|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:NRC TO LEGAL/LAW FIRM
MONTHYEARML20056B3071990-08-22022 August 1990 Accepts Cap Rock Electric Cooperative,Inc 900628 Motion to Withdraw 890512 2.206 Petition for Enforcement & Mod of Antitrust License Conditions,Per 900621 Settlement.Fr Notice Withdrawing Petition Encl ML20055E2751990-06-0505 June 1990 Final Response to FOIA Request for Records.Releasable Portion of App a Record Encl.App a Record Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20246K3181989-08-31031 August 1989 Responds to Appeal of 890608 Denial of FOIA Request for Fee Waiver.Request Does Not Meet Requirements of 10CFR9.41. Appeal Denied ML20246K6521989-08-31031 August 1989 Forwards Notice of Reevaluation & Affirmation of No Significant Change Finding Per OL Antitrust Review,Per 890726 Request ML20245C7081989-06-20020 June 1989 Informs That Director of NRR Made Finding That No Significant Antitrust Changes Occurred Subsequent to Antitrust CP Review.Finding Subj to Reevaluation If Member of Public Requests Same in Response to Fr Publication ML20245A0181989-06-14014 June 1989 Ack Receipt of 890512 Petition,On Behalf of Cap Rock Electric Cooperative,Requesting Issuance of Order Enforcing Antitrust License Conditions to Require Licensee to Stop Abusing Monopoly Power.Fr Notice Encl ML20244D9091989-06-12012 June 1989 Final Response to FOIA Request for Records.App a Records Available in Pdr.App B Records Encl & Available in PDR ML20244A7161989-06-0707 June 1989 Final Response to FOIA Request for Documents.Forwards App N & O Documents.Apps M & N Available in Pdr.App O Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7).App P Withheld (Ref FOIA Exemption 7) ML20247F8351989-05-16016 May 1989 Responds to Withdrawing Portion of Case 860131 Request for Remedial Relief Re Expiration of Cp.Civil Penalty Not Imposed Based on Util Extensive Corrective Action Program & Improvements in Mgt Policies ML20245J9171989-05-0101 May 1989 Denies Appeal of Dh Grimsley 890124 Denial of FOIA Request for Documents Re Insp Repts 50-445/89-59 & 50-446/88-55. Documents Listed in App Withheld (Ref FOIA Exemptions 5 & 6) ML20195G6771988-11-17017 November 1988 Confirms Oral Agreement Settling Civil Action 87-2051.Listed Documents from Vaughn Index Will Be Released ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20154H6111988-05-19019 May 1988 Releases All Documents at Issue in Count 1 of Gap Vs NRC, Case Number 87-2053.GAP Should Submit Clarified Request Resolving FOIA-86-81 Per Settlement Agreement.Subj Documents Will Be Forwarded to PDR ML20153G7861988-05-0606 May 1988 Partial Response to FOIA Request for Documents Re Deficient Painting Works in Containment Bldgs at Facility.Forwards App I & J Documents.App I Documents Also Available in Pdr.App J Document Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20148D8631988-03-11011 March 1988 Forwards Draft of Insp Rept 50-445/82-14 Initially Withheld on App D of NRC Response to FOIA-84-210 & Typing Cover Sheets or Transmittal Pages of Several Documents Initially Withheld in Response to FOIA-86-181 ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR DD-87-10, Informs That Time within Which Commission May Act to Review Director'S Decision DD-87-10 Expired.Commission Declined Review.Decision Became Final Agency Action on 870720.Served on 8707281987-07-28028 July 1987 Informs That Time within Which Commission May Act to Review Director'S