station ML20206N9621999-05-11011 May 1999 Forwards Insp Repts 50-254/99-08 & 50-265/99-08 on 990419-23.No Violations Noted.Insp Examined Efforts in Addressing Actions Requested in NRC GL 96-01, Testing of Safety Related Logic Circuits ML20206P8511999-05-11011 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions Will Be Examined During Future Insp ML20206P6811999-05-11011 May 1999 Confirms Discussion Between Members of Staff to Have Mgt Meeting at Qcs on 990608 in Training Bldg,Meeting Open to Public.Purpose of Meeting to Discuss Qcs Performance Described in PPR ML20206F3221999-05-0404 May 1999 Second Final Response to FOIA Request for Documents.Forwards Documents Listed in App B Maintained in PDR Under Request Number 99-134.Documents in App C Being Released in Part (Ref FOIA Exemptions 6) ML20206Q5701999-05-0303 May 1999 Informs That on 990420-21 NRC Senior Managers Met to Evaluate Nuclear Safety Performance of Operation Reactors, Fuel Cycle Facilities & Other Matl Licenses ML20206E0621999-04-30030 April 1999 Refers to Ceco Which Committed to Perform Future FW Nozzle Insps in Accordance with BWROG Alternate BWR FW Nozzle Insp Requirements Rept.Informs of Misunderstanding Re Condition 6 Implications in SER Which Approved Rept ML20205T4281999-04-22022 April 1999 Informs That Encl FEMA Correspondence Was Received on 990322,transmitting FEMA Evaluation Rept for 981007 Annual Medical Drill Conducted at Rock Island County for Quad City Nuclear Power Station.No Violations Were Noted ML20205Q5191999-04-16016 April 1999 Forwards SER Concluding That Quad Cities Nuclear Power Station,Unit 1 Can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML20205N9541999-04-0909 April 1999 Forwards Insp Repts 50-254/99-03 & 50-265/99-03 on 990308-12.No Violations Noted.Longstanding Materiel Condition Issues Continue to Be Problem,However Progress Had Been Made in Listed Areas ML20205J5691999-04-0707 April 1999 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Their Entirety ML20205F8031999-04-0202 April 1999 Forwards Draft Info Notice Describing Unanticipated Reactor Water Draindown of Listed Plants ML20205J2891999-04-0101 April 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990121-0306.Violations Identified Involving Failure to Follow Station Procedures for Use of Shutdown Cooling & Failure to Follow Station out-of-svc Tagging Procedures ML20196K9001999-03-31031 March 1999 Forwards Radiation Protection Insp Repts 50-254/99-07 & 50-265/99-07 on 990309-12.No Violations Were Identified.Insp Consisted of Review of Solid Radwaste Processing & Control Program & Radioactive Matls Shipping Program ML20205G5811999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990201 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20204E0611999-03-18018 March 1999 Discusses Review of Rev 8Q to Portions of Plant Emergency Plan Site Annex ML20207L7511999-03-15015 March 1999 Informs That Staff Offers No Objections to Util 990121 Change to Licenses DPR-29 & DPR-30,App a TSs Bases Sections 3/4.10.K & 3/4.10.L.Changes Clearly Identifies That RHR Scs Not Designed to Be Throttled Sufficiently to Maintain Rc 1999-09-09
[Table view] |
Text
...
Y. .
Februa_y 3, 1998 Mr. Oliver President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West lll 1400 Opus Place, Suite 500 Downers Grove,IL 60515 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS.
50 254/97027(DRS); 50-265/97027(DRS)
Dear Mr. Kingsley:
This will acknowledge receipt of your letter dated January 21,1908, in rasponse to our letter dated December 23,1997, transmitting a Notico of Vloiatloa associated with the subject inspection report at the Quad Cities Nuclear Power Station. We have reviewed your corrective actions and have no further questions at this time. These ccrective actions will be examined during future inspections.
Sincerely,
/s/ M. Leach for John A. Grobe, Director Division of Reactor Safety Docket No. 50-254 Docket No. 50-265 See Attached Distribution DOCUMENT NAME: G:DRS\QUA02028.DRS (See Previous Concurrence)
s. ....ru m s,a. m c..em m m r.cm a. - . se.mem OFFICE Rlll l Rlli Rill l Rlli v
'
NAME Holmberg.sd Gavula Ring Grobe pf4@
DATE 02/ /98 02/ /98 02/ /98 02/3/98 OFFICIAL RECORD COPY I
10 * 0 ll****'
11 lilliBliII,ll
'
9002100189 990203 * -
PDR ADOCK 05000254 v I
'
G PDR d
_ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _
__ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
.
.
EA 97 591 Mr. Oliver D. Itingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West lli 1400 Opus Place, Sulie 500 Downers Grove,IL 60515
<
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS.
