ML20199A972
| ML20199A972 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/15/1998 |
| From: | Hughey W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-92-01, GL-92-1, GNRO-98-00007, GNRO-98-7, NUDOCS 9801280135 | |
| Download: ML20199A972 (2) | |
Text
e 1 &g
,O V Ent:rgy operations. Inc.
Ro Box 7se O/
Port Gbson, MS 391EO
+
Tv 601437-6470 W. K. Hughey Drector Nuclear Sa%fy & Reagtdatory January 15,1998
^ " "
- U.S. Nuclear Regulatory Commission Mail Station P1-37
- Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Reactor Pressure Vessel Structural Integrity Assessment GNRO-98/00007 Gentlemen:
By letter dated August 22,1996, the Nuclear Regulatory Commission (NRC) provided closeout to the Grand Gulf Nuclear Station (GGNS) response to Generic Letter 92-01, Revision 1, Supplement 1. In the letter, the NRC requested to be
. informed in writing if a plant-specific assessment of the GGNS Reactor Pressure Vessel (RPV) would be performed based on the results of a BWR Vessel and I g Internals Project (BWRVIP) generic assessment of RPV structural integrity expected to be completed in 1997.
The BWRVIP assessment report was received by GGNS in December,1997 (reference 1)' The results of evaluation of all relevant data indicate that GGNS does not have significant weld chemistry variability and therefore pressure-temperature (P-T) limits are not affected. Based on the referenced report, a plant-specific assessment cf RPV integrity is not necessary and will not be performed.
Please contact Tom Williamson at (601)-437-2498 should you have any questions or require any additional information.
Yours trul W
f,ll)fblfhfhff[f lfllff]llf TLW.be cc:
(see next page)
' Update of Bounding Assessment of BWRCAi Reactor Pressure Vesselintegrity issues,"
BWRVlP-08NP, Supplement 1, BWR Vessel and Intemals Project, November,1997
.n 9901280135 990115 PDR ADOCK 03000416 p
PDR' n
s
GNRO g'8/0000'7 Page 2 of 2 cc:
Ms. J. L. Dixon-Herrity, GGNS Senior Resident (w/a)
. Mr. L. J. Smith (Wise Carter)(w/a)
Mr. N. S. Reynolds (w/a)-
Mr. H. L. Thomas (w/o)
Mr. E. N Merschoff (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission I
Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX-76011
[.
. Mr. J. N. Donohew, Project Manager (w/2) l Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington,-D.C. 20555 -
I k
_ _ - - - _