ML20196G481

From kanterella
Jump to navigation Jump to search
Discusses 981112 Public Meeting in Region IV Ofc to Discuss Changes Being Made to Radiation Protection Program.Handouts from Meeting Encl
ML20196G481
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/25/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9812080018
Download: ML20196G481 (15)


Text

l l

,@ c nuq'9 y

g UNITED STATE 2 h

NUCLEAR REGULATORY COMMISSION n

U E

REGION IV

%,*****,e[

611 RYAN PLAZA DRIVE. sulTE 400 j

ARLINGTON, TEXAS 76011-8064 November 25, 1998 C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967

SUBJECT:

DISCUSSION OF RADIATION PROTECTION PROGRAM CHANGES

Dear Mr. Hutchinson:

This refers ' 3 the public meeting conducted in the Region IV office on November 12,1998.

This meeting was held at the licensee's request to discuss the changes being made to the radiation protection program.

This meeting was very useful because of the interactive discussions between your radiation protection management staff and the regional based program inspectors.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely, AL

\\

~

Blaine Murray, Chief Plant Support Branch

\\

Division of Reactor Safety

Enclosure:

Handouts Docket Nos.: 50-313 50-368 License Nos.: DPR-51 NPF-6 9812080018 981125 l

PDR ADOCK 05000313 P

PDR i

i L

I.

l Entergy Operations, Inc.~,

cc:

Executive Vice President i

& Chief Operating Officer -

Entergy Operations, Inc.'

P.O. Box 31995 f

' Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

l P.O. Box 31995 Jackson, Mississippi 39286 I

. Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse

-Russellville, Arkansas 72801 I

Winston & Strawn

'I 1400 L Street, N.W.

Washington, D.C. 20005-3502 David D. Snellings, Jr., Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30

' Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies

'1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 1

i l

l 1

- _. ~. -. =..... - - -. - -

i 1

i l

Entergy Operations, Inc. :

DISTRIBUTION-bec to DCD (IE06)

Regional Administrator ANO Resident inspector DRS Director.

DRS Deputy Director i

DRP Director Branch Chief (DRP/C) 1 Project Engineer (DRP/C)

DRS-PSB Branch Chief (DRP/TSS)

MIS System RIV File i

DOCUMENT NAME: R:\\_ANO\\ANS1112.MPS To receive copy of document, indicate in bar: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:SRS\\PSB E

C:DRS\\PSE A

MShannon:ntyL.cC BMurray% i 111$98

  • /"

11tS98' OFFICIAL RECORD COPY l

k

J I

Entergy Operations, Inc.

3-nicTsint Tin 14.,m.

boe to 00)(tE06)i ~#.

Regional Administrator ANO Resident inspector 1

DRS Director DRS Deputy Director j

DRP Director l

Branch Chief (DRP/C) l Project Engineer (DRP/C)

DRS-PSB Branch Chief (DRP/TSS)

I MIS System RIV File 070025 DOCUMENT NAME: R:\\__ANO\\ANS1112.MPS To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy RIV:SRS\\PSB lE C:DRS\\PS&lA l

}

MShannon:nly1..cC BMurray% &

11ff98

  • f*"

11L798' OFFICIAL RECORD COPY i

i

1 l

l l

i i

WE'RE MAKING SOME CHANGES i

1 l

IN

~

t i

RADIATION PROTECTION f

?

l f

l AT I

ARKANSAS NUCLEAR ONE i

l t

4 a.,w4 i

l l

4 i

i I

i o.

e 1

P 9 l

L t

i

.M i*

(,)

P D i

9

)

1 1

f I

W I

P.

j N

WW

~

i k

i WE'RE MAKING SOME CHANGES IN:

I OLR ORGANIZATION i

OUR FUNCTIONS i

I OUR CULTURE i

i t

I i

WE'VE CHANGED OUR ORGANIZATION ORGANIZATIONAL CHANGE GOALS

1. Center all RP functions under qualified RPM i
2. Focus resources required for improvement.

i

3. " Grow" ANO RPM's t

l l

f

~

PREVIOUS ORGANIZATION Manager, Radiation Protection / Chemistry Superintendent, Chemistry I

I Supervisor, ALARA/

St:perintendent, HP Ops Supervisor, Techn.ical Outage Support Support I

I I

I Supervisor.

Supervisor, Unit 2 Supervisor, Supervisor, Shift Supervisor, Unit 1 Dosimetry Rad Waste

Y) p,'$

t PRESENT ORGANIZATION 3

g ll$f/. ?

A,p'9 '

/

Manager, Radiation Protection / Chemistry M@of

-[l

/

(

Manager, Radiation Protection Technical Assistant Superintendent, Chemistry Ji 51 QMM*//

0' b b N t YSil/5/-

x j

o

(~

l I

/

Supervisor, ALARA/

Superintendent, HP Ops i

Supervisor, Techn.ical Outage Support Support gg, i

I I

I I

Supervisor, Supervisor, Unit 2 Supervisor, Supervisor, Shift Superv.isor, Unit 1 Dosimetry Rad Waste

j WE'RE CHANGB'G SOME OF OUR FUNCTIONS FUNCTIONAL CHANGE GOALS:

1. Determine FUNCTIONAL AREAS where improvements are needed i
2. Develop action plan for improvement i
3. Implement improvements as appropriate
4. Determine follow-up functional areas and develop action plan l

as necessary i

I i

l I

WHERE IS OUR INITIAL FOCUS?

l l

l RADWORKER PRACTICES 1

CONTA WINATION CONTROL CONTROL OF HRA AND LHRA CONTROL OF RADIOACTIVE MATERIAL

5 t

WE'RE CHANGING OUR CULTURE i

CULTURAL CHANGE GOALS:

l l

1. Turn RP improvement into a site issue Vs a department issue and increase station awareness t
2. Increase department self critical nature i
3. Continue to implement human performance improvements
4. Increase interaction between RP and plant staff I

8 t

(

WHAT IS OUR INITIAL FOCUS?

  1. ,strof4 i

POD PRESENTATIONS #g#o#l

~

4hy

~

HUMAN PERFORMANCE INITIATIVES PERFORMANCE INDICATORS j

RADWORKER TRAINING l

6Eha 5

~

O

$4 O

O 94 N

O

@sk ps Nk