Forwards Insp Rept 50-333/97-02 on 970223-0412 & Notice of Violation.Longstanding Problem Associated W/Shutdown Cooling Initiation Not Resolved.Security Program Was Inspected & Found to Be Effective
ML20196G484
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/08/1997
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20196G487 List:
References
50-333-97-02, 50-333-97-2, NUDOCS 9705200300
Download: ML20196G484 (3)


See also: IR 05000333/1997002

Text

__

- _ .

_

_

..

. _ . _ _ _ _ _ _

_

..

,_-_ . _

. _ - - _ _

.

o

l*

!

I

May 8, 1997

Mr. Michael J. Colomb

Site Executive Officer

New York Power Authority

James A. FitzPatrick Nuclear Power Plant

Post Office Box 41

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION 50-333/97-02 AND NOTICE OF VIOLATION

l

Dear Mr. Colomb:

On April 12,1997 the NRC completed an inspection a; your FitzPatrick Power Plant. The

enclosed report presents the results of that inspection.

i

Overall, plant operation activities were conducted well. However, on March 3, a licensed

reactor operator mistakenly withdrew one control rod. The results of the review of that

event are documented in a specialinspection repon iio. 50-333/97003. Additionally, a

'

longstanding problem associated with shutdown cooling initiation was not resolved in an

!

effective manner which led to additional challenges to safe plant operation. The security

,

program was in:pected during this period and was determined to be effective.

l

Based on the results of this inspection, the NRC concluded that the failure to implement

corrective actions by installing a modification for a high point vent to prevent spurious

shutdown cooling isolations was a violation of 10 CFR 50 Appendix B. This violation is

cited in the enclosed Notice of Violation and the circumstances surrounding the violation

4

are described in detail in the enclosed report. Please note that you are required to respond

,

to this letter and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether

further enforcement actions is necessary to ensure compliance with regulatory

'

requirements.

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed by:

200033

l

Curtis J. Cowgill, Chief

l

l

Projects Branch 2

/

l

Division of Reactor Projects

l

Docket No.: 50-333

I. H. H. U. l.i l.l X.

License No.: DPR-59

9705200300 970508

PDR

ADOCK 05000333

!

G

PM

-

l

OFFICIAL RECORD COPY

IE:01

.

.

. - . . - -

. . - _ - . . - - - .-

. - .

.-

.

. . - - . - . .

.. . - = -

-

.

.

.

.

Michael J. Colomb

2

Enclosures:

1.

Notice of Violation

2.

Inspection Report 50-333/97-02

,

- cc w/encis:

C. D. Rappleyea, Chairman and Chief Executive Officer

R. Schoenberger, President and Chief Operating Officer

J. Knubel, Chief Nuclear Officer and Senior Vice President

H. P. Salmon, Jr., Vice President of Nuclear Operations

W. Josiger, Vice President - Engineering and Project Management

J. Kelly, Director - Regulatory Affairs and Special Projects

T. Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Director - Quality Assurance

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

K. Peters, Licensing Manager

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

l

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

l

P. Eddy, Director, Electric Division, Department of Public Service, State

of New York

'

l

G. T. Goering, Consultant, New York Power Authority

i

l

J. E. Gagliardo, Consultant, New York Power Authority

E. S. Beckjord, Consultant, New York Power Authority

F. William Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

j

and Development Authority

l

,

i

i

1

.

. .

.

- . - - . - . - _.

.

--

. - - - - - . .

. . . _ - . - . -

--

3'g

. .

J

.

Michael J. Colomb

3

Distribution w/encts:

'

.

W. Axelson, DRA

j

D. Screnci, PAO

Nuclear Safety Information Center (NSIC)

PUBLIC

I

NRC Resident inspector

'

Region i Docket Room (with concurrences)

R. Correia, NRR

D. R. Taylor, NRR

L. Cunningham, NRR

D. Barss, NRR

C. Cowgill, DRP

J. Rogge, DRP

R. Barkley, DRP

R. Junod, DRP

Distribution w/encis: (VIA E-MAIL)

W. Dean, OEDO (WMD)

S. Bajwa, NRR

K. Cotton, NRR

D. Hood, NRR

M. Campion, RI

'

Inspection Program Branch, NRR (IPAS)

DOCDESK

DOCUMENT NAME: A:\\lR9702.FTZ

Ta receive a copy of this document, indicate in the box: "C" = Cop @itput attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

[ l[]

Rl/DRP

f/J

Rl/DRP [jfL/

fff

RBarloeyf/fr

CCowg#1'

NAME

GHunegs f

DATE,.

05/ h/97 i'

05/K/97'

05/q /97

@

OFFICIAL RECORD COPY

l