Decision DD-87-10 Expired.Commission Declined Review.Decision Became Final Agency Action on 870720.Served on 870728 ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20216D2501987-06-25025 June 1987 Responds to 870311 Petition Requesting Mod of CPs CPPR-126 & CPPR-127.Petition Denied.Fr Notice Encl ML20214G3651987-05-14014 May 1987 Informs That Staff Unable to Proceed W/Further Substantive Response to Case 861204 Discovery Request Re Rept of Investigation on Region 5 Mgt Actions.Redacted Version of Rept Provided to Board on 861211.Related Correspondence ML20207Q0741987-01-16016 January 1987 Partial Response to FOIA Request for Documents Re Drug & Alcohol Use at Nuclear Facilities.Document Listed on App C Available in Pdr.Documents Listed on App D Partially Withheld (Ref FOIA Exemption 6) ML20207J7921987-01-0505 January 1987 Informs of Extension of Time to 870113 for Filing Comments on Behalf of Brazos Electric Power Cooperative,Inc in Antitrust Proceeding ML20207J4061986-07-24024 July 1986 Repeats 860519 Request for Data Responsive to Reg Guide 9.3 Re Antitrust OL Review.Responses from All co-owners Required to Assess Whether or Not Any Significant Changes Occurred Since 1980 Antitrust Settlement ML20207J3941986-07-24024 July 1986 Repeats 860519 Request for Data Responsive to Reg Guide 9.3 Re Antitrust OL Review.Responses from All co-owners Required to Assess Whether or Not Any Significant Changes Occurred Since 1980 Antitrust Settlement ML20206J6621986-06-20020 June 1986 Informs That No Documentation Exists Re Recipient Discovery Request for Accounting of Meetings W/Util Not Formally Noticed.No Meetings Between Region IV & Util Conducted Since Sept 1985.Related Correspondence ML20195B6681986-05-22022 May 1986 Responds to Expressing Concern Re Conduct of NRC Counsel in Proceeding.Counsel Did Not Act Improperly.Related Correspondence ML20205Q1381986-05-21021 May 1986 Responds to Expressing Concern That Region IV Conducting Meetings W/Texas Utils Electric Co in Direct Violation of NRC Open Meeting Policy.Meeting Held for General Discussion & Not Required to Be Open to Public ML20198E2851986-05-20020 May 1986 Notifies of 860605 Meeting W/Shao & Bangart in Bethesda,Md to Complete Case Informal Discovery Re Miscellaneous & Civil/Structural Issues Addressed in Technical Review Team Ssers,Per 860515 Telcon.Related Correspondence ML20203P6621986-05-0202 May 1986 Ack Receipt of to Jm Taylor Re Enforcement Action EA-83-64.No Further Action Anticipated on EA-83-64 Before 860515 ML20203L6311986-04-25025 April 1986 Responds to Expressing Case Objection to Reliance on Pending FOIA Requests to Satisfy 860307 Request for Production of Documents Re OL Proceeding.Related Correspondence ML20203D7191986-04-16016 April 1986 Confirms 860415 Telcon Re Cancellation of Meeting W/Shao & Bangart Scheduled for 860417 Re Case Informal Discovery Concerning Technical Review Team Ssers.Meeting Will Be Rescheduled.Related Correspondence ML20154R0821986-03-25025 March 1986 Responds to 860307 Request That Ofc of Inspector & Auditor Rept, T-Shirt Incident Be Released Per 10CFR2.744 & 2.790. Rept Represents Assessment of Handling of Incident Rather than Licensee Activities ML20138D5691985-12-11011 December 1985 Confirms That ASLB Request to Establish Second Board for Intimidation & Harassment Issues Not in Writing,In Response to .Request Made Due to Mccollom Workload Conflicts.Served on 851212 ML20205E8171985-10-12012 October 