- ML20196A475 + (ML20196A475)
- ML20196A476 + (ML20196A476)
- ML20196A477 + (ML20196A477)
- ML20196A480 + (ML20196A480)
- ML20196A482 + (ML20196A482)
- PNO-I-88-016, on 880201,fire in Annunciator Panel,Located in Cable Spreading Room,Caused Loss of All Control Room Annunciators.All Emergency Sys Remained Functional During Event.Cause Not Determined.Troubleshooting in Progress + (ML20196A483)
- ML20196A484 + (ML20196A484)
- 2CAN018802, Responds to 871117 Request for Comments Re Emergency Feedwater Sys Review Team Findings.Addl Major Mods,Including Alternate Method of Providing Water to Steam Generators,Not Warranted + (ML20196A487)
- ML20196A488 + (ML20196A488)
- IA-88-571, Final Response to FOIA Request for Documents.Forwards Computer Printout of Records Available in PDR Re Chernobyl Accident & Listing of Repts Available Through Us Gpo & NTIS Identified During 881130 Telcon W/ D Lavins.W/O Printout + (ML20196A490)
- ML20196A490 + (ML20196A490)
- 05000423/LER-1988-018, :on 880519,two Reportable Events Re Control Bldg Inlet Ventilation High Radiation Control Bldg Isolation Trip Setpoint Discovered.Caused by Administrative Error. Default Values Changed to Comply W/Tech Specs + (ML20196A491)
- ML20196A492 + (ML20196A492)
- 05000373/LER-1988-002-03, :on 880316,Type B & Type C Total Leakage Exceeded 0.6 La During Leak Rate Testing.Caused by Excessive Leakages.Corrective Actions Include Installment of New Disc Listed in Table 1 + (ML20196A493)
- ML20196A495 + (ML20196A495)
- ML20196A496 + (ML20196A496)
- ML20196A497 + (ML20196A497)
- ML20196A498 + (ML20196A498)
- ML20196A503 + (ML20196A503)
- 05000338/LER-1988-025-01, :on 881101,Tech Spec 3.6.2.2 Violated.Caused by One Recirculation Spray Subsystem W/One Casing Cooling Subsystem Inoperable.Functional Testing on Casing Cooling Tank Level Transmitters Stopped + (ML20196A504)
- ML20196A506 + (ML20196A506)
- ML20196A507 + (ML20196A507)
- PM-88-003, Monthly Operating Rept for Dec 1988 + (ML20196A511)
- IR 05000334/1988027 + (ML20196A512)
- 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER + (ML20196A513)
- ML20196A515 + (ML20196A515)
- ML20196A516 + (ML20196A516)
- ML20196A520 + (ML20196A520)
- ML20196A521 + (ML20196A521)
- 05000295/LER-1988-021-03, :on 881102,inadvertent Autostart of Outside Dosimeter Component Cooling Pump Occurred.Caused by Metal Filing Shorting Out.Metal Particle Removed from Timer Contact + (ML20196A522)
- 05000382/LER-1988-012, :on 880526,steam Generator Blowdown Sampling Exceeded Required Periodicity of Tech Specs 3.3.3.1,Action 28.Caused by Personnel Error.Procedures Being Revised to Verify That Monitor Inservice & Sampling Done + (ML20196A523)
- ML20196A524 + (ML20196A524)
- ML20196A525 + (ML20196A525)
- ML20196A526 + (ML20196A526)
- ML20196A527 + (ML20196A527)
- ML20196A529 + (ML20196A529)
- ML20196A530 + (ML20196A530)
- ML20196A532 + (ML20196A532)
- 05000457/LER-1988-030, :on 881030,steam Generator Water Level Reached hi-hi Level Due to Overfeeding.Caused by Nuclear Station Operator Lack of Experience.Steam Generator Water Levels Restored to Normal Band + (ML20196A533)
- ML20196A536 + (ML20196A536)
- TXX-8880, Supplemental Deficiency Rept CP-85-50 Re Use of Improper Welding Process in Mfg of Cable Tray Tee Fittings.Initially Reported on 870930.Completion Date of 881130 for Completion of Activities Rescheduled to 890301 + (ML20196A537)
- ML20196A538 + (ML20196A538)
- ML20196A540 + (ML20196A540)
- B13084, Forwards Bimonthly Progress Rept 13,per Major Milestone Schedule for Const of New Switchgear Bldg at Facility + (ML20196A542)
- ML20196A544 + (ML20196A544)
- PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named + (ML20196A550)
- ML20196A552 + (ML20196A552)
- ML20196A554 + (ML20196A554)
- 05000354/LER-1999-006-01, :on 990518,unexpected Actuation of B Channel PCIS Occurred.Caused by Personnel Error.Addl Training Will Be Provided to Operations Personnel to Preclude Addl Unexpected ESF Actuations + (ML20196A557)
- ML20196A559 + (ML20196A559)