Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151U497 + (ML20151U497)
- ML20151U499 + (ML20151U499)
- ML20151U501 + (ML20151U501)
- ML20151U503 + (ML20151U503)
- IR 05000259/1987046 + (ML20151U505)
- ML20151U506 + (ML20151U506)
- ML20151U507 + (ML20151U507)
- IR 05000461/1986002 + (ML20151U508)
- ML20151U510 + (ML20151U510)
- ML20151U513 + (ML20151U513)
- 05000317/LER-1988-008, :on 880716,unit Placed Into Mode 2 While Tech Specs Limiting Condition for Operation of Watertight Doors Not Satisfied.Caused by Personnel Error.Outsider Operator Log Modified & Training Sessions Conducted + (ML20151U514)
- ML20151U515 + (ML20151U515)
- ML20151U516 + (ML20151U516)
- B12881, Application for Amend to License DPR-65,changing Tech Spec 3.4.4.b to Read, at Least Two Groups of Pressurizer Heaters Each Having Capacity of at Least 130 Kw Capable of Being Supplied by Emergency Power. Fee Paid + (ML20151U517)
- ML20151U518 + (ML20151U518)
- ML20151U519 + (ML20151U519)
- ML20151U523 + (ML20151U523)
- ML20151U524 + (ML20151U524)
- ML20151U525 + (ML20151U525)
- IR 05000029/1988013 + (ML20151U526)
- ML20151U530 + (ML20151U530)
- ML20151U531 + (ML20151U531)
- ML20151U532 + (ML20151U532)
- ML20151U535 + (ML20151U535)
- ML20151U537 + (ML20151U537)
- ML20151U538 + (ML20151U538)
- ML20151U539 + (ML20151U539)
- ML20151U541 + (ML20151U541)
- ML20151U543 + (ML20151U543)
- ML20151U544 + (ML20151U544)
- ML20151U545 + (ML20151U545)
- B11977, Informs of Rev to Scope of 860114 Arbitrary Intermediate Break Elimination Request to Delete Nine Breaks from Consideration,To Expedite Review of Submittal.Issue Closed + (ML20151U548)
- ML20151U549 + (ML20151U549)
- ML20151U550 + (ML20151U550)
- ML20151U551 + (ML20151U551)
- ML20151U555 + (ML20151U555)
- ML20151U556 + (ML20151U556)
- ML20151U557 + (ML20151U557)
- HL-5674, Forwards Info Re Ei Hatch Nuclear Plant Probabilistic Risk Assessment Review.Summary Description of Presentation Given by Util in 980826 Meeting,Encl + (ML20151U558)
- ML20151U559 + (ML20151U559)
- 3F0488-15, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 161,Rev 0,relocating Table 3.6-1 Re Containment Valves to Fsar.Certificate of Svc Encl.Fee Paid + (ML20151U560)
- ML20151U562 + (ML20151U562)
- ML20151U566 + (ML20151U566)
- IR 05000334/1988022 + (ML20151U568)
- ML20151U569 + (ML20151U569)
- U-603076, Informs of Change in Contact for Receipt of Fingerprint Reviews & Criminal History Check Info.Name & Address of Individual to Contact,Listed + (ML20151U570)
- ML20151U572 + (ML20151U572)
- ML20151U574 + (ML20151U574)
- PNO-III-86-010, on 860201,auxiliary Transformer 2DC on Fire at Bushing Atop Unit.Caused by Trip from 80% Power Due to Main Electrical Fault on Transformer.Repairs & Bus Alignments Evaluated to Facilitate Restart + (ML20151U575)
- B12996, Forwards Response to Request for Addl Info Re 880624 Amend Application for Expansion of Spent Fuel Pool Storage Capacity + (ML20151U576)
- TXX-4695, Forwards Rev 1 of App E, Comanche Peak Response Team (Cprt) Procedure for Classification,Evaluation & Tracking of Specific Design or Const Discrepancies Identified by Cprt. Testing issue-specific Plans Will Be Submitted by 860301 + (ML20151U577)