1985 Responds to Case 850815 Comments Re Comanche Peak Response Team Program Plan.Nrc Will re-review Plan Following Applicant Response to All Concerns.Meeting W/Case to Discuss Findings Suggested ML20205E8111985-10-12012 October 1985 Expresses Appreciation for 850815 Comments on Comanche Peak Response Team Program Plan.Review of Plan Will Be Complete Following Applicant Response to All NRC Concerns ML20128C6041985-06-29029 June 1985 Advises That Best Efforts Made to Complete Replies to Case 850607 Request for Admissions Re Sser 10 in Timely Fashion. Complaint in That Reply Woefully Behind Schedule Misplaced.Related Correspondence ML20126G2261985-03-20020 March 1985 Responds to Appeal Re 850110 Partial Denial of FOIA Request for Records Concerning Const of Facility & Brown & Root,Inc. Appeal Denied (Ref FOIA Exemption 5) Due to Predecisional Nature of Documents ML20126D9471985-03-19019 March 1985 Further Response to FOIA Request for Info Re Issues Discussed in Commission 840516 Order CLI-84-8 Re Exemption Requirements in OL Proceeding.App F Documents Partially & App G Documents Completely Withheld (Ref FOIA Exemption 5) ML20140F0561985-03-11011 March 1985 Further Response to FOIA Request for Documents Re Brown & Root,Inc.Forwards App D Documents.Documents Also Available in PDR ML20125C2041985-02-15015 February 1985 Further Response to FOIA Request for Documents Re Brown & Root,Inc.Forwards Documents Listed in App C.Documents Also Available in PDR ML20129J2301985-01-10010 January 1985 Further Response to FOIA Request for Documents Re Brown & Root,Inc.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Withheld (Ref FOIA Exemption 5) ML20054M1781982-07-0808 July 1982 Responds to Re NRC Purchase from Citizens Assoc for Sound Energy Significant NRC Documents Mentioned in NRC 820524 Prefiled Direct Testimony.Nrc Has Copies of All Documents 1990-08-22
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
S. NUCLEAR REGULATORY COMMISSION NAc soia ntoutst howstaisi f... .%S.,
g.
. t 1
Foi A- & M? usrosst pit , s 1 5 RESPON3E O FREE OM O '
l ' * ^' M '*'^' 9 I4tj "g ,/ INFORMATION ACT (FOlA) REQUEST My g jgh e....
DoCOT NvueEa se oreco= ,s.i Liout5ita 1 OGG, -
R R R s)
PARfl.-RECORDS RELEASED OR NOT LOCATED (See checaed bones)
No agency records subsect to the roovest have been located.
No additonal agency records subsect to the roovest have been located.
Agency records Ab ect t to the request that are arJentified in Append.a are already avaelable for publ.c repecten and copymg m the NRC Pec Document Room 1717 H Street. N W , Washegion DC Agency records wbiect to the request that a's identifed in Appendis _ are beeg made a.a lable for pubhc especten and copyeg in the NRC Pubhc Documeet Room,1717 H Street. N W , Was%.ngton. OC, in a folder under the FOI A number and requester eame The nonpropr.etary versen of the proposauss that you agreed to accept m a telephone conversaten uth a member of my statt e now becg made avaiable for pubhc inscection and coymg at the NRC Pubhc Document Room.1717 H Street. N W , Washangton. DC. m a fo6 der under the FOIA number and requester name.
Enctosed e informaten on how you may ebtam access to and the charges for copyng records placed e the NRC Pubhc Document Room,1717 H Street. N W , Washington. OC.
Agency records sub;ect to the request are enclosed. Any apphcable charge for copees of the records provided and pav rent e procedures are noted m the comments sectN>n.
