Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A529 + (ML20199A529)
- 3F0198-34, Forwards Summary of Evaluation of Dynamic Effects of Pressurizer Surge Line LOCA Other Systems & Components,In Response to NRC 971222 Rai.Commitments Made by Util,Encl + (ML20199A530)
- ML20199A531 + (ML20199A531)
- ML20199A532 + (ML20199A532)
- ML20199A534 + (ML20199A534)
- ML20199A535 + (ML20199A535)
- ML20199A536 + (ML20199A536)
- 05000259/LER-1997-004, Forwards LER 97-004-00 Re Discovery of non-conservative TS Lco.Will Submit TS Change Request to NRC to Remove non- Conservatism + (ML20199A537)
- ML20199A540 + (ML20199A540)
- ML20199A543 + (ML20199A543)
- ML20199A546 + (ML20199A546)
- ML20199A547 + (ML20199A547)
- ML20199A548 + (ML20199A548)
- 05000259/LER-1997-004-04, :on 971010,discovered That RHR Swp LCO Is non- Conservative.Caused by Error in Preparation & Approval of Original TS 3.5.C.Will Submit TS Change to NRC to Remove non-conservatism from TS 3.5.C + (ML20199A549)
- ML20199A552 + (ML20199A552)
- ML20199A553 + (ML20199A553)
- PY-CEI-NRR-2354, Forwards Supplemental Info on 951102 LAR Re Fuel Handling Accident Reanalysis,Which Would Permit PNPP to Be Lead Plant for Subject Generic Lar.Results of CR Radiological Dose Calculation for Fuel Handling Accident,Included + (ML20199A556)
- ML20199A558 + (ML20199A558)
- ML20199A559 + (ML20199A559)
- 05000483/LER-1997-009, :on 971014,determined That Callaway Plant Had Not Complied W/Ts 4.5.2.b.1 Requirement for Venting Pump Casings of HHSI Pumps Since Plant Startup.Caused by Misinterpretation of Ts.Plant Mod Implemented + (ML20199A560)
- ML20199A564 + (ML20199A564)
- ML20199A565 + (ML20199A565)
- ML20199A566 + (ML20199A566)
- ML20199A568 + (ML20199A568)
- ML20199A569 + (ML20199A569)
- ML20199A570 + (ML20199A570)
- ML20199A573 + (ML20199A573)
- ML20199A575 + (ML20199A575)
- ML20199A576 + (ML20199A576)
- ML20199A577 + (ML20199A577)
- ML20199A578 + (ML20199A578)
- ML20199A581 + (ML20199A581)
- ML20199A582 + (ML20199A582)
- ML20199A583 + (ML20199A583)
- 05000440/LER-1997-014, :on 971014,inoperable CR Was Partially Withdrawn from Reactor Core & Reinserted During CR Testing. Caused by RO Not Appropriately Questioning CR Operability. Both Day & Nightshifts Were Coached + (ML20199A585)
- ML20199A586 + (ML20199A586)
- ML20199A587 + (ML20199A587)
- ML20199A588 + (ML20199A588)
- ML20199A590 + (ML20199A590)
- ML20199A591 + (ML20199A591)
- ML20199A592 + (ML20199A592)
- ML20199A593 + (ML20199A593)
- ML20199A594 + (ML20199A594)
- ML20199A595 + (ML20199A595)
- ML20199A597 + (ML20199A597)
- ML20199A599 + (ML20199A599)
- ML20199A600 + (ML20199A600)
- ML20199A602 + (ML20199A602)
- ML20199A604 + (ML20199A604)
- ML20199A605 + (ML20199A605)
- ML20199A608 + (ML20199A608)