50 254/97027(DRS); 50-265/97027(DRS)
Dear Mr. Kingsley:
This will acknowledge receipt of your letter dated January 21,1998, in response to our letter dated December 23,1997, transmitting a Notice of Violation associated with the subject inspection report at the Quad Cities Nuclear Power Station. We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.
Sincerely, John A. G obe, Director Division of Reactor Safety Docket No. 50-254 Docket No. 50-265 See Attached Distribution DOCUMENT NAME: G:DRS\QUA02028.drs
.. . . ~ .c.. c . , ~ ~ ~ .r . m ~ . . .
OFFICE Rlli lf Rill I# Rlli l4 % y Rlil NAME Holmberg:sdpA GavulaMt7 Ring.-d//4 ClaytX Grobe
' g/98 DATE 02/1/98 02/W98 L ' 02/~1198 N02/ /98 _
OFRCIAL RECORD COPY I
.
.. . . _ . _ _
.
... .
j ..
u..
{ - O. .2 . Februar1 3,1998 cc: M. Wallace, Chief of Sta#
D. Helwig, Senior Vice President f 'G. Stanley, PWR Vice President
- J. Perry, BWR Vice President ':
D. Farrar, Regylatory .
Services Manager .
I. Johnson, Lice %1ng Director f) '
. DCD - Licensing E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard Nathan Sch!oss, Economist OfSce of the Attorney General State Liaison Officer
- Chairman, Illinois Commerce _ :
Corrmission W. D. Leech, Managerof Nuclear MidAmerican Energy Company Distribution Docket File Rlli PRR Rlli Enf. Coordinator PUBLIC IE-01 SRI, Quad Cities TSS LPM,' NRR J. L. Caldwell, R!ll DR;' A. B. Beach, Rlli c .DRS DOCDEEM
)
i (
L D
m3 , .
6 m . ,. 9
__ .. . _ ____ - - - - - _
,
,
, . . . . . .
.
. , :. om u . ,o 7, ,,.4, n <,i , ,
,
,
w , :: o l SVP-98-010 January 21,1998 U, S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Co itrol De k Subject: Quad Cities Nuclear Power Station Units I and 2 NRC Docket Numbers 50 254 and 50-265 NRC Inspection Report Numbers 50-254/97027 and 50-265/97027 Ref2rence: (a) G. E. Grant to L. W. Pearce Letter dated December 23,1%7 Enclosed is Commonwealth Edi:on's (Comed's) response to the Notices of Violation (NOV) transmitted with the referenced letter. Level IV violation 97-027-04 cited that, the license ( was unable to retrieve records ofins:rsice inspection leakage tests of the Class I system, completed during the Unit I and Unit 21995 refueling outages, that were required by the American Society of Mechanical Er gineers Code (A5ME) Code Section XI. Level IV violation 97-027-05 cited a failure to generate a problem
' identification form following e.n alarm indicating the reactor vessel head inner 0-ring had failed. i This letter contains the following new commitment:
p Violation 97-027-04:
There are no new commitments for this violation.
,
t. Violation 97-027-05:
1. QCOP 0220-01, REACTOR VESSEL HEAD LEAK DETECTION SYSTEM, will be revised by March 1,1998 to ensure a PIF or Action Request is generated when the alarm condition is validated indicating an 0-ring failure.
(NTS#254100970270501)
_Ojo O DD D' JAN 2 61996
,. -- - - - _ - - - - - - - . >
__ ___ ____ _ - - - - - - - - - - - - - - - - - - - - - - - - - -
'
.
.
.
l.
USNRC SVP.98 010 2 January 21,1998 If you have any questions conceining this letter, please cor. tact Mr. Charles Peterson,
'. Regulatory Affairs hianager, at (309) 654-2241, extension 3609 Respectfully, S
E. S. Kraft, J (, .
6, .
Site Vice Presiderit
._
Quad Cities Station Attachment A," Response to Notice of Violation" cc: A. B. Beach, Regiont.1 Administrator, Region ill R. h1. Fulsifer, Project hianager, NRR
.
C. G. hiiller, Senior Resident Inspector, Quad Cities
.;
W. D. Leech, hiidAmerican Energy Company D. C. Tubbs, hiidAmerican Energy Company F. A. Spangenberg, Regulatory Affairs hianager, Dre: den '
INPO Records Center Office of Nuclear Facility Safety, IDNS s DCD License (both electronic and hard copies)
- h1. E. Wagner, Licensing, Comed SVP Letter File
,
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ . -
___ _ _ _ - -__-_ - - - - - - - - - - - - - - -
'
e s ATTACilMENT A
RESPONSE TO NOTICE OF VIOLATION SVP 98-010 (Page 1 of 3)
NOTICE OF VIOLATION (50-254(265)/97027-04)
10 CFR 50, Appendix B, Criterion XVII states,in part, that suflicient records shall be maintained to furnish evidence of activities afTeeting quality. These records include records of tests, which shall be identifiable and retrievable. <
Contrary to the above:
As of December 4,1997, the licensee was unable to retrieve records ofinsenice inspection leakage tests of the Class I system, completed during the Unit I and Unit 21995 refueling (
outages, that were required by the American Society of Mechanical Engineers Code (ASME)
Code Section XI.
