Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154L272 + (ML20154L272)
- ML20154L273 + (ML20154L273)
- ML20154L274 + (ML20154L274)
- ML20154L275 + (ML20154L275)
- ML20154L279 + (ML20154L279)
- ML20154L280 + (ML20154L280)
- ML20154L283 + (ML20154L283)
- ML20154L285 + (ML20154L285)
- 05000424/LER-1988-013-01, :on 880424,manual Reactor Trip Initiated in Anticipation of Receiving Steam Generator Low Level Setpoint Automatic Reactor Trip.Caused by Loop 4 Main Feed Isolation Valve Failure.Involved Component Replaced + (ML20154L286)
- ML20154L287 + (ML20154L287)
- 05000400/LER-1988-010-01, :on 880425,containment Purge Valves Not Closed as Required While Containment Leak Detection Radiation Declared Inoperable for Sampling.Caused by Personnel Error. Sampling Procedures Will Be Revised + (ML20154L288)
- ML20154L289 + (ML20154L289)
- ML20154L290 + (ML20154L290)
- ML20154L291 + (ML20154L291)
- NRC-88-0124, Ro:On 880420,emergency Diesel Generator (EDG) 13 Start Failure Occurred.Caused by Improper Setting of EDG 13 Woodward Generator Actuator Load Limit Knob by Unauthorized Person.Edg Unloaded & Load Limit Knob Set to Max + (ML20154L292)
- NLS8600088, Forwards Dcrdr Suppl to Summary Rept + (ML20154L293)
- ML20154L294 + (ML20154L294)
- ML20154L295 + (ML20154L295)
- ML20154L296 + (ML20154L296)
- ML20154L297 + (ML20154L297)
- ML20154L299 + (ML20154L299)
- ML20154L300 + (ML20154L300)
- ML20154L302 + (ML20154L302)
- ML20154L305 + (ML20154L305)
- ML20154L306 + (ML20154L306)
- IR 05000353/1986004 + (ML20154L307)
- ML20154L308 + (ML20154L308)
- 05000321/LER-1988-005-02, :on 880419,reactor Scram Occurred After Personnel Exchanged Turbine Lubrication Oil Coolers.Caused by Personnel Error.Involved Operations Personnel Counseled & Procedures Revised + (ML20154L310)
- ML20154L311 + (ML20154L311)
- ML20154L313 + (ML20154L313)
- ML20154L314 + (ML20154L314)
- ML20154L315 + (ML20154L315)
- ML20154L317 + (ML20154L317)
- PY-CEI-NRR-0427, Certifies That Final Draft Tech Specs Consistent W/Fsar,Nrc SER & Suppls & as-built Plant Per NRC 851119 Request.Tech Spec Review Programs Described in Encl.Nrc 851129 & 1230 & 860307 Concerns Under Review + (ML20154L318)
- ML20154L319 + (ML20154L319)
- ML20154L321 + (ML20154L321)
- BECO-88-137, Forwards Util Response to SALP Rept 50-293/87-99 for 870201-880515.Util Ability to Self Assess & to Set & Meet Rising Stds of Excellence Proven + (ML20154L323)
- ML20154L324 + (ML20154L324)
- ML20154L326 + (ML20154L326)
- 05000333/LER-1988-001, :on 880310,HPCI Turbine Steam Supply Valve Failed to Open in Response to Open Signal.Caused by Procedures Not Including Evaluation of Relubrication of Threads of Valve Stem & Stem Nut + (ML20154L327)
- ML20154L328 + (ML20154L328)
- ML20154L329 + (ML20154L329)
- ML20154L331 + (ML20154L331)
- ML20154L333 + (ML20154L333)
- IR 05000413/1988032 + (ML20154L338)
- ML20154L339 + (ML20154L339)
- ML20154L340 + (ML20154L340)
- ML20154L341 + (ML20154L341)
- ML20154L342 + (ML20154L342)
- ML20154L344 + (ML20154L344)
- ML20154L346 + (ML20154L346)