Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B843 + (ML20196B843)
- ML20196B844 + (ML20196B844)
- LIC-98-0157, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-08 on 980608-12.Corrective Actions:Mrsids Were Reviewed & Revised for Reactor Protection & Esfs on 981120 + (ML20196B845)
- B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With + (ML20196B846)
- ML20196B848 + (ML20196B848)
- ML20196B850 + (ML20196B850)
- ML20196B851 + (ML20196B851)
- IR 05000456/1987041 + (ML20196B852)
- ML20196B853 + (ML20196B853)
- ML20196B854 + (ML20196B854)
- ML20196B855 + (ML20196B855)
- ML20196B856 + (ML20196B856)
- ML20196B857 + (ML20196B857)
- ML20196B858 + (ML20196B858)
- ML20196B859 + (ML20196B859)
- TXX-9823, Forwards Response to RAI Re Section 3.3 Instrumentation of Proposed TS Changes.Addl Changes to Converted Specification 3.3.5 to Address Actuation Logic & Logic Relays Will Be Provided in Subsequent Submittal + (ML20196B861)
- ML20196B862 + (ML20196B862)
- ML20196B864 + (ML20196B864)
- PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery + (ML20196B865)
- ML20196B867 + (ML20196B867)
- ML20196B868 + (ML20196B868)
- ML20196B871 + (ML20196B871)
- IR 05000312/1988035 + (ML20196B872)
- ML20196B873 + (ML20196B873)
- ML20196B874 + (ML20196B874)
- ML20196B876 + (ML20196B876)
- ML20196B877 + (ML20196B877)
- ML20196B878 + (ML20196B878)
- ML20196B879 + (ML20196B879)
- ML20196B880 + (ML20196B880)
- ML20196B881 + (ML20196B881)
- A07615, Forwards Response to 881021 Request for Addl Info Re Tech Spec Changes for Generic Ltr 83-37 + (ML20196B883)
- ML20196B884 + (ML20196B884)
- ML20196B885 + (ML20196B885)
- ML20196B889 + (ML20196B889)
- B13080, Responds to 881116 Request for Addl Info Re Spent Fuel Pool Capacity Expansion.Evaluation of Resultant Gaps & Refinement of Seismic Displacement Analysis Performed to Reconcile as-fabricated Condition.W/Revised Module Layout & Addl Info + (ML20196B890)
- ML20196B891 + (ML20196B891)
- ML20196B892 + (ML20196B892)
- ML20196B893 + (ML20196B893)
- ML20196B895 + (ML20196B895)
- ML20196B896 + (ML20196B896)
- ML20196B900 + (ML20196B900)
- DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld + (ML20196B901)
- ML20196B902 + (ML20196B902)
- ML20196B904 + (ML20196B904)
- ML20196B907 + (ML20196B907)
- ML20196B909 + (ML20196B909)
- NPL-98-0919, Forwards non-proprietary & Proprietary Versions of Revised Epips,Including Rev 50 to EPIP Index,Rev 0 to EPIP Canceled Index,Rev 48 to EPIP Form Index,Rev 0 to Form Canceled Index & Rev 32 to EPIP 1.1.Proprietary Version Withheld + (ML20196B910)
- ML20196B911 + (ML20196B911)
- ML20196B913 + (ML20196B913)
- ML20196B915 + (ML20196B915)