AUG 2 619N l
t l,
NOTICE OF SIGNIFICANT MEETING Name of Licensee: Carolina Power and Light Coripany Name of Facility: Brunswick 1 and 2 Docket Nos.: 30-325 and 50-324 j
Date and Yime of Meeting:
September 3, 1988, at 9:00 a.m.
j Location of Meeting:
Enforcement Conference to discuss:
(1) recently
[
discovered instrument installation deficiancies and non-conservatisms in the instrument settings l
associated with High Pressure Coolant Injection (HPCI)/ Reactor Cort Isolation Cooling (RCIC) high steam line flow isolation; (2) apparent inadequate corrective action relatad to operability of safety-l related DC motor operated valves; and (3) electrical switchboard operability as it relates to the apparent inadequacy of actions taken to identify and correct j
silicon bronze bolt failures.
This meeting had been previously rescheduled from July 7, to July 20, 1988.
j r
NRC Attendees:
M. Ernst, Deputy Regional Administrator j
L. A. Reyes, Director, Division of Reactor Projects (DRP) i A. F. Gibson, Director, Division of Reactor Safety (DRS) l G. R. Jenkins, Director. Enforcement and Investigation Coordination Staff 1
D. M. Verrelli, Chief, Reactor Pr9jects Branch 1, DRP t
A. R. Hardt, Chief. Enginaering P,;anch, DRS i
P. E. Fredrickson, Chief Projects Section 1A, DRP W. H Ruland, Senior Resident Inspector l
l Licensee Attendees: M. A. McDuffie, Senior Vice President, Nuclear Generation i
P. W. Howe, Vice President, Brunswick Nuclear Project l
J. L. Harness, General Manager, Brunswick l
R. E. Enzor Director, Regulatory Compliance i
R. B. Richey, Manager, Lictnsing and Nuclear Fuel R. E. Helme, Manager. Technical Support i
L. I. Loflin, Section Manager, Nuclear Licensing NOTE:
Attendance by NRC personnel at this NRC/ Licensee meeting should be l
made known by 2:00 p.m., September 7,1988, via telephone call to P. Fredrickson FTS 242-5649.
Approved by:
./
t P. E. Fredr}ckson, Section Chief Division o/f/ Reactor Project l
l 8809080379 880826 PDR ADOCK 05000324 PNU t
.lt vr I
s I,US 2 0 1EE3 2
Distribution:
J. Taylor, Deputy Executive Director for Regional Operations J. Lieberman, Director, Office of Enforcement W. M. Treskoski, Regional Coordinator (ED0)
E. G. Adensam, Director, Directorate 11-1 G. C. Lainas, Asst. Director for Region 11 Reactors, NRR bec: J. P. Stohr R. J. Maley K. M. Clark P. J. Fillion All NRC Attendees Receptionist NRC Resident inspector i
DRS, Technical Assistant l
Document Control Desk State of North Carolina l
l l
l 1
l l
1 l
l l
l I
l R
Rll Ril f
' /
1
'tu
/
l B arroll:tj PFr rickson DVerrelli
,.- y/7 7/ E8 son 08//pS8 08/s1/88p 08/ V88
- p. 8 l
7 l
Ril Ril [
Rll g s c-
.a (ins
.NErnst WHehl
[Geyes l
l 08/ /88 080.L'88 08/p/88
' ' 0843/88
-