Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A908 + (ML20199A908)
- NPL-98-0039, Forwards Response to Violations Noted in Insp Rept 50-266/97-21 & 50-301/97-21.Corrective Actions:On 971128, Operability Determination Developed Which Provided Reasonable Assurance as to Operability of CCW Sys + (ML20199A910)
- ML20199A912 + (ML20199A912)
- ML20199A913 + (ML20199A913)
- NPL-97-0743, Forwards Rev to Pbnp Security Plan Section 2.4,dtd 971114 IAW Provisions Outlined in 10CFR50.54(p).Security Plan Withheld as Subject Matter Contains Safeguards Info + (ML20199A914)
- ML20199A917 + (ML20199A917)
- 05000295/LER-1986-022-01, :on 860512,auto-start of Auxiliary Feedwater Pumps Occurred During Draining of Steam Generator During Water Chemistry Mods.Caused by Lack of Procedure for Draining.Procedures Revised + (ML20199A919)
- BSEP-98-0015, Provides Plans for re-inspection of Core Shroud for Unit 1. Reinspections Planned for Upcoming Refueling Outage 11,which Is Presently Scheduled to Begin on 980425,per GL 94-03 + (ML20199A920)
- ML20199A924 + (ML20199A924)
- ML20199A925 + (ML20199A925)
- ML20199A927 + (ML20199A927)
- ML20199A928 + (ML20199A928)
- ML20199A929 + (ML20199A929)
- ML20199A930 + (ML20199A930)
- ML20199A933 + (ML20199A933)
- ML20199A935 + (ML20199A935)
- ML20199A938 + (ML20199A938)
- ML20199A942 + (ML20199A942)
- IR 05000220/1997007 + (ML20199A945)
- ML20199A946 + (ML20199A946)
- ML20199A947 + (ML20199A947)
- IR 05000409/1997001 + (ML20199A950)
- ML20199A951 + (ML20199A951)
- BECO-LTR-97-110, Forwards Addendum to Rept of Changes,Tests & Experiments Performed at Pilgrim Nuclear Power Station for Period 960101-970421.Addendum Includes Remaining Items for Original Rept + (ML20199A952)
- ML20199A953 + (ML20199A953)
- ML20199A954 + (ML20199A954)
- ML20199A955 + (ML20199A955)
- ML20199A957 + (ML20199A957)
- ML20199A958 + (ML20199A958)
- ML20199A960 + (ML20199A960)
- ML20199A961 + (ML20199A961)
- ML20199A963 + (ML20199A963)
- ML20199A964 + (ML20199A964)
- ML20199A965 + (ML20199A965)
- ML20199A967 + (ML20199A967)
- ML20199A968 + (ML20199A968)
- ML20199A969 + (ML20199A969)
- ML20199A970 + (ML20199A970)
- ML20199A972 + (ML20199A972)
- ML20199A975 + (ML20199A975)
- ML20199A976 + (ML20199A976)
- IR 05000461/1997015 + (ML20199A977)
- ML20199A980 + (ML20199A980)
- ML20199A981 + (ML20199A981)
- ML20199A982 + (ML20199A982)
- 05000461/LER-1997-033, :on 971218,shift Supervisor Recognized That Containment Bldg Fuel Transfer Pool Ventilation Plenum Exhaust Radiation Monitors Declared Inoperable.Caused by Misinterpretation of Tech Specs.Operations on TS Revised + (ML20199A983)
- ML20199A984 + (ML20199A984)
- L-97-060, Forwards Revised EPIPs for NRC Parties IAW 10CFR50.4.Changes Do Not Decrease Effectiveness of Plant & Plan Continues to Meet Requirements of 10CFR50,App E + (ML20199A985)
- ML20199A986 + (ML20199A986)
- ML20199A987 + (ML20199A987)
- ML20199A992 + (ML20199A992)