Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153G740 + (ML20153G740)
- ML20153G741 + (ML20153G741)
- ML20153G743 + (ML20153G743)
- ML20153G747 + (ML20153G747)
- ML20153G748 + (ML20153G748)
- ML20153G751 + (ML20153G751)
- ML20153G752 + (ML20153G752)
- 05000295/LER-1988-003, :on 880302,station Received Confirmation That Samples of Sr-89 Being Shipped to Offsite Lab for Isotopic Analysis Did Not Meet Lower Limit of Detection Required by Tech Spec.Caused by Delays in Shipment + (ML20153G753)
- ML20153G754 + (ML20153G754)
- ML20153G755 + (ML20153G755)
- ML20153G756 + (ML20153G756)
- ML20153G757 + (ML20153G757)
- ML20153G758 + (ML20153G758)
- ML20153G761 + (ML20153G761)
- ML20153G762 + (ML20153G762)
- ML20153G763 + (ML20153G763)
- ML20153G764 + (ML20153G764)
- ML20153G765 + (ML20153G765)
- IR 05000413/1988022 + (ML20153G766)
- ML20153G766 + (ML20153G766)
- ML20153G767 + (ML20153G767)
- 05000213/LER-1988-011, :on 880408,required Test Interval for Surveillance Procedure Sur 5.2-9 Found Exceeded by 1 Wk in Violation of Tech Specs.Caused by Personnel Error.Test Performed on 880408 W/Satisfactory Results + (ML20153G769)
- ML20153G770 + (ML20153G770)
- ML20153G771 + (ML20153G771)
- ML20153G773 + (ML20153G773)
- ML20153G774 + (ML20153G774)
- ML20153G775 + (ML20153G775)
- ML20153G777 + (ML20153G777)
- ML20153G778 + (ML20153G778)
- ML20153G780 + (ML20153G780)
- ML20153G781 + (ML20153G781)
- ML20153G782 + (ML20153G782)
- IR 05000369/1988014 + (ML20153G783)
- 05000255/LER-1986-006, :on 860125,power to 2,400-volt Bus 1C Lost During Transfer Attempt Between Station Power Breakers. Caused by Failure of Personnel to Recognize That Breaker Receiving Power Transfer in Test Position + (ML20153G784)
- ML20153G785 + (ML20153G785)
- ML20153G786 + (ML20153G786)
- 05000254/LER-1987-022-01, :on 871109,full Reactor Scram Ocurred.Probably Caused by Short Circuit Developed Due to Metal Particles & Dirt Found in Intermediate Range Monitor Wiring Connectors. Connectors Cleaned & Procedures Revised + (ML20153G789)
- ML20153G790 + (ML20153G790)
- ML20153G791 + (ML20153G791)
- ML20153G792 + (ML20153G792)
- ML20153G796 + (ML20153G796)
- ML20153G802 + (ML20153G802)
- ML20153G803 + (ML20153G803)
- ML20153G804 + (ML20153G804)
- ML20153G805 + (ML20153G805)
- 05000265/LER-1988-006-05, :on 880404,eleven Flued Head Anchors Discovered Outside Design Requirements of Final Fsar.Caused by Misinterpretation of Scope Due to Structures Not Being Reassessed,Per IE Bulletins 79-02 & 79-14 + (ML20153G807)
- ML20153G808 + (ML20153G808)
- ML20153G809 + (ML20153G809)
- ML20153G810 + (ML20153G810)
- ML20153G811 + (ML20153G811)
- ML20153G817 + (ML20153G817)