|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211G9701999-08-30030 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209H6241999-07-16016 July 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered Wk of 990517 ML20209H7951999-07-16016 July 1999 Forwards NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including as-given Written Exam) for Tests Administered During Week of 990517 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20212H7701999-06-18018 June 1999 Notification of 990715 Meeting with ABB-CE to Discuss Issues Re Steam Generator Welded Sleeve Problem Identified at Unit 1 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20137H5041999-04-0808 April 1999 Informs That Licensee Requesting Listed Changes to Boilerplate Distribution Lists Used by NRR for Docketed Info.Add Site General Manager to Both Prairie Island & Monticello Lists ML20204J3521999-03-26026 March 1999 Requests That Encl Document Be Entered in NRC Pdr.Documents Consists of Composite of Attachments to NSP Ltrs, & 990308 & Should Be Linked to Both Ltr ML20198J4801998-12-21021 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss License Amend Request to Allow Limited Inoperability of Boric Acid Storage Tank Level Channels & Transfer Logic Channels for Required Testing & Maint ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20236U2071998-07-22022 July 1998 Forwards Corrected Copy of Ltr Transmitting Licensee Insp Repts 50-282/98-08 & 50-306/98-08.Date Has Been Corrected to Show Issuance on 980702 ML20217E9701998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Mod to Plant Units 1 & 2,which Will Add Diverse RTS to Shut Down Reactor in Event of ATWS Event ML20198G1911997-12-23023 December 1997 Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants ML20202F6011997-12-0101 December 1997 Notification of 971211 Meeting W/Util in Rockville,Md to Discuss Intake Canal Seismic Issue at Plant ML20198R4951997-10-27027 October 1997 Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv) ML20236N5001997-10-18018 October 1997 Forwards Technical Specification Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests ML20236N4671997-10-14014 October 1997 Forwards TS Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests ML20211A4651997-09-16016 September 1997 Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee Sites ML20217K8081997-08-14014 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Revised Methodology Used to Calculate MSLB Containment Pressure Response in Anticipation for License Amend Request to Reduce Boron Concentration ML20210K6081997-08-13013 August 1997 Informs That Operator Licensing Exams Administered Wk of 970616 at Prairie Island,Units 1 & 2.Listed Info for Processing Through Nudocs & Distribution to NRC Staff, Including NRC PDR Also Encl ML20217M0321997-08-13013 August 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on Wk of 970616.Info Submitted for Processing Through Nudocs & Distribution to NRC Staff ML20141F0451997-06-26026 June 1997 Notification of 970709 Meeting W/Nsp in Rockville,Maryland to Discuss ATWS Protection at PINGP & Possible Installation of Diverse Scram Sys ML20147J2641997-04-16016 April 1997 Responds to 961126 Request Re Task Interface Agreement 96-0440, Defining Dry Cask Storage Terms. Basic Reasons to Return Cask to SFP & Unload Sf Assemblies Are Either to Retrive or Dispose or Respond to Event or Condition ML20136D5311997-03-0707 March 1997 Notification of 970312 Meeting W/Util in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases ML20134N5851997-02-19019 February 1997 Notification of 970224 Meeting W/Northern States Power in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases ML20134J9331997-02-10010 February 1997 Notification of 970213 Meeting W/Util in Rockville,Md to Discuss Results from Recent SG Insps Performed on Facility ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134C2821997-01-29029 January 1997 Notification of 970206 Meeting W/Nsp in Rockville,Md to Discuss ISI at Prairie Island & Adoption of ASME Code Case N-521 ML20135C3791996-11-25025 November 1996 Informs That Commission Provided Guidance to Staff to Ensure That Rights of Sovereign Tribal Govts Fully Respected & to Operate within govt-to-govt Relationship w/federally- Recognized Native American Tribal Govts ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20128E6401993-01-29029 January 1993 Notification of 930209 Meeting W/Util in Rockville,Md to Discuss V(Z) Analysis Issues at Plant ML20128E7811993-01-26026 January 1993 Notification of 930202 Meeting W/Util in Rockville,Md to Discuss Instrumentation TS Issues at Plant ML20058H8631990-11-16016 November 1990 Notification of 901219 Meeting W/Util in Rockville,Md,To Discuss NRC Bulletin 88-008 Concerns ML20055D5791990-06-27027 June 1990 Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors ML20246E6201989-08-23023 August 1989 Discusses Certification of Pnl Contractor Personnel as PWR Examiners.S Carrick Completed Required Written & Operating Exam Activities at Facilities During Wk of 890612.Oral Exam Audit Encl.W/O Encl ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20247M1331989-05-24024 May 1989 Forwards Input to SALP 8 Rept for Units 1 & 2.Evaluation Conducted Per 880606 Rev to NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance & Provides Input Per Guidelines in Rl Hague 890412 Memo ML20207K8911988-10-13013 October 1988 Advises That Encl Revised Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping Acceptable from Anomaly Discovered to Next Refueling Outage ML20196G5121988-06-28028 June 1988 Notification of 880719 Meeting W/Util in Rockville,Md to Discuss Plans for Installation of Two Addl Diesel Generators That Would Provide Alternate Power Capability to Meet NRC Station Blackout Requirements.Meeting Agenda Encl ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20151X9101988-04-28028 April 1988 Notification of 880512 Meeting W/Puc of Mn to Discuss & Review Status of Spent Fuel Consolidation Project at Plant. Meeting Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref 1999-09-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211G9701999-08-30030 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209H6241999-07-16016 July 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered Wk of 990517 ML20209H7951999-07-16016 July 1999 Forwards NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including as-given Written Exam) for Tests Administered During Week of 990517 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20212H7701999-06-18018 June 1999 Notification of 990715 Meeting with ABB-CE to Discuss Issues Re Steam Generator Welded Sleeve Problem Identified at Unit 1 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20137H5041999-04-0808 April 1999 Informs That Licensee Requesting Listed Changes to Boilerplate Distribution Lists Used by NRR for Docketed Info.Add Site General Manager to Both Prairie Island & Monticello Lists ML20204J3521999-03-26026 March 1999 Requests That Encl Document Be Entered in NRC Pdr.Documents Consists of Composite of Attachments to NSP Ltrs, & 990308 & Should Be Linked to Both Ltr ML20198J4801998-12-21021 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss License Amend Request to Allow Limited Inoperability of Boric Acid Storage Tank Level Channels & Transfer Logic Channels for Required Testing & Maint ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20236U2071998-07-22022 July 1998 Forwards Corrected Copy of Ltr Transmitting Licensee Insp Repts 50-282/98-08 & 50-306/98-08.Date Has Been Corrected to Show Issuance on 980702 ML20217E9701998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Mod to Plant Units 1 & 2,which Will Add Diverse RTS to Shut Down Reactor in Event of ATWS Event ML20198G1911997-12-23023 December 1997 Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants ML20202F6011997-12-0101 December 1997 Notification of 971211 Meeting W/Util in Rockville,Md to Discuss Intake Canal Seismic Issue at Plant ML20198R4951997-10-27027 October 1997 Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv) ML20236N5001997-10-18018 October 1997 Forwards Technical Specification Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests ML20236N4671997-10-14014 October 1997 Forwards TS Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests ML20211A4651997-09-16016 September 1997 Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee Sites ML20217K8081997-08-14014 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Revised Methodology Used to Calculate MSLB Containment Pressure Response in Anticipation for License Amend Request to Reduce Boron Concentration ML20217M0321997-08-13013 August 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on Wk of 970616.Info Submitted for Processing Through Nudocs & Distribution to NRC Staff ML20210K6081997-08-13013 August 1997 Informs That Operator Licensing Exams Administered Wk of 970616 at Prairie Island,Units 1 & 2.Listed Info for Processing Through Nudocs & Distribution to NRC Staff, Including NRC PDR Also Encl ML20141F0451997-06-26026 June 1997 Notification of 970709 Meeting W/Nsp in Rockville,Maryland to Discuss ATWS Protection at PINGP & Possible Installation of Diverse Scram Sys ML20147J2641997-04-16016 April 1997 Responds to 961126 Request Re Task Interface Agreement 96-0440, Defining Dry Cask Storage Terms. Basic Reasons to Return Cask to SFP & Unload Sf Assemblies Are Either to Retrive or Dispose or Respond to Event or Condition ML20136D5311997-03-0707 March 1997 Notification of 970312 Meeting W/Util in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases