Forwards Insp Rept 50-263/97-12 on 970829.No Violations Noted.Decision to Extend Outage to Replace Faulty Strainer Pieces Demonstrated Conservative Decision Making & Focus on as Low as Reasonably Achievable Practices
ML20198L767
Person / Time
Site: Monticello 
Issue date: 09/18/1997
From: Dapas M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20198L772 List:
References
50-263-97-12, NUDOCS 9710270141
Download: ML20198L767 (2)


See also: IR 05000263/1997012

Text

S::pt:mber 18,1997

,

,

i

!

' Mr. M.' Wadley, Vice President

Nuclear Generation

Northern States Power Company

- 414 Nicollet Mall

Minneapolis, MN 55401

' SUBJECT:

MONTICELLO NRC INSPECTION REPORT NO. LO-263/97012(DRP)

Dear Mr. Wadley:

On August 29,1997, the NRC completed an inspection at your Monticello reactor facility.

The enclosed report presents the results of that inspection.

During the 6 week period covered by this inspection period, your conduct of activities at the

Monticello facility was generally characterized by safety conscious operations, sound

engineering and maintenance practices, and careful radicbgical work controls. The

execution of the forced outage was commendable. No significant personnel errors were

identified. Your decision to extend the outage to replace faulty strainer pieces

demonstrated conservative decision making and a focus on as low as reasonably

achievable (ALARA) practices.

In accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original signed by

Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

-i.

Docket No. 50-263

License No. DPR-22

Enclosure: Inspection Report No. 50-263/97012(DRP)

cc w/ encl:

Plant Manager, Monticello

f

State Liaison Officer, State

kf

of Minnecota

.700C1

9710270141 97091g

PDR

ADOCK 05000263

"\\

h

__

-

. _ - _ _ _ _ _ _ _ - _ _

_. .

__

T ,.

,

l

Mr M. W:dley, Vice Presid:nt

Nuclear Generation

'

Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

MONTICELLO NRC INSPECTION REPORT NO. 50-263/97012(DRP)

Dear Mr. Wadley:

On August 29,1997, the NRC completed an inspection at your Monticello reactor facility.

The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Monticello facility was generally characterized by safety conscious operations, sound -

engineering and maintenance practices, and careful radiological work controls. The

execution of the forced outage was commendable. No significant personnel errors were

identified. Your decision to extend the outage to replace faulty strainer pieces

demonstrated conservative decision making and a focus on as low as reasonable

achievable (ALARA) practices,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Is/:farc L. Dapas

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-263

License No. DPR-22

Enclosure: Inspection Report No. 50-263/97012(DRP)

cc w/ encl:

Plant Manager, Monticel'o

State Liaison Officer, State

of Minnesota

Docket File. w/enci

DRP w/ encl

PUBLIC IE-01 w/ encl

Rlli PRR w/enct

OC/LFDCB w/enct

Project Manager, NRR w/enct

SRI Monticello w/enci

Rlli Enf. Coordinator w/enct

A. B. Beach w/ encl

CAA1 w/enci (E-mail)

Deputy RA w/enci

DRS (2) w/enci

TSS w/enci

DOCDESK (E-mail)

Document: R:\\insprpts\\powersVnont\\ mon 97012.drp

To receive a copy of this document,indicato in the box "C" = Copy without attach /enci

"E" o Copy with attach /enci "N" = No copy

.

OFFICE

Rill

Rlli

NAME

JMcB:dp

Grant

DATE

09/ /97

09/ /97

OFFICIAL ITECORD COPY

)

.

-

_ ~ . - _ -

-

- - _ _ _ _ _ - - _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ - _ _ _ - _ . - _ -

-