Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199E697 + (ML20199E697)
- ML20199E701 + (ML20199E701)
- RBG-23801, Suppls 851204 & 860401 Responses to Violations Noted in Insp Rept 50-458/85-71.Corrective Actions:Instrument Setpoints Calibr During Surveillance Test Procedure & Review of Tech Spec Setpoints for List of Affected Procedures Performed + (ML20199E702)
- B16850, Submits Response to Request for Addl Info Re Standby Gas Treatment Sys License Amend Request.Util Will Continue to Keep Staff Apprised of Progress Regarding Issue + (ML20199E703)
- PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With + (ML20199E704)
- ML20199E705 + (ML20199E705)
- ML20199E706 + (ML20199E706)
- ML20199E707 + (ML20199E707)
- ML20199E708 + (ML20199E708)
- RBG-23818, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-08.Corrective Actions:Procedure NUPE-AA-54 Revised to Require Design Sys Engineer to Ensure Documentation Received from Vendor or Agent Officially Signed & Dtd + (ML20199E709)
- ML20199E710 + (ML20199E710)
- ML20199E713 + (ML20199E713)
- ML20199E714 + (ML20199E714)
- RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With + (ML20199E715)
- ML20199E716 + (ML20199E716)
- PNO-III-98-035, on 980624,plant Automatically Shut Down After Tornado Damaged Electrical Switchyard & Cut Off Offsite Power Supply.Licensee Declared Alert Under Emergency Plan. Licensee Assessing Extent of Damage + (ML20199E718)
- ML20199E719 + (ML20199E719)
- ML20199E720 + (ML20199E720)
- ML20199E721 + (ML20199E721)
- ML20199E724 + (ML20199E724)
- IR 05000498/1982002 + (ML20199E725)
- ML20199E727 + (ML20199E727)
- ML20199E731 + (ML20199E731)
- ML20199E732 + (ML20199E732)
- ML20199E733 + (ML20199E733)
- ML20199E734 + (ML20199E734)
- BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With + (ML20199E735)
- ML20199E737 + (ML20199E737)
- ML20199E738 + (ML20199E738)
- ML20199E740 + (ML20199E740)
- ML20199E741 + (ML20199E741)
- RBG-23862, Forwards Addendum to Semiannual Radioactive Effluent Release Rept for Oct-Dec 1985,providing Info on Sr-90,Sr-89 & Fe-55 Releases.Erratum to Semiannual Radioactive Effluent Release Rept for Oct-Dec 1985 Also Encl + (ML20199E742)
- ML20199E743 + (ML20199E743)
- ML20199E744 + (ML20199E744)
- ML20199E747 + (ML20199E747)
- ML20199E748 + (ML20199E748)
- NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With + (ML20199E750)
- ML20199E751 + (ML20199E751)
- ML20199E752 + (ML20199E752)
- PY-CEI-NRR-0469, Forwards List of Tech Spec Changes to Accompany Full Power Ol,Representing Minor Editorial Corrections,Clarifications & Enhancements.Justifications & Proposed marked-up Tech Spec Pages Also Encl + (ML20199E755)
- ML20199E756 + (ML20199E756)
- ML20199E758 + (ML20199E758)
- 05000213/LER-1997-019, :on 970808,compensatory Sampling Frequency Exceeded W/Rms Determined Inoperable.Caused by Personnel Error Due to Incorrect Interpretation of Ts.Compensatory Sampling to Be Conducted in Time Frame Required + (ML20199E759)
- ML20199E760 + (ML20199E760)
- ML20199E761 + (ML20199E761)
- IA-97-265, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in Pdr.App B Records Being Withheld in Part (Ref FOIA Exemption 6) + (ML20199E762)
- ML20199E762 + (ML20199E762)
- ML20199E764 + (ML20199E764)
- ML20199E765 + (ML20199E765)
- ML20199E766 + (ML20199E766)
- ML20199E767 + (ML20199E767)