ML20195D150
ML20195D150 | |
Person / Time | |
---|---|
Site: | Pennsylvania State University |
Issue date: | 10/13/1988 |
From: | Hosler C PENNSYLVANIA STATE UNIV., UNIVERSITY PARK, PA |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML20195D153 | List: |
References | |
NUDOCS 8811040230 | |
Download: ML20195D150 (1) | |
Text
_
s THE P E N N S Y LVA N I A STATE UNIVERSITY VICE I'RESIDINI' F>R RESEARCil AND DEAN OF Tile GRADUATE SC1100L 114 KERN GRADUATE BUILDINO UNIVERSITY PARK, PA 16802 C. L. Iloster Telephor s:
Vice President and Dean 814-865-2il6 814-8 4-6 31 Annual Operating Heport, FY 87-88 Tech. Spec Requirement 6.6.1 License CDW R-2, Docket No. 50-5 October 13, 1988 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Dear Sir Enclosed plerse find the Annual Operating Report of the Penn State Breazeale Reactor (PSBR). This report covers the period from July 1, 1987, through June 30, 1988, as required by technical specifications requirement 6.6.1, contained in License (R-2 renet'ed on Jecnry 27, 1986, as Amendment No. 23 Also included are i ny changes applicable to 10 CFR 50.59.
The original renewal application dated March 1, 1985, contains the Safety Analysis Report applicable to this reporting period.
A copy of the Thirty-third Annual Progress Report of the Penn State Breazeale Reactor is included as supplementary information.
Sincerely yours, kh
- C. L. Hosler, JI'.
Vice President for Research and Dean of the Graduate School Enclosures cc: Region I Administrator U.S. Nitclear Rugulatory Ccmmission l M. H. Voth j CLH/amh l 8811040230 R
- _881013 PDC 9 \
am ,_ _,,1m,_,1T