This is a Severity Level IV Violation (Supplement 1) (VIO 50-254/97027-04(DRS);
50-265/97027-04(DRS)).
.,
REASON FOR TIIE VIOLATION:
Comed accepts the violation. The cause of this event was personnel error.
The original request to Central File for the information was made asking for QCOS 201-08, which wt.s the incorrect procedure number at the time in question. Due to this error, the records were not found. The Document Control Clerk in Central File then seerched all indexes by the name of the test procedure without regard for a tert number and was able to determine that the correct procedure number at the time of the test was QCOS 201-04 (OCOS 020108 replaced QCOS 0201-04 on 2/20/97). Once this was determined the Unit I report was rettmved 1/2/98.
The documentation for Q2R13, QCOS 201-04 insenice inspection lea'. age tests were not submitted by the Operations Department to Central File for permanen; retention. The originalis presumed lost, however a copy of the procedure attachments QCOS 201-04 Attachment F, 7 ages 1-9 were located in Engineering.
CORRECTIVE STEPS TAl EB. AND RESULTS ACillEVED A copy of QCOS 201-04, revision 3, Attachment F," Unit 2 Class 1 System Pressure h t Visual Walkdown Checklist" pages 1-9 were located and submitted to Central File for document retention. Records in storage were manually searched for the original Q2R13 inservice inspection leakage test documentation, QCOS 201-04, with negative results. Complete January 13, 1998.
_ ___ -_---------
", ,
ATTACllMENT A
'
. -
RESPONSE TO NOTICE OF VIOLATION SVP 98-010 -
(Page 2 of 3)
h CORRECTIVE STEPS TAKEN TO AVOID FURTilER VIOLATIONS
~
A previous Noti:e ofviolation 254/265/97 006-03 identified documant controlissues. The following corrective actions are comn.c.; to NOV 254/265/97-006-03 and NOV 254/265/97027 as both violations occurred prior to the implementation of these conective actions.
1. Fach department established a departmental Records Custodiaa.' Completed December 1996.
2. Procedure change to QCAP 1200-01, Station Records" was made to reflect Record Custodian responsibilities. Completed November 1996.
3. Training of the Records Custodians was completed DecemHr 1996.
4. Each department reviewed their retention schedule to include 4dentification ofquality records.
Completed November 1997.
5. QCAP 1200-01," Station Records" was revised to require a semi annual review of the retention schedule. Completed November 1997.
DATE WIIEN FULL col .PLIANCE WAS ACIllEVED Full- compliance was met on Januay 13.1998 when QCOS 201-04, revision 3, Attachment F,
" Unit 2 Class 1 System Pressure Test Visual Walkdown Checklist" pages 1-9 were loc 4ted and submitted to Central File for document retention.
._
_
<, ".-
p";c ATTACil.\ LENT A i RESPONSE TO NOTICE OF VIOLATION I
SVP 98-010 (Page 3 of 3)
NOTICE OF VIOLATION (50-254;265/97027-05)
10 CFR 50 Appendix B, Criterion XVI states in part that " measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions...are promptly identified and corrected."
Contrary to the above, as of November 5,1997, the license 2 had fai:ed to implement the corrective action process for the failed Unit I reactor vessel flange inner 0-ring seal. Specifically, a continuous alarm condition indicative of an inner 0 .ing seal failure had existed since August 31,1996 and the licensee had not initiated a problem identification form.
This is a Severity Level IV violation (Supplement 1).
Reason for violation:
Comed accepts this viciation.
'
The cause of the failure to initiate a problem identification iorm (PIF) on August 31,1996 was a historical lack of Station seasitivity to this alarm condition and the inner 0-ring failure it represented.
Corrective Actions ta!:-n:
PIF Q1997-04261 was initiated on November 6,1997 to document the deficient inner O-ring 3 condition identified on August 31,1996.
Corrective Actions to prevent further occurrence:
.QCOP 0220-01, REACTOR VESSEL HEAD LEAK DETff_ TION SYSTEM, will be revised by March 1,1998 to ensure a PIF tr Action Request is generated when the alarm condition is validated indicating an 0-ring failure. (NTS#254100970270301; Operations)
Date When Full Compliance will be met:
Full compliance was met on November 6,1997, with the PlF initiation described above.
,.
- - _ _ - _ _ _ _ - _ _ - l