Records sub,ect to the roovest have been referred to another Federal agencytiest for reven and Snect response to you In view of NRC's respoese to the request, no further action a bemg taken on appealletter cated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certam eformaton m the requested recera e bemg withhead from pubhc desciosure pursuant to the FOIA esemptons described m and for the reasoes stated in Pad 11, sec-tions B. C. and D. Any rewesed portens of the documents for which only part of the record is bece mthheid are bemg made avadable for pubhc escecten and copying m the NRC Pubbc Document Room.1717 H Street. N W., Washegton OC, e a foider ur<,ar this FOtA numter and requester name Comments 8805120015 880506 PDR FOIA HARRYB4-487 PDR 5 it/s o stCTom. otyscs s %;tt s W ^4aOS s
- M, NIC FORM 464 e rs e 9 ts-
FREEDOM OF INFORMATION ACT RESPONSE FOIA NUMBECISO D AV ^ y g %
PART II 8- APalCABLE FOtA EXEMPTIONS C' "
W Records subject to the request that are desenbed in the enclosed Appendices are being withheld in their entirety or in part under FOIA Exernptions and for the reasons set forth below pursuant to 5 U.S C. 552(b) and 10 CFR 9 5(a) of NRC Regulatons. I I
- 1. The wthbe6d inforrrstion a propedy classded pursuant to Enocutrve Order 12356 IEXEMPTION 11
- 2. The wthheid enformation toistes soWy to the internal personnel rules and procedures of NRC. (EXEMPTION 21
- 3. The wthheld information e specdica yc enempted from pubhc desciosure by sistute indicated. (EXEMPTION 31 Secten 141145 of the Atomic Energy Act w+vch prohets the dasclosure of Restncted Data or Formerfy Restncted Data 142 U S C. 216121651.
~e ~
Secten 147 of tN Atomic Energy Act wh.ch proh&ts the dWosure of Unclass. fed Sa eguards r leformaton 142 U S.C. 2167).
- 4. The wthheld eformation a e trade secret or commercial or financel mformataon that a being ethheld for the reasorWsl edicated iEXEMPTION di The informaton e considered ta be confidental buseess fpropretary) informaton.
The informat an e consdered to be propretary informaton pursuant to 10 CFR 2.790tdH1).
The informt on was submatted and recorved in conf 4ence from a foregn source pursuant to 10 CFR 2.790(dM21.
- 5. The withheld information consets of interagency or etraagency records that are not avadable througn discovery durmg trtgaton Doctosure of predeceional eformaton would tend to chsbet the open and frare enchange of ideas essente to the deliberatrve process. Where reccids are wthheid m the* entirety, the facts are meutncably etertwined wi's the predocsenal c4ormation. There also are no reasonably segregable factual portons because the resease of the facts would permit an enerect inquiry anto the predecmonal process of the a9Ey. (EXEMPTION 51
- 6. The wthheld information e emenpred from pubfec deciostee because ets dsclosure would result e a clearfy ur'*arranted evasson of personal prwacy. (EXEMPTION 6) t
- 7. The withheid informaton conosts of evestgatory records comoded for law enforcement purposes and a beeg witmeed for the reasarus) indcated IEXEMPTION 7)
D,sclosure would eterfere wth an enforcement proceedeg because et coued reveal the scope. directon, and focus of eeforcement er forts. ano trws could possabry stiow them to take actson to sheeld potental wrongdoeg or e votaton of NRC requirernents from evestgators tEXEMPTION 7tAH Declosure would constrtute an unnerranted invason of pe<sonal pervacy (EXEMPTION 7tCO
.34
.The eformaton corests of names of m and coer eformation the disclosure of wk.ch would revealidentrbes of confide
- tact sources. (EXEMPTION 7tDH PART ll C-DENYING OFFICIALS Pursuant to 10 CFR 9 9 and /or 915 of the U $ Nuclear RepAstory Commason reguistons, it has been determeed that the eforrnaton wthreed e enempt from producten or deciosure.
and that its prodwton or declosure e cortrary to the putec mterest The persons respons&e for the demal are those officeis identded te ow as denyeg office 6s and the Otrector.
Ovvoson of Rules and Records. Office of Aermstraten, lor any dervats that rnay te appealed to the Enecutive Director for Operatens is:ci DENY:NG OFFICIAL TIT LE < OF FIC E RECOR DS.OENIED APPELLATE OFFICIA'.
