Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-86-035, on 860511,partial Loss of Power & Initiation of Train B Safety Injection Occurred When Station Battery 1-B Removed from Svc.Caused by Failure of Adjusted Battery Chargers to Pick Up Load.Power Restored + (ML20195D104)
- ML20195D107 + (ML20195D107)
- U-600585, Documents Justification That Fire in Vicinity of Valves Listed in Section 3.5.1.2,Paragraph 2 of Safe Shutdown Analysis Will Not Prevent Plant Shutdown + (ML20195D108)
- A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, + (ML20195D109)
- ML20195D110 + (ML20195D110)
- IR 05000458/1986012 + (ML20195D111)
- ML20195D112 + (ML20195D112)
- ML20195D114 + (ML20195D114)
- ML20195D115 + (ML20195D115)
- ML20195D116 + (ML20195D116)
- ML20195D117 + (ML20195D117)
- ML20195D118 + (ML20195D118)
- ML20195D119 + (ML20195D119)
- ML20195D120 + (ML20195D120)
- ML20195D122 + (ML20195D122)
- ML20195D123 + (ML20195D123)
- IR 05000482/1988016 + (ML20195D126)
- ML20195D127 + (ML20195D127)
- ML20195D131 + (ML20195D131)
- 05000328/LER-1988-022, :on 880519,10CFR Unqualified Butt Splice Found on Steam Generator Level Transmitter Causing Condition Outside Plant Design Basis.Caused by Not Changing Splice When Specs Changed.Unqualified Splice Replaced + (ML20195D133)
- ML20195D134 + (ML20195D134)
- ML20195D136 + (ML20195D136)
- ML20195D137 + (ML20195D137)
- ML20195D138 + (ML20195D138)
- ML20195D139 + (ML20195D139)
- ML20195D140 + (ML20195D140)
- ML20195D141 + (ML20195D141)
- ML20195D142 + (ML20195D142)
- ML20195D144 + (ML20195D144)
- ML20195D145 + (ML20195D145)
- ML20195D148 + (ML20195D148)
- ML20195D149 + (ML20195D149)
- ML20195D150 + (ML20195D150)
- ML20195D151 + (ML20195D151)
- ML20195D152 + (ML20195D152)
- TXX-4740, Responds to NRC Re Deviations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Engineers Reinstructed in Section 5.2 of Procedure CPP-008 & out-of- Scope Observation in Remarks Column Discussed W/Inspector + (ML20195D154)
- ML20195D156 + (ML20195D156)
- ML20195D157 + (ML20195D157)
- ML20195D159 + (ML20195D159)
- ML20195D160 + (ML20195D160)
- AECM-86-0136, Responds to Violations Noted in Insp Rept 50-416/86-06. Corrective Actions:Technical Section Procedure 09-S-02-400, Control Rod Sequences & Movement Control Revised to Aid Verification to Reactor Plant Control Sys Constraints + (ML20195D161)
- ML20195D162 + (ML20195D162)
- ML20195D163 + (ML20195D163)
- ML20195D165 + (ML20195D165)
- ML20195D166 + (ML20195D166)
- ML20195D168 + (ML20195D168)
- LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With + (ML20195D169)
- ML20195D170 + (ML20195D170)
- IR 05000219/1988013 + (ML20195D171)
- 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 + (ML20195D176)
- 05000412/LER-1988-015-01, :on 880928,util Informed of Cracking & Spalling at Support Pads of Diesel Generator Exhaust Silencers 2EDG*SIL3A & 3B.Caused by Bent Anchor Bolts.Increased Surveillance Recommended.Part 21 Related + (ML20195D178)