Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000373/LER-1986-019-02, :on 860521,RCPB Pipe Leaks Found Coming from RHR Loop Injection Piping.Possibly Caused by Entrapped Slag or Other Defect in Plug Seal Weld.Coupling Will Be Capped + (ML20199F963)
- NOC-AE-000398, Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved + (ML20199F964)
- ML20199F967 + (ML20199F967)
- ML20199F969 + (ML20199F969)
- IR 05000373/1997013 + (ML20199F974)
- ML20199F975 + (ML20199F975)
- ML20199F977 + (ML20199F977)
- ML20199F979 + (ML20199F979)
- 05000352/LER-1986-015, :on 860304,main Control Room Ventilation Sys Isolated & Train B of Control Room Emergency Fresh Air Sys Started.Caused by Breakage of Chlorine Analyzer Tape D. Chlorine Detection Sys Temporarily Installed + (ML20199F980)
- ML20199F981 + (ML20199F981)
- 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With + (ML20199F983)
- ML20199F986 + (ML20199F986)
- ML20199F988 + (ML20199F988)
- ML20199F989 + (ML20199F989)
- ML20199F990 + (ML20199F990)
- ML20199F991 + (ML20199F991)
- ML20199F993 + (ML20199F993)
- ML20199F995 + (ML20199F995)
- ML20199F996 + (ML20199F996)
- ML20199F998 + (ML20199F998)
- ML20199F999 + (ML20199F999)
- ML20199G001 + (ML20199G001)
- ML20199G002 + (ML20199G002)
- ML20199G004 + (ML20199G004)
- NSD-NRC-97-5438, Forwards 3 Copies of W Responses to NRC RAIs 440.731-440.734,relating to AP600 MSSV TS 3.7.2.W Status for Open Item Tracking Sys Item 5998-6001 Are Action N.Status for Item 4464 Is Confirm W to Track Pending SSAR & TS Rev + (ML20199G005)
- ML20199G006 + (ML20199G006)
- ML20199G007 + (ML20199G007)
- ML20199G010 + (ML20199G010)
- ML20199G011 + (ML20199G011)
- ML20199G013 + (ML20199G013)
- ML20199G014 + (ML20199G014)
- ML20199G015 + (ML20199G015)
- NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr + (ML20199G018)
- ML20199G019 + (ML20199G019)
- LIC-98-0011, Forwards Revised Section 10.0, On-site Results for Analysis to Support Removal of FCS Toxic Gas Monitoring Sys, Originally Attachment 2 to 950109 Application for Amend to License,Per Discussions W/Nrc + (ML20199G021)
- ML20199G023 + (ML20199G023)
- ML20199G024 + (ML20199G024)
- ML20199G026 + (ML20199G026)
- IR 05000232/2010001 + (ML20199G027)
- ML20199G030 + (ML20199G030)
- ML20199G033 + (ML20199G033)
- ML20199G034 + (ML20199G034)
- ML20199G035 + (ML20199G035)
- ML20199G036 + (ML20199G036)
- ML20199G038 + (ML20199G038)
- ML20199G039 + (ML20199G039)
- 05000443/LER-1998-013, :on 981214,discovered That Six Valves Were Incorrectly Omitted from Scope of IST Program.Caused by Inadequate Review of IST Program Scope.Subject Valves Will Be Repaired or Replaced Prior to Completion of Upcoming RFO + (ML20199G040)
- ML20199G042 + (ML20199G042)
- ML20199G044 + (ML20199G044)
- 05000338/LER-1985-005, :on 850503 & 05,during Full Power Operation, Semiannual Functional Test on Seismic Triaxial Response Spectrum Recorder Not Performed.Caused by Inaccessible Device.Tech Specs Changed to Delete Test + (ML20199G045)
- IR 05000413/1997012 + (ML20199G046)