Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198L697 + (ML20198L697)
- ML20198L698 + (ML20198L698)
- ML20198L699 + (ML20198L699)
- 05000416/LER-1986-017, :on 860430,wrong Fuse Pulled During Attempt to Deactivate Containment Isolation Valve Causing Actuation of Combustible Gas Control Subsystem A.Fuse Reinserted & Sys Returned to Standby.Operator Disciplined + (ML20198L700)
- ML20198L701 + (ML20198L701)
- ML20198L705 + (ML20198L705)
- ML20198L706 + (ML20198L706)
- ML20198L708 + (ML20198L708)
- ML20198L712 + (ML20198L712)
- ML20198L713 + (ML20198L713)
- ML20198L717 + (ML20198L717)
- ML20198L720 + (ML20198L720)
- ML20198L721 + (ML20198L721)
- ML20198L722 + (ML20198L722)
- PNO-III-89-085, on 891206,three Employee Entered Irradiation Cell Assuming That Co-60 Sources Had Been Fully Retracted Into Shielded Position Near Botton of 23 Ft Pool of Water. Licensee Determined That Limit Switch/Interlock Sys Failed + (ML20198L726)
- ML20198L730 + (ML20198L730)
- ML20198L731 + (ML20198L731)
- ML20198L732 + (ML20198L732)
- ML20198L735 + (ML20198L735)
- IR 05000271/1997013 + (ML20198L741)
- ML20198L742 + (ML20198L742)
- ML20198L743 + (ML20198L743)
- ML20198L745 + (ML20198L745)
- IR 05000263/1997016 + (ML20198L748)
- ML20198L752 + (ML20198L752)
- ML20198L753 + (ML20198L753)
- IR 05000271/1998013 + (ML20198L754)
- ML20198L757 + (ML20198L757)
- IR 015000038/1997001 + (ML20198L758)
- ML20198L763 + (ML20198L763)
- PNO-III-89-075, on 891122,startup Process of Reactor Was Terminated When Nuclear Instrumentation Showed That Reactor Was Approaching Criticality Sooner than Anticipated + (ML20198L764)
- ML20198L765 + (ML20198L765)
- ML20198L766 + (ML20198L766)
- ML20198L767 + (ML20198L767)
- ML20198L770 + (ML20198L770)
- ML20198L771 + (ML20198L771)
- IR 05000334/1997010 + (ML20198L774)
- IR 05000263/1997012 + (ML20198L776)
- ML20198L778 + (ML20198L778)
- 05000323/LER-1986-015, :on 860502,discovered That 860214 Transition from Mode 5 to Mode 4 Made W/O Current Channel Functional Test on Radiation Monitor.Caused by Personnel Error. Individual Counseled + (ML20198L779)
- ML20198L783 + (ML20198L783)
- IR 05000416/1998016 + (ML20198L788)
- ML20198L789 + (ML20198L789)
- NOC-AE-0054, Forwards Rev 4A of STP Security Personnel Training & Qualification Plan,Per 10CFR50.54(p)(2).Plan Withheld + (ML20198L791)
- IR 05000293/1998010 + (ML20198L796)
- ML20198L798 + (ML20198L798)
- IR 05000335/2020010 + (ML20198L803)
- ML20198L804 + (ML20198L804)
- ML20198L808 + (ML20198L808)
- ML20198L809 + (ML20198L809)
- 3F0198-26, Confirms 980108 Meeting Discussion Between FPC & NRC Re Complex Habitability Envelope Justification for Continued Operation Issues at Crystal River,Unit 3 + (ML20198L810)