ML20196A525
| ML20196A525 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/30/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| IEB-88-004, IEB-88-4, TXX-88817, NUDOCS 8812060032 | |
| Download: ML20196A525 (2) | |
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
MEE Log # TXX-88817
=
File # 10119
.=
=
Ref. # NRCB 88-04 1UELECTRIC November 30, 1988 Willisen G. commeil Estewsw lire Presurst U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)
DOCKET NOS. 50-445 AND 50-446 NRC BULLETIN 88-04: POTENTIAL SAFETY-RELATED PUMP LOSS REF:
W. G. Counsil Letter TXX-88556 to NRC dated July 8, 1988 Gentlemen:
The referenced letter provided TU Electric's initiel response to six action items in NRC Bulletin 88-04, "Potential Safety-Related Pump Loss."
In that letter, we indicated our evaluation of the identified safety-related systems and pumps for Unit 1 and Common would be completed by December 1, 1988.
This evaluation will take longer than previously anticipated. Consequently, the current schedule for completion of the Unit 1 and Common evaluation is February 13, 1989.
The Unit 2 evaluation is still scheduled to be completed prior to Unit 2 fuel load.
TV Electric will provide a written res)onse describing the actions taken within 30 days of completion of the a)ove evaluations.
very truly yours,,
A W. G. Counsil i
RWH/gj c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)
GS10060032 881130 POR ADOCK 05000445 Q
PDC l
I
\\
1 a setk n streer an oeuu. resa nm
p.
0 Attachment to TXX-88817 November 30, 1988 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY C0ffilSS10N in the Matter of Texas Utilities Electric Company Docket Nos. 50-445 50-446 (Comanche Peak Steam Electric Station, Units 1 & 2)
AFFIDAVIT W. G. Counsil being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this response to NRC Bulletin 88-04; that he is f amiliar with the content thereof; and that the matters set forth therein are true and correct to the best af his knowledge, information and belief, fh j l[RO W. G. Counsil Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for
_ ) u l- -
nn t h i s A : <t. d ay o f -?tm,,, 1988, hu% 9e/C u s.,v Not ary' Publ ic My comission expires: 3// A/</b
.J