ML20196B915

From kanterella
Jump to navigation Jump to search
Application for Amend to License R-83,changing Administration of Nuclear Science Ctr Reactor Per Tech Specs 6.1.1 by Replacing Position of Head,Nuclear Engineering Research W/Director,Nuclear Research Reactor Programs
ML20196B915
Person / Time
Site: 05000128
Issue date: 01/21/1988
From: Richardson H
TEXAS A&M UNIV., COLLEGE STATION, TX
To: Berkow H
Office of Nuclear Reactor Regulation
References
NUDOCS 8802120185
Download: ML20196B915 (3)


Text

,_.

+

8 TEXAS ENGINEERING EXPERIMENT STATION Office of the Director 21 January 1988 Mr.- Herbert N. Berkow, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

License Ammendment - NSCR Administrative Change g

Ref:

Docket No. 50-128, R-83

Dear Mr. Berkow:

Effective 1 February 1988 there will be a change in the administration of the NSCR as presently described in 6.1.1 of the Technical Specifications to License R-83.

l The position of Head, Nuclear Engineering Research will be replaced by a recently established position titled Director, Nuclear Research Reactor Programs.

Both are positions within the Texas Engineering Experiment Station (TEES).

The change to 6.1.1 (page 46) of the Technical Specifications is attached and mailing and tele-phone information for the Director, Texas Engineering Experiment Station (R-83 licensee), the Director, Nuclear Research Reactor Programs, and the Director, I

Nuclear Science Center follows:

{

Dr. Herbert H. Richardson, Director l

Texas Engineering Experiment Station Texas A&M University l

College Station, Texas 77843 (409) 845-1321 Dr. Jon A. Reuscher, Director l*

Nuclear Research Reactor Programs Nuclear Science Center Texas A&M University l

F. E. Box 89 College Station, Texas 77845 (409) 845-7551 L

Mr. Donald E. Feltz, Director Nuclear Science Center Texas A&M Universitj l

F. E. Box 89 hl College Station, Texas 77843 (409) 845-7551 1

I 8802120105 800121 PDR ADOCK 05000128 P

PDR The Texas A&M University System o Engineering Research Center College Station, Texas 778 tJ 3577 e (409) 8451321 I

p,

- 3 i

-6.0 Administrative Controls

-6.1 Organization-6.1.1-Structure a.- 'The-facility shall be under the direct control of the' Director (NSC) or.a licensed senior operator designated by'him tr be in

' direct control. The Director (NSC) shall be responsible to

~

the Director of the Texas. Engineering-Experiment-Station (TEES)' for safe operation and maintenance of the reactor. and its associated equipment.. The Director,(NSC) shall report to the Director of. TEES through the Director Nuclear Research Reactor Programs.

The Director (NSC)Jor'his appointee shall~

review and approve all experiments and experimental procedures prior to their use in the reactor. He shall enforce rules for

-the protection of personnel against radiation.

b.

The safety of operation of-the Nuclear Science Center Reactor shall be related to the reactor licensee as shown'in the-following chart.

Director Radiological Texas Engineering Reactor Safety Experiment Station Office (TEES)

Safety Board

=

1 l

Director i

Nuclear Research j.

Reactor Programs (TEES) 1 1

I I

' Senior Director l

Nuclear Science Center ---------J l

Health Physicist (NSC) l Reactor Operations l

l l

L l

1 ;

Mr. Herbert Berkow Page 2 Dr. J.

A.' Reuscher joined. the. Texas Engineering : Experiment. Station as Director, Nuclear Research Reactor Programs in Septerrber 1986 and is also on the faculty of-the Department of Nuclear Engineering.

He has considerable-research reactor administration experience having served as Manager of the research reactor program at - the. Sandia National Laboratory, Albuquerque, New Mexico for

  • 21 years. where he directed -the activities of '3 research.-reactor types..

D r '. Reuscher will direct programs for reactor power and facility upgrade, the development of new research capabilities, and increased utilization of the NSCR.

Respectfully submitted, dd A,

Dr. H. H. Richardson, Director Texas Engineering Experiment Station Sworn to before me the undersigned authority this 25th day of January 1988.

Z 44 46 N/mEe October 8. 1990 m

Barbara Bla'ine Smith Commission (Date) Expires Notary

-Brazos County, Texas cc:

R. D. Martin, USNRC, Region IV J. A..Reuscher, Director, Nuclear Research Reactor Programs, NSC K. L. Peddicord, Head, Department of Nuclear Engineering F. Jennings, Chairman, Reactor Safety Board D. E. Feltz, Director, Nuclear Science Center

_