.A stcatiAev Ioo 9
. %LLU20l OASO A(b LOY1h ' Ntl X h W)
PART 110- APPEAL R10 HTS The denial by each denymg official dentifed in Part Il C may be appealed to the AppeHate Official identified in that secton. Any such appeal must be in writing and must be made within 30 days of rece54 of this response. Appesis must be addressed as appropnate to the Executrve Director for Operations or to the Secretary of the Commrsson, U S. Nuclear Regulatory Commission, Washington, DC 20555. and should clearly state on the envelope and in the letter that it is an "Appeal from an initial FOtA Decemn."
time Fonia as4 irari a U.S. NUCLEAR REGULATORY COMMISSION 4 as, FOIA RESPONSE CONTINUATION
s Re: F01A-84-487 (9th Partial)
APPENDIX 1 RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER
- 1. 10/4/84 Allegation Data Form - Q4-84-045. (1 page)
- 2. 10/4/84 Investigation Status Record Q4-84-045. (3 pages)
- 3. 10/4/84 Case Chronology Q4-84-045. (1 page)
- 4. 10/4/84 Investigator's Handwritten Notes. (1 page)
- 5. 5/14/85 Meno for Noonan from Hayes, subject: Open Office of Investigations Reports on Comanche Peak, Units 1 and 2.
(1 page)
- 6. 5/22/85 Investigator's Handwritten and typewritten notes. (1 page)
- 7. 12/3/85 Memo for Martin from Herr, subject: Comanche Peak Steam Electric Station: Alleged Falsification of Coatings Quality Control Training Records. (Q4-84-045). (1 page)
- 8. 12/3/85 Comanche Peak Steam Electric Station, Alleged Falsification of Coatings Quality Control Training Records.
(6 pages)
- 9. Undated Investigator's Handwritten Notes. (1 page)
Re: F01A-84-487 (9thPartial)
APPENDIX J RECORD PARTIALLY WITHHELD EXEMPTIONS 6, 7C and 7D
- 1. 8/21/84 Questions Relative to Allegation No. 33. (1 page) f 4-t
)
4 a
{
l P
.-,. . . . - , - . . . - - . - - - - - ~ - . , - - - _ . _ . - . - , , , , . . - . , - . . _ . - , - , . , - , _ - - _ . , - - - - - - .
e .
L AW OFFICES
.. RoGOVIN, HUGE & LENZNER a enora ssiowas coneonations
' w:TC ELL ROGC v.N 873o RHoDE ISL AND AVENUE, N. W. JAMES F.N(AL
[,$.' ,*'jc'N r h t R WASHINGTON, o. C. 2oo36 GE0mGC f. FRAMPt0N.JR.
JOatA* ' A N 0. 5CMILLER cA< : a.e0v0 September 14, 1984 'ELC'*0NE sca%4 tgt etCa (202) 466 6464 C Ath: J. COM ET vC# C.JACKSO4 TELECOPIER W AA5edLL 5.woLFF (202) 466 6420 ARtsia M.FOGLguAN SU$ un L.CARNtv SAUL F. 0000 MAN RAMOW.L LCC SPECA
" S**"
- M' 9// 7//Y usa R...Ra serrscr n.e6ArtNta AM., N J Abe L5 C . PF A k t l R V
M-19 9G)
Joseph Felton Director Division of Rules and Records Office of Administration U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Fraedom of Information Request FOIA 487
Dear Mr. Felton:
We are making the following request, which supplements my letter to you dated June 12, 1984, pursuant to the Freedom of Information Act, 5 U.S.C. S552 and the Nuclear Regulatory Commis-sion ("NRC") regulations codified at 10 C.F.R. Parts 2 and 9.
- 1. Please provide us with copies of all reports, memoranda, l transcripts of hearings, correspondence and any other documenta-tion in the custody or control of the NRC that pertain to hearings held by the Atomic Safety & Licensing Board ("ASLB") since January 1, 1984 regarding deficient painting works in the contain-ment buildings at the Comanche Peak Steam Electric Station l ("Comanche Peak").
We are especially interested in any information relating to Texas Utilities Generating Co. ("TUGCO"), the licensee, and Brown and Root, Inc., the construction contractor.
- 2. Please provide us with copies of all reports, memoranda, transcripts of hearings, correspondence and any other documenta-tion in the custody or control of the NRC that pertain to hearings held by the ASLB regarding intimidation of Quality Assurance inspectors by employees of 'rUGCO or Brown and Root, Inc.
