ML20199E743

From kanterella
Jump to navigation Jump to search
FOIA Request for Documents on F Peguese Allegations Re Const Defects,Improper Procedures,Poor QA & Instances or Allegations of Water Leaking Into Containment,Cracking &/Or Lack of Integrity in Basemat,Floors,Foundations or Walls
ML20199E743
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/07/1985
From: Bell N
NUCLEAR INFORMATION & RESOURCE SERVICE
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-85-358 NUDOCS 8603270431
Download: ML20199E743 (2)


Text

-

' k/

8 :

%$c Nucear n"ormation and Resource Service 1346 Connecticut Avenue NW. 4th Floor. Washington. D C 20036 (202) 296 7552 May 7, 1985 FRES)OM Or INFORMATlDN James M. Felton, Director b

Division of Rules and Records Office of Adminstration For A-B5-358 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 gs[ 5//G/$5 FREEDOM OF INFORMATION ACT REOUEST

Dear Mr. Felton:

Pursuant to the Freedom of Information Act, 5 U.S.C.

522,'as amended, the Nuclear Information and Resource Service requests the following documents regarding the Shearon Harris Plant on behalf of Wells Eddleman, intervenor in the operating license proceedings.

Please consider " documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, meeting minutes, working papers, graphs, charts, diagrams, notes i

and summaries of conversations and interviews, computer records, and any other forms of written communication, including internal NRC Staff memoranda.

The documents are specifically requested from, but not limited to, the Office of Inspection and i

Enforcement (I&E); Office of the Executive Legal Director (OELD);

Office of Nuclear Reactor Regulation (NRR).

In your response, please identify which documents correspond to which requests j

below.

Pursuant to this request,'please provide all documents prepared or utilized by, in the possession of, or routed through the NRC related to:

1.

Allegations made by Frank Peguese regarding construction defects, improper procedures, poor quality assurance or other. complaints about the Shearon Harris plant; and 2.

Instances or allegations of water leaking into the containment, cracking and/or lack of integrity in the basemat, floors, foundations, walls, entrances, penetrations or other parts of the Shearon Harris containment building, equipment storage warehouse, waste processing building, fuel handling building, auxiliary building, turbine building, and diesel generator building.

In our opinion, it is appropriate in this case for you to waive search charges, pursuant to 5 U.S.C. 552 (a) (4) ( A) "because furnishing the information can be considered as primarily 8603270431 850507 PDR FOIA BELL 85-350 PDR

benefiting the general public."

The Nuclear Information and Resource Service is a-non-profit organization serving local organizations concerned about nuclear power and providing infor-mation to the general public.

Information required by 10 CFR 4

9.14a was provided by letter dated August 3, 1984. Wells

~

Eddleman, for whom this information is requested, is an active intervenor in the operating. license proceedings for the Shearon Harris plant.

Sincerely, m3 Nina Bell Assistant Director cc: File A

4 e

n 4

--,--o,

-r-

--w---

rw--

4-n-,--

,-s

, - - +,,- --

,m-o,