ML20199A529

From kanterella
Jump to navigation Jump to search
Forwards Cns,Unit 2 Class Mc ISI Summary Rept for Refueling Outage EOC9, Per 10CFR50.55a(b)(2)(x)
ML20199A529
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/07/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199A533 List:
References
NUDOCS 9901130057
Download: ML20199A529 (2)


Text

_ ______-

  • 1 ..

a i d~# \

Duk) Energy C:rporati n I fxm)

.E C =

Catawba Nudear Stadon 4800 Concord Road York, SC 27745 Gauy R. Petetson (803) 831-4251 omCE Vice hident (803) 831-3426 fax January 7, 1999 U.S. Nuclear Regulatory Commission Washington,.D.C. 20555-0001 l ATTENTION: Document Control Desk

SUBJECT:

Duke Energy Corporation Catawba Nuclear Station - Unit 2 Docket No. 50-414 Inservice Inspection Summary Report for Class MC Component Examinations Conducted During Refueling Outage EOC9 Pursuant to 10 CFR 50.55a (b) (2) (x), Duke Energy Corporation submits the attached ISI Summary Report for ASME Class MC Inservice Inspections conducted during refueling outage EOC9.

Please n'ote that IWA-6000 of the ASME Code,Section XI, 1992 Edition with the 1992 Addenda requires an ISI Summary Report to

'be completed only for Class 1 and 2 components. As such, an ISI Summary. Report is not required by the ASME Boiler and Pressure Vessel Code,Section XI, for Class MC components.

However, because 10 CFR 50.55a (b) (2) (x) (A) requires specific information regarding Class MC examinations to be

included in the Summary Report, a Class MC ISI Summary Report has been prepared, but includes only that information required by 10 CFR.50.55a.

/

Questions regarding the attached report may be directed to M.

J. Ferlisi at (704) 382-3923. ,

j Very truly y ,

/

.G. R. Peterson GRP/ljr p.,

.s , .h

,O 9901130057 990107 Q PDR ' ADOCK 05000414f;

.G. PDR U

U.- lS. Nuclear Riigulatory Commission

' January 17; 1999 Page 2-A tachment:-

Duke Energy Corporation-Catawba Nuclear Station Unit 2

, Class MC_ ISIS Summary Report for Refueling Outage EOC9 LPages'1 through 19-xc w/att: L.'A. Reyes,' Regional 1 Administrator-U.S. Nuclear Regulatory Commission, Region-II Atlanta-Federal Center 61 Forsyth St.,-SWW,-Suite 23T85

, Atlanta, GA 30303-P. S.-Tam, NRC Project Manager'(CNS)

U. S. Nuclear Regulatory. Commission Mail'Stop O-14 H25; Washington, DC_ 20555-0001 D. J. Roberts, NRC Senior Resident Inspector (CNS)

A