Ack Receipt of Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Rept 50-188/88-01.Addl Clarification Warranted as Discussed During 880526 Telcon Re Listed Deviation
ML20197E533
Person / Time
Site: Kansas State University
Issue date: 06/03/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Faw R
KANSAS STATE UNIV., MANHATTAN, KS
References
NUDOCS 8806090127
Download: ML20197E533 (1)


Text

- _______

In Reply Refer To:

JN-3m Docket: 50-188/88-01 Kansas State University Department of Nuclear Engineering ATTN: Dr. R. E. Faw, Director

.

Nuclear Reactor Facility Manhattan, Kansas 66505 Gentlemen:

i Thank you for your letter of May 11, 1988, in response to our letter and Notice of Violation dated April 19, 1988. We have reviewed your reply and i

find it responsive to the concerns raised in our. Notice of Violation. As a result of your response to the Notice of Deviation, we find thai; additional clarification was warranted as discus::ed with you during a telephone cell on May 26, 1988. Specifically, the way that activities had been conducted up to the date of the inspection was in deviation from your written comitments.

V_

understand your concern that public safety will be served best if, in Section I../.0, Step 2, the term "scrams" be redefined as "unintentional scrams" and the ohrase

"malfunctions of equipment" be redefined as "operational malfunctions of essential equipment." We also understand that you plan to change your Hazard

'

Sumary Report pursuant to 10 CFR Part 50.59.

We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, j

Original SJgned 11y

8806090127 880603 PDR ADOCK 05000188 G

PDR L. J. Callan, Director Division of Reactor Projects j

cc:

Kansas Radiation Control Program Director bec w/ enclosure:

DMB - IE01 R. Martin J. Gagliardo C:RPSB-DRSS A. Adams, NRR Project Manager DRP Lisa Shea, RM/ALF RIV File MIS Coordinator RSTS Operator DRS R. L. Bangart DRSS C:FRPS G. F. Sanborn, E0 RPSB-DRSS i

G. Pick

-

B. Evans

'

C:PSBh D:D C:0P N

' D, JEGag rdo:cs I

h an LJp llan TWestennan LJCallan 5/sV8

-

5/4 /88 F/

6/ M 88 6/ 3 /88

/

,