Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197E462 + (ML20197E462)
- ML20197E464 + (ML20197E464)
- ML20197E465 + (ML20197E465)
- ML20197E466 + (ML20197E466)
- ML20197E469 + (ML20197E469)
- IR 05000261/1997010 + (ML20197E470)
- ML20197E471 + (ML20197E471)
- ML20197E473 + (ML20197E473)
- 05000312/LER-1988-008, :on 880504,reactor Tripped Automatically on High Pressure.Caused by Mismatch of Reactor Power to Feedwater Flow.Process Stds Data Base Updated to Reflect Correct Adjustment Conditions & Setpoint + (ML20197E474)
- ML20197E480 + (ML20197E480)
- ML20197E484 + (ML20197E484)
- IR 05000382/1988005 + (ML20197E485)
- ML20197E486 + (ML20197E486)
- ML20197E490 + (ML20197E490)
- IR 05000346/1986013 + (ML20197E492)
- ML20197E493 + (ML20197E493)
- ML20197E495 + (ML20197E495)
- ML20197E496 + (ML20197E496)
- ML20197E499 + (ML20197E499)
- BVY-97-174, Documents Util Request for 30-day Extension,To 980123,to Respond to NRC Re Review of Responses to GL 95-07.Addl Time Needed to Accommodate Definitive Evaluation of RAI Responses + (ML20197E506)
- ML20197E507 + (ML20197E507)
- ML20197E512 + (ML20197E512)
- ML20197E513 + (ML20197E513)
- ML20197E514 + (ML20197E514)
- ML20197E519 + (ML20197E519)
- ML20197E522 + (ML20197E522)
- ML20197E527 + (ML20197E527)
- IR 05000188/1988001 + (ML20197E533)
- ML20197E536 + (ML20197E536)
- ML20197E539 + (ML20197E539)
- ML20197E541 + (ML20197E541)
- B12089, Requests Temporary Waiver of Compliance from Tech Spec 3.3.D Limiting Condition for Operation for Tube 37-73 in Steam Generator 2.Justification Listed.Tube Will Be Plugged During Next Inservice Insp + (ML20197E546)
- ML20197E547 + (ML20197E547)
- ML20197E550 + (ML20197E550)
- ML20197E551 + (ML20197E551)
- ML20197E555 + (ML20197E555)
- ML20197E556 + (ML20197E556)
- ML20197E557 + (ML20197E557)
- 0CAN129703, Responds to Suppl 1 to GL 96-06, Assurance of Equipment Operability & Containment Integrity DBA Conditions. Util Does Not Plan to Install Mods During Next Refueling Outages + (ML20197E564)
- ML20197E567 + (ML20197E567)
- ML20197E568 + (ML20197E568)
- ML20197E569 + (ML20197E569)
- ML20197E571 + (ML20197E571)
- 05000416/LER-1986-012, :on 860410,while in Cold Shutdown,Containment Isolation Valve El2-F008 Closed.Caused by Failed Coil in Logic Relay.Relay Replaced + (ML20197E572)
- ML20197E573 + (ML20197E573)
- ML20197E578 + (ML20197E578)
- IR 07100008/2012004 + (ML20197E579)
- RBG-26-863, Notifies That Annual Emergency Preparedness Exercise Scheduled for 880224.Date Discussed & Concurred Upon by Involved Parties,Including FEMA Region VI & NRC Region Iv. Proposed Schedule of Submittals Listed + (ML20197E582)
- ML20197E585 + (ML20197E585)
- ML20197E589 + (ML20197E589)
- ML20197E590 + (ML20197E590)