Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B813 + (ML20196B813)
- ML20196B814 + (ML20196B814)
- ML20196B815 + (ML20196B815)
- ML20196B817 + (ML20196B817)
- PNO-IV-98-058, on 981125,medical Misadministration Occurred. Event Involved Nucletron Afterloader with Ir-192 Source. Brachytherapy Dosimetrist Entered Wrong Starting Position, 1500 Mm Rather than Intended 1450 Mm.Nmss Has Been Informed + (ML20196B819)
- ML20196B821 + (ML20196B821)
- ML20196B822 + (ML20196B822)
- ML20196B823 + (ML20196B823)
- NPL-98-0926, Forwards Public & Central Files Versions of Revised EPIP, Including Rev 50 to EPIP Form Index. Central Files Version Withheld + (ML20196B824)
- ML20196B825 + (ML20196B825)
- ML20196B827 + (ML20196B827)
- ML20196B828 + (ML20196B828)
- ML20196B829 + (ML20196B829)
- ML20196B830 + (ML20196B830)
- ML20196B831 + (ML20196B831)
- ML20196B833 + (ML20196B833)
- ML20196B834 + (ML20196B834)
- ML20196B835 + (ML20196B835)
- PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee + (ML20196B836)
- ML20196B837 + (ML20196B837)
- 05000259/LER-1988-044, :on 881101,unplanned ESF Actuations Occurred. Caused by Normal Supply Breaker Failing to Close Due to Operator Not Holding Breaker Control Switch Fully in Close Position.Breaker Closed & Operator Counseled + (ML20196B839)
- NPL-98-0920, Forwards Public & Central Files Versions of Revised Epips, Including Rev 49 to EPIP Form Index & Rev 31 to EPIP-22, Pbnp Plant Personnel Emergency Call List. Central Files Version Withheld + (ML20196B840)
- ML20196B841 + (ML20196B841)
- ML20196B842 + (ML20196B842)
- ML20196B843 + (ML20196B843)
- ML20196B844 + (ML20196B844)
- LIC-98-0157, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-08 on 980608-12.Corrective Actions:Mrsids Were Reviewed & Revised for Reactor Protection & Esfs on 981120 + (ML20196B845)
- B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With + (ML20196B846)
- ML20196B848 + (ML20196B848)
- ML20196B850 + (ML20196B850)
- ML20196B851 + (ML20196B851)
- IR 05000456/1987041 + (ML20196B852)
- ML20196B853 + (ML20196B853)
- ML20196B854 + (ML20196B854)
- ML20196B855 + (ML20196B855)
- ML20196B856 + (ML20196B856)
- ML20196B857 + (ML20196B857)
- ML20196B858 + (ML20196B858)
- ML20196B859 + (ML20196B859)
- TXX-9823, Forwards Response to RAI Re Section 3.3 Instrumentation of Proposed TS Changes.Addl Changes to Converted Specification 3.3.5 to Address Actuation Logic & Logic Relays Will Be Provided in Subsequent Submittal + (ML20196B861)
- ML20196B862 + (ML20196B862)
- ML20196B864 + (ML20196B864)
- PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery + (ML20196B865)
- ML20196B867 + (ML20196B867)
- ML20196B868 + (ML20196B868)
- ML20196B871 + (ML20196B871)
- IR 05000312/1988035 + (ML20196B872)
- ML20196B873 + (ML20196B873)
- ML20196B874 + (ML20196B874)
- ML20196B876 + (ML20196B876)
- ML20196B877 + (ML20196B877)