Mgt Meeting Rept 50-353/86-04 on 860207.Major Areas Discussed:Resumption of Const,Including Changes,Const Schedule,Manpower & Contractor Incentive Program
ML20154L307
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/04/1986
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20154L269 List:
References
50-353-86-04-MM, 50-353-86-4-MM, NUDOCS 8603110441
Download: ML20154L307 (3)


Text

.

-

John S. Kemper 3 Philadelphia Electric Co.

U U. S. NUCLEAR REGULATORY COMMISSION

REGION I

.

Report N Docket N . License N CPPR-107 Priority --

Category A Licensee: Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Facility Name: Limerick, Unit-2 Meeting At: US NRC, Region I, King of Prussia, PA Meeting Conducted: ' February L 1986 Approved by: kVy M R. M. Gallo, Chief te Reactor Projects Section 2A, DRP Meeting Summary: Management Conference on February L 1986 (Report Number 50-353/86-04)

Summary: NRC requested management meeting convened to discuss resumption of construction activities at Limerick Unit The licensee presented information related to recent organizational changes, construction scheoule, manpower, contractor incentive program, union

" Built-Rite" program, quality assurance program, allegation controls, NRC site facilities, and design change policie Questions and comments from NRC Region I and Headquarters personnel were briefly discussed. The meeting was approximately two hours in duratio ygkb O

-

p

,

John S. Kemper 4 Philadelphia Electric C DETAILS Attendees Philadelphia Electric Company (PECO)

V. S. Boyer, Senior Vice President - Nuclear J. S. Kemper, Vice President, Engineering and Research (ER)

W. T. Ullrich, Superintendent, Nuclear Generation Division P. K. Pavlides, Director, Quality Assurance, ER T. P. Gotzis, Manager, Construction, Limerick 2 H. R. Walters, Engineer-in-Charge, Project Section, ER J. M. Corcoran, Manager, Quality Assurance, Limerick 2 US Nuclear Regulatory Commission (NRC)

T. E. Murley, Regional Administrator R. W. Starostecki, Director, Division of Reactor Projects (DRP)

W. F. Kane, Deputy Director, DRP S. D. Ebneter, Director, Division of Reactor Safety S. J. Collins, Chief, Project Branch 2 R. M. Gallo, Chief, Project Section 2A K. H. Gibson, Reactor Engineer, RPS 2A J. T. Wiggins, Chief, Materials and Processes Section (M&PS)

E. Harold Gray, Lead Reactor Engineer, M&DS C. J. Anderson, Chief, Plant Systems Section W. D. Altman, Acting Chief, QA Branch, IE W. M. Hill, Sr. Engineer, IE M. W. Peranich, Chief, Construction Program / CAT Section, IE Discussion The meeting of February 7, 1986 was scheduled at the NRC's request to discuss resumption of construction activities at Limerick, Unit Highlights of the licensee's presentation were as follows:

- Organizations of PECO Engineering and Research Department and Limerick, No.2 Project were presented. The licensee stated that key contractor personnel are returning to manage construction activities. Manpower build-up is expected to peak'at approximately 2500 manual and.1200 non-manual personnel by late 198 A fifty-one month schedule which targets April,1990 for fuel load and October, 1990 for commercial operation was presente ~

.

.

John S. Kemper 5 Philadelphia Electric C An incentive program has been established with the prime contractor (Bechtel).

- A " Built-Rite" Program has been agreed to by local trade unions and managemen Quality assurance program is the same as Unit No. I's with a work package concept being employe QA/QC manpower is planned to peak with 23 auditors, 250 inspectors plus 16 contractor QA personnel

-

Allegation controls include accessible QC inspectors to identify field concerns and use of anonymous termination exit interview Design changes are to be kept at a minimu NRC resident facility location is proposed near the licensee and contractor QA/QC facilitie The licensee responded to NRC Region I and Headquarters representatives questions and comments concerning quality assurance training for crafts, schedule for replacement of equipment transferred to other plants, handling of potential differences between Limerick Units No.1 and 2, handling of tie-ins between the two units, and potential regulatory impact of recent earth quake activity in Ohi The meeting of February 7, 1986 was approximately two hours in duratio Conclusion The licensee discussed plans and programs to support construction of Limerick, Unit 2 on schedule and assuring quality. The licensee requested NRC cooper-ation in prompt review and processing of proposed design changes. Region I commented that the licensee appears to be adequately prepared to resume construction and that increased NRC inspection efforts are planned in the near future.