S::pt:mber 18,1997
,
,
i
!
' Mr. M.' Wadley, Vice President
Nuclear Generation
Northern States Power Company
- 414 Nicollet Mall
Minneapolis, MN 55401
' SUBJECT:
MONTICELLO NRC INSPECTION REPORT NO. LO-263/97012(DRP)
Dear Mr. Wadley:
On August 29,1997, the NRC completed an inspection at your Monticello reactor facility.
The enclosed report presents the results of that inspection.
During the 6 week period covered by this inspection period, your conduct of activities at the
Monticello facility was generally characterized by safety conscious operations, sound
engineering and maintenance practices, and careful radicbgical work controls. The
execution of the forced outage was commendable. No significant personnel errors were
identified. Your decision to extend the outage to replace faulty strainer pieces
demonstrated conservative decision making and a focus on as low as reasonably
achievable (ALARA) practices.
In accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original signed by
Marc L. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
-i.
Docket No. 50-263
License No. DPR-22
Enclosure: Inspection Report No. 50-263/97012(DRP)
cc w/ encl:
Plant Manager, Monticello
f
State Liaison Officer, State
kf
of Minnecota
.700C1
9710270141 97091g
ADOCK 05000263
"\\
h
__
-
. _ - _ _ _ _ _ _ _ - _ _
_. .
__
T ,.
,
l
Mr M. W:dley, Vice Presid:nt
Nuclear Generation
'
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
MONTICELLO NRC INSPECTION REPORT NO. 50-263/97012(DRP)
Dear Mr. Wadley:
On August 29,1997, the NRC completed an inspection at your Monticello reactor facility.
The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Monticello facility was generally characterized by safety conscious operations, sound -
engineering and maintenance practices, and careful radiological work controls. The
execution of the forced outage was commendable. No significant personnel errors were
identified. Your decision to extend the outage to replace faulty strainer pieces
demonstrated conservative decision making and a focus on as low as reasonable
achievable (ALARA) practices,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
Sincerely,
Is/:farc L. Dapas
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No. 50-263
License No. DPR-22
Enclosure: Inspection Report No. 50-263/97012(DRP)
cc w/ encl:
Plant Manager, Monticel'o
State Liaison Officer, State
of Minnesota
Docket File. w/enci
DRP w/ encl
PUBLIC IE-01 w/ encl
Rlli PRR w/enct
OC/LFDCB w/enct
Project Manager, NRR w/enct
SRI Monticello w/enci
Rlli Enf. Coordinator w/enct
A. B. Beach w/ encl
CAA1 w/enci (E-mail)
Deputy RA w/enci
DRS (2) w/enci
TSS w/enci
DOCDESK (E-mail)
Document: R:\\insprpts\\powersVnont\\ mon 97012.drp
To receive a copy of this document,indicato in the box "C" = Copy without attach /enci
"E" o Copy with attach /enci "N" = No copy
.
OFFICE
Rill
Rlli
NAME
JMcB:dp
Grant
DATE
09/ /97
09/ /97
OFFICIAL ITECORD COPY
)
.
-
_ ~ . - _ -
-
- - _ _ _ _ _ - - _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ - _ _ _ - _ . - _ -
-