ML20197E539
| ML20197E539 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/07/1986 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20197E544 | List: |
| References | |
| NUDOCS 8605150277 | |
| Download: ML20197E539 (3) | |
See also: IR 05000445/1986005
Text
-
,
.-.
.
W 07 W
In Reply Refer To:
Docket:
50-445/86-05
Texas Utilities Generating Company
ATTN:
Mr. W. G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the operations inspection conducted by Messrs. D. L. Kelley and
W. F. Smith of the Region IV Comanche Peak Group during the period February 1
through March 31, 1986, of activities covered by NRC Construction Permit CPPR-126
for the Comanche Peak Steam Electric Station (CPSES), Unit 1, and to the
discussion of our findings with Mr. A. B. Scott and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection included: (1) applicant actions on
previous inspection findings, (2) miscellaneous independent inspection issues,
(3) preventive maintenance programs, (4) plant tours, and (5) plant status.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
These findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities appeared
to deviate from commitments made to the NRC.
These items and references to the
commitments are identified in the enclosed Notice of Deviation.
You are
requested to respond to these deviations in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter. It is requested that your response to Item A of the Notice of Deviation
regarding preventive maintenance inadequacies ~ address actio'ns that will be
taken to assure that all safety related structures, systems, and components
have been and will continue to be maintained at the quality required for them
to perform their intended functions.
.
The responses directed by this letter and the accompanying Notice of Deviation
-
are not subject to the clearance procedures of the Office of Management and
Budget as requi' red by the Paperwork Reduction Act of 1980, PL 96-511.
DRSP k NRR
f
RIV:RI/0P
i RI f//
CPG
CPG
esterman
EHJohnson VNoonan
AA' gf tG
DLKelley:
WFSmith
IBarnes
Ty/4/86
$/*1/86
[/4/86
r 4 YI '
g/L/86
S"/1 /86 r/f/86
$
B605150277 860507
]+r9p
ADOCK 05000445-
G
.
.
l(l
..
.
-
. - -
- -
.
- -
- - - . - -
.-. . .--. Y.
-
. - - -
.
.
- -
---.- - - .-
. --
a
-
- - . . . - - - -
.
-
.
Texas Utilities Generating Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Och*n J s'cr.cd Gf '
E. H. Johnson'
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosures:
1. Appendix A - Notice of Deviation
2. Appendix B - NRC Inspection Report
50-445/86-05
cc w/ enclosures:
Texas Utilities Electric Company
ATTN:
J. W. Beck, Vice President, Licensing,
Quality Assurance, and Nuclear Fuels
Skyway Tower
400 North Olive Street
Lock B'x 81
o
Dallas, Texas
75201
Juanita Ellis
President, CASE
1426 South Polk Street
Dallas, Texas
75224
Renea Hicks
Assistant Attorney General
Environmental Protection
Division
^
P. O. Box 12548
76'11
7
Texas Radiation Control Program Director
-
.
.
.
e
.
.
_
. _ -. .
.
.
Texas Utilities Generating Company
-3-
bcc: to DMB (IE01)
bcc distrib by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONS
- R&SPB
DRSP
R. Martin, RA
- T. Westerman, CPTG
- V.
Noonan, NRR
- RIV File
J. Taylor, IE
R. Heishman, IE
S. Treby, ELD
- D. Weiss, LFMB
- RSB
I. Barnes
- w/766
.
O
'v
s
f
e
54
'-
r