Voided Rev 86 to Table of Contents for Procedure QI-QCP-1.1-0, Mechanical QC Discipline Manual
ML20199A575
Person / Time
Site: Comanche Peak, 05000000
Issue date: 09/09/1980
From:
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML17192A346 List:
References
FOIA-85-313, FOIA-85-59, FOIA-86-A-20 QI-QCP-1.1, QI-QCP-1.1-0, NUDOCS 8606120496
Download: ML20199A575 (3)


Text

{{#Wiki_filter:' BROWN & ROOT, IfiC. ISSUE CPhES NUMBER REVISION DATE PAGE ( JOB 3S-1195 QI-0CP-1.1-C 86 09-09-80 1 of 3 HECHAUCAL CC DISCIPLINE fdANUAL INFORMATION TABLE OF CONTENTS PROCEDURE / CTIVE INSTRUCTION NO. TITLE REVIS ION IPMErITD60y O) CP-QP-11.6 REPORTING OF PERMANENT PLANT EQL 1 CP-QP-11.-10 INSPECTION OF ELECTRICAL RACEWAY SUPPORT SYSTEM 0 j QI-CP-11.10-1 INSPECTION OF EXPOSED C0flDUIT RACEWAY SUPPORT 2 QI-CP-11.10-2 CABLE TRAY HANGER INSPECTION 1 QI-CP-11.10-3 INSPECTION OF BULK FABRICATED CABLE TRAY, CONDUIT AND COMPONENT PIECES 2 CP-QP-18.0 INSPECTION REPORT 4 ( QI-CP-18.1-1 MONITORING WELDING VITIES U QI-QAP-11.1-1 QUALITY CON UR EIb.d)CE OF WELDER PERFORMANCE OUALIFI T ON TEST. O CT10h ' S\\T VN ELLANEOUS AND STRUCTURAL QI-QAP-11.1-2 INS STEEL ABRIC AND INSTALLATION 0 QI-QAP-11.1-3 CONTROL SITE FABRICATED MISCELLANEOUS / STRUCTURAL STEEL MATERIAL TRACEABILITY 0 t QI-QAP-11.1-4 uELD INSPECTION OF STAI:LESS STEEL LINERS 0 QI-QAP-11.1-S ASME SECTION III TRACEASILITY REQUIREMENTS 2 QI-QAP-11.1-6 INSPECTION OF THE INSTALLATION OF PIPING TO BE EMBECOED IN C0flCRETE O Q I-QAP-11.1-7 RECUEST FOR RE0VALIFICATI0t; 0F i: ELDER 5 SY ANI O O!-0AP-11.1-28 IllSTALLATION OF IflSPECTIO'IS CF ASME COMP 0: LENT UPCCITS, CLASS 1, 2, & 3 1 CP-0A?-15.1 FIELD CC.1 TROL OF itiSPECT:'"I STATUS OF ITEMS At:0 l'ATER i AL 0 ( CP-CA?-16.1 C0'!T20L OF N0'ICCitF0Ff'It:G lTE!!S 3 t O! 2 P-16.1-1 FIELD GEFIECIE ;C.Y RE?Qo.TidG 2 8606120496 860604 PDR FOIA " 7 GARDE 86-A-20 PDR

nu_,

BROWN & ROOT, INC. ISSUE CPSES NLNBER REVISION DATE PAGE J08 35-1195 QI-0C P-1.1-0 86 09-09-80 2 of 3 QI-QAP-16.1-2 DOCUMENTING MINIMUM WALL VIOLATIONS AMD ARC STRIKE REPAIRS ON NDE REPORT FORM 1 QI-Q3P-16.1-4 MATERIAL UPGRADING 0 CP-CPM 6.3 PREPARATION, APPROVAL AND CONTROL OF OPERATION TRAVELERS 7 CP-CPM-6.9 GENERAL PIPING AND INSPECTION PROCEDURE 1 CP-CPM-6.9A DRAWINGS 1 I CP-CPM-6.98 WELDING FILLER MATERIAL CONTROL 0 CP-CPM-6.9C MATERIAL IDENTIFICATION 1 CP-CPM-6.9D WELDING AND RELATED PROCESSES 0 QI-QAP-11.1-26 (SUPPLEMENT 6.90-II) ASME WELD INSPECTIONS 4 CP-CPM-6.9E PIPE FABRICATION AND INSTALLATION 1 QI-QAP-11.1-23 (SUPPLEMENT 6.9E-I) QC INSTRUCTIONS FOR PIPE FABRICATION AND INSTALLATION 2 QI-QAP-11.1-27 (SUPPLEMENT 6.9E-II) INSPECTION OF INSTALLATION OF PIPING TO BE IMBEDDED IN CONCRETE O l CP-C PM-6.9 G DOCUMENTATION FOR ASME WELDING, FABRICATION, AND INSTALLATION ACTIVITIES 1 QI-0AP-11.1-25 (SUPPLEMENT 6.9G-II) OVALITY ASSURANCE REVIEW OF ASME III DOCUMENTATION 5 CP-CPM-6.9H CLEANLINESS CONTROL 0 h]gJg CP-CPM-6.9-I PRESSURE TESTING 0 COPY 3)RV s n .l ,, ~ -

L n

- :- - ~: " ' ~ ~ f a'.

BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOS 35-1195 ( QI-0C P-1.1-C 86 09-09-80 3 of 3 QI-QAP-11. I-24 (SUPPLEMENT 6.9I-1) INSPECTIO?! 0F PRESSURE TESTING 2 CP-CPM-6.10 INSPECTED ITEM REMOVAL NOTICE F0PJ1 2 CP-CPM-9.9 NHS - SEISMIC CATEGORY II SUPPORTS 0 CP-CPM-9.10 INSTALLATION OF ASME-RELATED COMPONENT SUPPORTS 0 QI-MCP-10.1 MECHANICAL EQUIPMENT STORAGE MAINTANCE O ~ INFORMATION ~ PPRV c I t ---a. = =}}