ML20134N5851997-02-19019 February 1997 Notification of 970224 Meeting W/Northern States Power in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases ML20134J9331997-02-10010 February 1997 Notification of 970213 Meeting W/Util in Rockville,Md to Discuss Results from Recent SG Insps Performed on Facility ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134C2821997-01-29029 January 1997 Notification of 970206 Meeting W/Nsp in Rockville,Md to Discuss ISI at Prairie Island & Adoption of ASME Code Case N-521 ML20135C3791996-11-25025 November 1996 Informs That Commission Provided Guidance to Staff to Ensure That Rights of Sovereign Tribal Govts Fully Respected & to Operate within govt-to-govt Relationship w/federally- Recognized Native American Tribal Govts ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20128E6401993-01-29029 January 1993 Notification of 930209 Meeting W/Util in Rockville,Md to Discuss V(Z) Analysis Issues at Plant ML20128E7811993-01-26026 January 1993 Notification of 930202 Meeting W/Util in Rockville,Md to Discuss Instrumentation TS Issues at Plant ML20058H8631990-11-16016 November 1990 Notification of 901219 Meeting W/Util in Rockville,Md,To Discuss NRC Bulletin 88-008 Concerns ML20055D5791990-06-27027 June 1990 Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors ML20246E6201989-08-23023 August 1989 Discusses Certification of Pnl Contractor Personnel as PWR Examiners.S Carrick Completed Required Written & Operating Exam Activities at Facilities During Wk of 890612.Oral Exam Audit Encl.W/O Encl ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20247M1331989-05-24024 May 1989 Forwards Input to SALP 8 Rept for Units 1 & 2.Evaluation Conducted Per 880606 Rev to NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance & Provides Input Per Guidelines in Rl Hague 890412 Memo ML20207K8911988-10-13013 October 1988 Advises That Encl Revised Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping Acceptable from Anomaly Discovered to Next Refueling Outage ML20196G5121988-06-28028 June 1988 Notification of 880719 Meeting W/Util in Rockville,Md to Discuss Plans for Installation of Two Addl Diesel Generators That Would Provide Alternate Power Capability to Meet NRC Station Blackout Requirements.Meeting Agenda Encl ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20151X9101988-04-28028 April 1988 Notification of 880512 Meeting W/Puc of Mn to Discuss & Review Status of Spent Fuel Consolidation Project at Plant. Meeting Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref 1999-09-23
[Table view] |
Text
e ,
~
June 28, 1988-Dockets Nos. 50-282 and 50-306 MEMORANDUM FOR: Martin J. Virgilio, Director Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects FROM: Dominic C. Dilanni, Project Manager Project Directorate III-1
. Division of Reactor Projects - III, IV, V & Special Projects
SUBJECT:
FORTHCOMING MEETING WITH NORTHERN STATES POWER CORPORATION (NSP) REGARDING THE ADDITION OF TWO EMERGENCY DIESEL GENERATORS; PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS NOS. 1 AND 2 DATE & TIME: Tuesday, July 19, 1988, 9:00 a.m. - 5:00 p.m.
LOCATION: One White Flint North, Room 14-B-11 Rockville, Maryland PURPOSE: To discuss NSP's (licensee's) plans for the installation of two additional diesel generators that would provide an alternate AC power capability to meet NRC's station blackout requirements. The meeting agenda is attached.
Utility Doiiiinic Dilanni Jim Knight Jim Hoffman Saba Saba Paul Gill Dale Vincent Faust Rnsa Russ Fund Dominic iondi Gene Eckholt Bruce Burgess, Region Ill Morris Moser, Resident Inspector l original signed by Dominic C. Dilanni, Project Manager .
Project Directorate III-1 '
Division of Reactor Projects - III, IV, V & Special Projects
Enclosures:
Agenda cc: See next page
- Meetings between NRC technical staff and applicants or licensees are open for !
interested members of the public, petitioners, intervenors, or other parties !
to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," j 43 Federal Register 28058, 6/28/78.
OFFICE:- LA:PDIII-1 PM:PDIII-1 W ,
SURNAME: RIngraN DDilanni/rl DATE: 06/pl/88 06/Q/88 8807050546 880628 !
PDR ADOCK 05000282 P PDR j
-
[ o UNITED STATES I k NUCLEAR REGULATORY COMMISSION )
WASHINGTON, D. C. 20555 5 :
j June 28, 1988
%,.....,/ ,
Dockets Nos. 50-282 and 50-306 MEMORANDUM FOR: Martin J. Virgilio, Director l Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects FROM: Dominic C. Dilanni, Project Manager -
Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects
SUBJECT:
FORTHCOMING MEETING WITH NORTHERN STATES POWER CORPORATION (HSP) REGARDING THE ADDITION OF TWO EMERGENCY DIESEL GENERATORS; PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS NOS. 1 AND 2 DATE & TIME: Tuesday, July 19, 1988, 9:00 a.m. - 5:00 p.m.
