Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196G433 + (ML20196G433)
- 05000456/LER-1988-005-01, :on 880204,diesel Generator 1A Start on Safety Injection Signal Instead of Undervoltage Signal.Caused by Miscommunication Between Operators.Generator Secured & Operators Counseled + (ML20196G434)
- 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits + (ML20196G435)
- ML20196G436 + (ML20196G436)
- ML20196G439 + (ML20196G439)
- ML20196G440 + (ML20196G440)
- ML20196G444 + (ML20196G444)
- ML20196G447 + (ML20196G447)
- ML20196G452 + (ML20196G452)
- ML20196G453 + (ML20196G453)
- NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests + (ML20196G459)
- ML20196G460 + (ML20196G460)
- ML20196G461 + (ML20196G461)
- ML20196G462 + (ML20196G462)
- ML20196G463 + (ML20196G463)
- ML20196G466 + (ML20196G466)
- 05000293/LER-1988-005, :on 880202,automatic Actuation of Portions of Primary Containment & Reactor Bldg Isolation Control Sys (Pcis/Rbis) Occurred.Caused by Pcis/Rbis Logic Relay Coil Failure.Logic Relay Coil Replaced + (ML20196G467)
- 05000336/LER-1988-005-01, :on 880204,loss of Normal Power Occurred on Facility 1 Vital 4160 Volt Electrical Bus.Caused by Operator Error.Facility 1 Reactor Bldg Closed Cooling Water,Svc Water & Low Pressure Safety Injection Pumps Started + (ML20196G469)
- ML20196G470 + (ML20196G470)
- ML20196G473 + (ML20196G473)
- ML20196G475 + (ML20196G475)
- 05000382/LER-1999-005-01, :on 980702,determined That Four Contacts in Control Circuits of EFW Control Valves Were Untested.Caused by Personnel Error.Untested Contacts Have Been Tested + (ML20196G477)
- BECO-88-029, Confirms That Util Preliminary Enjoined by Us District Court for District of Ma from Performing Annual Drug Tests Upon Clerical Employees.Preliminary Injunction Issued on 870324 by Judge D Nelson.Court Papers Encl + (ML20196G478)
- ML20196G479 + (ML20196G479)
- ML20196G481 + (ML20196G481)
- ML20196G483 + (ML20196G483)
- ML20196G484 + (ML20196G484)
- 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action + (ML20196G485)
- ML20196G486 + (ML20196G486)
- B12810, Forwards Request for Exemption from 10CFR50,App R,Section III.G(1)(a),requiring 20-ft Separation Zone Free of Intervening Combustibles W/Suppression,Per Insp Rept 50-336/87-16.Fee Paid + (ML20196G491)
- ML20196G491 + (ML20196G491)
- ML20196G492 + (ML20196G492)
- ML20196G495 + (ML20196G495)
- 05000265/LER-1999-002-04, :on 990527,station Personnel Discovered Unsealed One Inch Diameter Pipe Penetrating Secondary Containment.Caused by Lack of Proper Work Control.Util Will Permanently Cap Spare Subject Pipe by 990715 + (ML20196G496)
- ML20196G498 + (ML20196G498)
- ML20196G500 + (ML20196G500)
- ML20196G502 + (ML20196G502)
- ML20196G506 + (ML20196G506)
- ML20196G507 + (ML20196G507)
- IR 05000333/1997002 + (ML20196G508)
- ML20196G511 + (ML20196G511)
- ML20196G512 + (ML20196G512)
- ML20196G513 + (ML20196G513)
- ML20196G514 + (ML20196G514)
- ML20196G515 + (ML20196G515)
- ML20196G516 + (ML20196G516)
- ML20196G517 + (ML20196G517)
- ML20196G520 + (ML20196G520)
- ML20196G522 + (ML20196G522)
- IR 05000271/1997003 + (ML20196G523)
- ML20196G524 + (ML20196G524)