Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak + (ML20153E020)
- ML20153E022 + (ML20153E022)
- ML20153E024 + (ML20153E024)
- ML20153E027 + (ML20153E027)
- ML20153E031 + (ML20153E031)
- ML20153E033 + (ML20153E033)
- ML20153E035 + (ML20153E035)
- ML20153E036 + (ML20153E036)
- ML20153E038 + (ML20153E038)
- 05000278/LER-1998-004, Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820 + (ML20153E043)
- ML20153E046 + (ML20153E046)
- RBG-28575, Gulf States Utils Annual Rept Per 10CFR50.59(b)(2), Mar 1987 - Mar 1988 + (ML20153E048)
- TXX-4703, Forwards Response to Section IV of Generic Ltr 85-12, Automatic Trip of Reactor Coolant Pumps. Determination of Pump Trip Criteria,Pump Potential Problems & Operator Training & Procedures Discussed + (ML20153E049)
- 05000278/LER-1998-004-03, :on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc + (ML20153E050)
- ML20153E051 + (ML20153E051)
- ML20153E052 + (ML20153E052)
- ML20153E053 + (ML20153E053)
- ML20153E054 + (ML20153E054)
- ML20153E056 + (ML20153E056)
- ML20153E059 + (ML20153E059)
- ML20153E060 + (ML20153E060)
- ML20153E075 + (ML20153E075)
- ML20153E076 + (ML20153E076)
- ML20153E078 + (ML20153E078)
- ML20153E079 + (ML20153E079)
- ML20153E083 + (ML20153E083)
- BSEP-98-0184, Forwards Response to NRC 980617 RAI Re RPV Integrity for BSEP Units 1 & 2.Based on Review of Rept BWRVIP-46, Update of Bounding Assessment of BWR/2-6 RPV Integrity Issues Util Concluded That Listed Previously Submitted Info Valid + (ML20153E085)
- ML20153E086 + (ML20153E086)
- IR 05000029/1988002 + (ML20153E087)
- PY-CEI-NRR-0423, Updates Completion Status of Work Required by Remaining Seven Human Engineering Discrepancies Re Dcrdr Prior to Fuel Load.Discrepancies Required by Fuel Load Completed + (ML20153E090)
- ML20153E091 + (ML20153E091)
- ST-HL-AE-2607, Corrected Ltr Providing Addl Info Re ATWS Mitigating Sys Actuation Circuitry Diversity.W/O Encl + (ML20153E094)
- ML20153E096 + (ML20153E096)
- ML20153E098 + (ML20153E098)
- ML20153E100 + (ML20153E100)
- ML20153E101 + (ML20153E101)
- ML20153E104 + (ML20153E104)
- ML20153E106 + (ML20153E106)
- ML20153E107 + (ML20153E107)
- ML20153E111 + (ML20153E111)
- ML20153E112 + (ML20153E112)
- ML20153E113 + (ML20153E113)
- IR 05000354/1988006 + (ML20153E115)
- ML20153E118 + (ML20153E118)
- ML20153E121 + (ML20153E121)
- ML20153E123 + (ML20153E123)
- B17467, Submits Response to NRC RAI Re Util 980806 Proposed Rev to TS SG Tube Insp Interval (Tscr 3-17-98) + (ML20153E132)
- ML20153E137 + (ML20153E137)
- 05000321/LER-1985-046, :on 851219,at 100% Power,Spurious Initiation of Standby Gas Treatment Trains 1B & 2B Occurred.Cause Undetermined.Trains Shut Down & Returned to Standby Mode + (ML20153E138)
- 05000413/LER-1986-004, :on 860115,invalid Grab Samples Obtained.Caused by Introduction of Flush Water Over 4-day Period Due to Stuck Turbine Bldg Sump Radiation Monitor Flush Inlet Valve. on 851221,valve 1EMF Declared Inoperable + (ML20153E141)
- ML20153E148 + (ML20153E148)