3/4.6 00NTAD04DE SYSIDE 3/4.6.1 PRIMARY 00NTAINMDTP CENTAINMDG DEEGRITY LIMITING CDIDlTICN mR OPERATION 3.6.1.1 Primary CONIADD(IITE DTIBRITI shall be maintained.
APPIJCABIIIIY: PODES 1, 2, 3 and 4.
ACTION:
Without primary CCNIAINMDE INITERITY, restore CONIAINMDTP DTTEGRITY within one hour or be in at least IUr STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in 001D SIUIDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVETIJAN RBCUIRD4DTIS 4.6.1.1 Primary CONTAINMDTP DEEGRITI shall be deHordwated:
a.
At least once per 31 days by verifying that:
1.
All penetrations
- not capable of being closed by OPERABIE containment autcanatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated autcznatic valves secured in their positions, except as provided in Specification 3.6.3.1, and 2.
All equipnent hatches c.- closed and sealed, b.
By verifying that each containment air lock is OPERABIE per Specification 3.6.1.3.
- Except valves, blirri flanges, and deactivated autcanatic valves which are located inside the containment and are locked, sealed, or otherwise secured in the closed position. 'Ibese penetrations shall be verificxi closed durire each COID SIUIDCHN enxpt that verification of these penetrations being closed need not be performed more often than once per 92 days.
CRYSTAL RIVER - UNIT 3 3/4 6-1 Amendment No.
8805020095 880425 PDR ADOCK 05000302 P
OrWTAINMENT SYSIDtS 3/4.6.3 CONTAINMENT ISOIATION VALVES LIMrPING OQNDTTICN FOR OPERATION 3.6.3.1 All containment isolation valves shall be OPERABLE.
APPLICABILITY: KOES 1, 2, 3 and 4.
ACTION:
With one or more of the isolation valve (s) inoperable, either:
a.
Restore the inoperable valve (s) to OPERABIE stattis within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or b.
Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation pccition or, c.
Isolate each affected penetration within 4 houm by use of at least one closed manual valve or blind flange; or d.
Be in at least IDF STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in CDID SHUIDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILIANCE RE3JIREIENIS 4.6.3.1.1
'Ibe isolation valves shall be demonstrated OPERABIE prior to returning the valve to servi after maintenance, repair or replacement work that could affect the valve's performance is perfonned on the valve or its associated actuator, control or power circuit by performance of a cycling test and verification of isolation time.
i l
l l
r l
GYSTAL RIVER - UNIT 3 3/4 6-15 Amendment No.
i i
CQfPAINMENP SYSTDE SURVFTTIANCE REQUIRDENIS (Cbntirnwv1) 4.6.3.1.2 Each isolation valve shall be dernonstrated OPERABIE during the
_l ODID SHUIDCMN or REFUELING FODE at least once per 18 months by; a.
Verifying that on a containment isolation test signal, each automatic isolation valve actuates to its isolation position.
b.
Verifying that on a containment radiation-high test signal, each purge and exhaust auttrnatic valve actuates to its isolation position.
1 i
i I
l l
l CRYSTAL RIVER - UNIT 3 3/4 6-16 Amendment No.
l
\\
4 DEIRIED CRYSTAL RIVER - UNIT 3 3/4 6-17 Amendment No.
DEIEIED i
CRYSTAL RIVER - UNIT 3 3/4 6-18 Amendment No.
f
t O
DEIRIED 1
GYSTAL RIV R - UNIT 3 3/4 6-19 Amentnent No.
l DELEIED CRYSIAL RIVER - UNIT 3 3/4 6-20 Amentnent No.
4 4
i DEIEIED CRYSIAL RIVER - UNIT 3 3/4 6-21 Amendment No.
i I
DEIEIED l
l l
l l
l WN RIVER - UNIT 3 3/4 6-21a
% t No.
V l
CONTADMENT SYSTIUS BASES 3/4.6.3 CDNTAINMENT ISOIATION VALVES The OPERABILTIY of the containment isolation valves ensures that the containment atmosE ere will be isolated frm the outside enviroment in the h
event of a mlease of radioactive material to the containment atmosphere or pressurization of the containment. Containment isolation within the time limits specified ensures that the release of radioactive material to the environment will be consistent with the assunptions used in the analyses for a LOCA. Containment Isolation Valves arri their required isolation times are addressed in the FSAR.
3/6.6.4 COME0STIBLE GAS CONIROL The OPERABIIIIY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to raintain the hydrogen concentration within containment below its flammable limit durinJ pcst-IDCA conditions. The purge system is capable of controlling the expected hydrogen generation associatal with 1) zirconium-water reactions, 2) radiolytic decmposition of water and 3) corrosion of metals within containment. These hydrogen control systems are consistent with the r-ndations of Regulatory Guide 1.7, "Control of Ombustible Gas Concentrations in Containment Following a IDCA", March 1971.
l CRYSTAL RIVER - UNIT 3 B 3/4 6-4 I