LOCATION: One White Flint North, Room 14-8-11 Rockville, Maryland PURPOSE: To discuss NSP's (licensee's) plans for the installation of two additional diesel generators that would provide an alternate AC power capability to meet NRC's station blackout requirements. The meeting agenda is attached.
- PARTICIPANTS: NRC Utility Uoiiiinic Dilanni Jim Knight Jim Hoffman Saba Saba Paul Gill Dale Vincent Faust Rosa Russ Pond Dominic Tondi Gene Eckholt i
Bruce Burgess, Region III Morris Moser, Resident Inspector s . , ,
i j . - J.
Dominic C. Dilanni, Project Manager i Project Directorate III-1 i Division of Reactor Projects - III, i IV, V & Special Projects )
Enclosures:
Agenda ec: See next page "Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
43 Federal Register 28058, 6/28/78.
Prairie Island Nuclear Generating 4 Plant Mr. D. M. Musolf, Manager Nuclear Support Services Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 Cerald Charnoff, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Dr. J. W. Ferman Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155 Mr. E. L. Watzl, Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Jocelyn F. Olson, Esq.
Assistant Attorney General Environmental Protection Division Suite 200 520 Lafayette Road St. Paul, Minnesota 55155 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations '
799 Roosevelt Road Glen Ellyn, Illinois 60137 l Mr. William Miller, Auditor Goodhue County Courthouse Red Wing, Minnesota 55066
a MEETING NOTICE DISTRIBUTION t .,,, ,r,n ,,,.
,* Docket! File x:a,
~NRC & Local PDRs
- i. PD31 Meeting Notice File T. Murley/J. Sniezek F. Miraglia S. Varga G. Lainas M. Virgilio D. Dilanni W. Lanning OGC E. Jordan .
B. Grimes ,
Receptionist (building where meeting is to be held)
NRC Participants ACRS (10)
GPA/PA V. Wilson D. Morley S. Black R. Greenman, RIII I
I l
\
\
l l
. I i
( l
Enclosure r
g AGENDA FOR MEETING..BE.TWEE.N_NRC STAFF AND NORTHERN STATES POWER COMPANY INSTALIATION OF TVO NEW SAFETY GRADE DIESEL CENERATORS AND ENHANCEMENTS TO PIANT COOLING WATER SYSTEM OMECTIVE: To present preliminary plans to NRC Staff related to planned installation of two new safety grade diesel generators at the Prairie Island plant. NRC Staff views on several important licensing issues will be solicited.
Topic ,
- 1. Introduction and Brief Explanation of the Reason for the Project
- 2. Description of current Prairie Island Emergency AC System
- 3. Description of Current Prairie Island Cooling Water System
- 4. Description of Proposed Emergency AC System With Addition of D5 and D6 Preliminary One Line Diagram
- Preliminary Switchgear and Logic Changes
- Supply to 121 Cooling Vater Pump
- Sizing of D5 and D6
- Cooling System for D5 and D6
- Use of Safeguards Bus Tie Breakers '
for Meeting Station Blackout Rule .
j l Alternate AC Requirements l
- New Building Alternatives l l
- Preliminary Schedule
- 5. Diesel Vendor Selection Process (including potential foreign vendor and unique NRC requirements which may be I imposed)
I 1 l l
1 1
AGENDA FOR MEETING BETWEEN NRC STAFF AND NORTHERN STATES POWER COKPANY
\
INSTALIATION OF TWO NEW SAFETY CRADE DIESEL GENERATORS AND ENHANCEMENTS TO PIANT COOLING VATER SYSTEM l
Topic
- 6. Licensing Issues
- Technical Specification Changes to Reflect Two Diesel Generators per Unit vs. Shared Diesel Generators .
- Technical Specification Changes to Reflect "swing" Safety-Related Cooling Water Pump
- Plans and Schedule for Submitting License Amendment Request for NRC Revied and Approval .
- 7. NRC Preliminary Comments, Questions and Concerns I
1 I
I l
l 1
2
. . . . . . . . . . . . .. . - ... . - . . . . . . . . . . . . . . . . . . . . . . . . . m- )