25G6 !10 ' H Rff
e ROGOVIN, HUGE & LENZNER A mmor ts seONab CompomaveOm Joseph Felton September 14, 1984 Page Two We are only interested in documents that have been produced or have become available since the issuance of OI Report No.
4-83-013, dated November 3, 1983.
- 3. Please provide us with copies of the transcripts of the testimony or the statements of the following witnesses, affiants and interviewees whose comments were made during the review of TUGCO's Application for an Operating License (Comanche Peak Steam Electric Station, Units 1 and 2, Docket No.s. 50-445 and 50-446):
I Roy Keith Combs
- b. Lester Smith
- c. Freddy Ray Harrell
- d. Gates (first name not known)
- e. Hamilton (first name not known)
The FOIA provides that if only portions of a file are exempted from release, the remainder must be released. We therefore request that we be provided with all nonexempt portions which are reasonably segragable and with an inventory of all exempted portions. We reserve our right to appeal the with-holding or deletion of any information.
We are prepared to pay reasonable costs for locating the requested materials and reproducing them. If you have any questions regarding this request, please telephone us at the above number.
As provided in the Freedom of Informtion Act, we will expect to receive a reply within ten working days.
Sincerely, ROGOVIN, HUGE & LENZNER uge E cc: Stephen Isaacs NRC Information Office
e-
- LAW OrrtCES RocovlN, Huoc & LENZNER a enort s siomat conronateo=
witCMCLL ROGovlN 8 73o R H oo C IS L AN D AVE N U F, N. W. JAut$ r, NE AL
" " C * ' " "
WASHINGTON, o. C. 2oo36 E r ( m tR GCOmGC f. FR AW 870N, JR.
J04AYM AN O. $CMittCR ' ' " ' " "E OAce R.r,0Y0 June 12, 1984 (202) 466 6464 RON=A LEC 8CC A tuGENE J.COMEY TELECOPiER viCn C.JAcaSON KRi$fA M. F0GLCM AN (202) 466 6420
$USAN t. CARNEY SAut 8.G000 MAN RANDAtt Ltt $PCCR utCMAEL 0.t0*[
GAR' m.MARRi$
Lt$a e. MARK JETFREY M. 8L Af f N(R Jauts t.Pf ANCER Joseph Felton MEH)OM M Mmm Director ACT REQUEST Division of Rules and Records Office of Administration ~N[
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 k h g-/J-fg Re: Freedom of Information Request
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 U.S.C.
S 552, and the regulations promulgated thereunder by the Nuclear Regulatory Commission ("NRC") at 10 C.F.R. Parts 2 and 9, we hereby request that you provide us with the fol-lowing documents:
- 1. Copies of all records in NRC's files pertaining to any studies, investigations, inquiries (formal or informal) concerning the Comanche Peak Nuclear Power Plant ("Comanche Plant") in Texas as well as any agency documents, internal memoranda, reports, complaints, citations and orders which pertain to the Comanche Plant.
We are primarily interested in any materials related to or concerning construction of the Comanche Plant, by Brown &
Root, Inc., including safety conditions, employee relations, work standards, allegations of inferior work, faulty workmanship, deficient work standards, and deficient performance.
- 2. Copies of all records in NRC's files pertaining l to any studies, investigations, inquiries (formal or informal) ,
agency documents, internal memoranda, reports, complaints, citations and orders which pertain to Brown & Root, Inc., a Texas corporation involved in the construction of nuclear l
power plants.
i Yr $?$Y E
fT' RoGOVIN, HUGE & LENZNER a enO F E SSION AL C OneonatsOne Joseph Felton June 12, 1984 Page 2 Please call the undersigned as soon as tne documents are available and please notify us if you anticipate that the expense of complying with this request exceeds $200.00.
Thank you for your cooperation.
Sincerely, ROGOVIN, HUGE & LENZNER By: htO Harry Huge}