s 3 0 MAY 1986 s
Docket No. 50-289 MEMORANDUM FOR: Harry Kister, Chief Projects Branch No. 1 FROM:
Allen R. Blough, Chief Reactor Projects Section IA
SUBJECT:
TMI-1 STATUS REPORT FOR THE PERIOD May 23-30, 1986 Enclosed is the TMI-1 weekly status report from the NRC Resident Office at TMI-I for the subject period.
The NRC staff continued to monitor routine plant operations at full power.
TMI-1 status reports are intended to provide NRC management and the public with highlights from an NRC regulatory perspective of TMI-1 activities for the previous week. Subsequent inspection reports will address many of these topics in more detail, b
Allen R. Blough, Chief Reactor Projects Section 1A Branch 1, DRP
Enclosure:
As stated 9606160285 860530 ADOCK 0500 9
gDR I i
t.
Harry Kister 2
3 0 MAY 1986 cc w/ enclosure:
L F. Miraglia, NRR W. Travers, NRR J. Thoma,-NRR J. Partlow, IE T. Gerusky, BRP/ DER,' Commonwealth of Pennsylvania R. Benko, Governor's Office of Policy, Commonwealth of Pennsylvania TMI Alert Susquehanna Valley Alliance Friends & Family of TMI Public Document Room Local Public Document Room bec w/ enclosure:
K. Abraham, RI l t P..Lohaus, RI R. Starostecki, RI H. Kister, RI R. Conte, RI (20 cys)
W. Baunack, RI Region I Docket Room (w/ concurrences) 1 l
(
l
[f g
RI:DRP RI:DRP RI:DRP gs>
Conte l
Blough Kister l
5/ 7 '86 5/h86 SfG86 t
f.
ENCLOSURE l
TMI-1 STATUS REPORT FOR THE PERIOD May 23 - 30, 1986 l
l 1.
Plant Status As of 8:00 a.m. on May 30, 1986, TMI-1 was operating at 100 percent power and at normal reactor coolant temperature (579 F) and pressure (2155 psig).
2.
Facility Operations Summary The plant continued to operate at 100 percent during the reporting period. No significant safety problems were identified during the report period.
3.
NRC Staff Status During the Period During this report period, the NRC staff consisted of the senior resi-dent inspector and three resident inspectors. The reactor projects section chief was on site May 28.
The NRC staff at TMI-I was comprised of the following personnel during the period:
A. R. Blough, Chief, Reactor Projects Section 1A R. Conte, Senior Resident Inspector C. Hix, Secretary D. Johnson, nesident Inspector J. Rogers, Resident Inspector F. Young, Resident Inspector
- _ - _ _ _ _ _ _ _ _ _