Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000251/LER-1986-010-01, :on 860425,during Performance of Periodic Test Load on 4A 4-kV Bus,Breaker 4AA20 Failed to Close.Caused by Breaker Position Switch 52HH Not Being Actuated.Position Switch Replaced W/Redesigned Actuator & Guide + (ML20195D012)
- ML20195D016 + (ML20195D016)
- ML20195D018 + (ML20195D018)
- PNO-III-86-050, on 860528,at 90% Power,Unit Tripped Following Main Turbine Trip on Overspeed.Caused by Small Leakage in Pressurizer Spray Valve & Letdown Valve.Failure of intermediate-range Detector Under Investigation + (ML20195D019)
- ML20195D020 + (ML20195D020)
- ML20195D021 + (ML20195D021)
- ML20195D022 + (ML20195D022)
- ML20195D023 + (ML20195D023)
- A07538, Forwards Addl Info Re Corrective Actions Taken & Plans for Further Corrective Action Re Items Identified During Insp of Plant Emergency Operating Procedures (Eop).Revs Made to EOPs Eliminate Number of Deficiencies Identified + (ML20195D026)
- ML20195D027 + (ML20195D027)
- ML20195D028 + (ML20195D028)
- ML20195D029 + (ML20195D029)
- ML20195D030 + (ML20195D030)
- ML20195D031 + (ML20195D031)
- ML20195D032 + (ML20195D032)
- IR 05000267/1987029 + (ML20195D035)
- 05000301/LER-1986-001-01, :on 860429,during Routine Test of Reactor Trip a Logic Circuits,Technician Inadvertently Tripped Reactor Trip Breaker B After Closing Bypass Breaker A.Caused by Personnel Error.Test Procedure Revised + (ML20195D036)
- ML20195D037 + (ML20195D037)
- ML20195D038 + (ML20195D038)
- ML20195D040 + (ML20195D040)
- IR 05000483/1986013 + (ML20195D041)
- W3P88-1254, Forwards Public Version of Objectives for Emergency Preparedness Exercise Scheduled for 881012 + (ML20195D043)
- B17535, Forwards Monthly Operating Rept for Oct 1998 for Mnps,Unit 2.Revised MOR for Aug 1998,encl.No New Requlatory Commitments Are Contained in Ltr + (ML20195D044)
- ML20195D045 + (ML20195D045)
- ML20195D047 + (ML20195D047)
- ML20195D048 + (ML20195D048)
- ML20195D050 + (ML20195D050)
- ML20195D051 + (ML20195D051)
- ML20195D053 + (ML20195D053)
- ML20195D054 + (ML20195D054)
- ML20195D055 + (ML20195D055)
- ML20195D056 + (ML20195D056)
- ML20195D057 + (ML20195D057)
- ML20195D058 + (ML20195D058)
- 05000327/LER-1986-006-01, :on 860318,roving Fire Watch Person Unable to Enter Two Rooms to Check for Fires Due to Inoperable Fire Doors.Caused by Loose Screw in Pull Handle.Door Repaired & Returned to Svc + (ML20195D059)
- ML20195D060 + (ML20195D060)
- ML20195D061 + (ML20195D061)
- ML20195D063 + (ML20195D063)
- L-94-014, Rev 1 to Safety Analysis of Radiological Consequences of SBLOCA at U2 with Delayed CNMT Spray Actuation & NUREG-1465 Core Damage Progression + (ML20195D064)
- IR 05000482/1988012 + (ML20195D065)
- ML20195D067 + (ML20195D067)
- ML20195D068 + (ML20195D068)
- ML20195D069 + (ML20195D069)
- ML20195D071 + (ML20195D071)
- ML20195D074 + (ML20195D074)
- ML20195D076 + (ML20195D076)
- 05000327/LER-1988-019, :on 880424,reactor Trip Signal Generated from Electromagnetic Interference.Caused by Welding Machine Operating at High Frequency Near Source Range Nuclear Instrument Cabling.Signals Can Be Bypassed + (ML20195D077)
- ML20195D078 + (ML20195D078)
- ML20195D079 + (ML20195D079)
- RBG-44690, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (ML20195D080)
- ML20195D081 + (ML20195D081)