Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1987-028, :on 871211,reactor Trip Occurred Due to Inadvertent Shutting of Msiv.Caused by Solenoid Valve Stuck Open During Testing.Solenoid Valve Replaced & MSIV Tested Successfully Prior to Restarting of Plant + (ML20195H938)
- ML20195H939 + (ML20195H939)
- ML20195H940 + (ML20195H940)
- ML20195H941 + (ML20195H941)
- ML20195H942 + (ML20195H942)
- ML20195H943 + (ML20195H943)
- ML20195H945 + (ML20195H945)
- ML20195H950 + (ML20195H950)
- ML20195H951 + (ML20195H951)
- ML20195H952 + (ML20195H952)
- ML20195H955 + (ML20195H955)
- IR 05000267/1988015 + (ML20195H957)
- ML20195H959 + (ML20195H959)
- ML20195H961 + (ML20195H961)
- ML20195H962 + (ML20195H962)
- 05000461/LER-1999-007, :on 990513,main Steam Isolation Valve Leakage Control Sys Was Noted Outside Design Basis.Caused by Design Error.Revised Setpoint for Each MSIV-LCS Flow Measurement Channel to Meet Design Basis of Plant + (ML20195H963)
- ML20195H964 + (ML20195H964)
- ML20195H965 + (ML20195H965)
- ML20195H967 + (ML20195H967)
- ML20195H970 + (ML20195H970)
- ML20195H972 + (ML20195H972)
- ML20195H973 + (ML20195H973)
- 05000277/LER-1988-026-01, :on 881029,primary Containment Isolation Resulted from Undervoltage Trip of Reactor Protection Sys Channel a Due to Sensitive Rheostat.Caused by Craftsman Inadvertently Bumping Voltage Control Rheostat + (ML20195H974)
- ML20195H978 + (ML20195H978)
- ML20195H979 + (ML20195H979)
- ML20195H980 + (ML20195H980)
- 05000302/LER-1988-024, :on 881028,reactor Tripped Following Main Steam & Main Feedwater Isolation Due to Excessive Steam Pressure Decrease.Caused by Increased Main Turbine Governor Valve (Gv) Control Setting.Gv Limit Setting Reduced + (ML20195H984)
- 05000328/LER-1988-024, :on 880523,reactor Trip Occurred from Low Flow Signal on Rcs.Caused by Procedural Noncompliance.Util Will Review Past Reactor Trips for Similar Occurrence of Common Interaction Between Equipment Causing Trip + (ML20195H985)
- LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with + (ML20195H988)
- 05000277/LER-1988-025, :on 881027,Group II Primary Containment Isolation Sys Actuation Resulted from Personnel Error Re Tripping of Breaker.Caused by Inadvertently Grounding B Phase of Three Phase Circuit Breaker + (ML20195H989)
- ML20195H990 + (ML20195H990)
- ML20195H991 + (ML20195H991)
- ML20195H992 + (ML20195H992)
- ML20195H994 + (ML20195H994)
- ML20195H996 + (ML20195H996)
- ML20195H997 + (ML20195H997)
- ML20195H998 + (ML20195H998)
- ML20195H999 + (ML20195H999)
- ML20195J001 + (ML20195J001)
- IR 05000456/1988017 + (ML20195J002)
- ML20195J004 + (ML20195J004)
- ML20195J006 + (ML20195J006)
- ML20195J008 + (ML20195J008)
- ML20195J009 + (ML20195J009)
- ML20195J010 + (ML20195J010)
- ML20195J011 + (ML20195J011)
- ML20195J014 + (ML20195J014)
- IR 05000267/1987025 + (ML20195J015)
- ML20195J016 + (ML20195J016)
- U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With + (ML20195J017)
- 05000339/LER-1988-001-03, :on 881104,steam Driven Auxiliary Feedwater Pump Inadvertently Started While Being Removed from Svc for Preplanned Maint.Caused by Personnel Error.Steam Supply Isolated.Human Performance Evaluation Underway + (ML20195J018)