Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151T792 + (ML20151T792)
- ML20151T794 + (ML20151T794)
- ML20151T795 + (ML20151T795)
- ML20151T796 + (ML20151T796)
- ML20151T798 + (ML20151T798)
- ML20151T799 + (ML20151T799)
- ML20151T800 + (ML20151T800)
- ML20151T801 + (ML20151T801)
- ML20151T802 + (ML20151T802)
- ML20151T803 + (ML20151T803)
- ML20151T804 + (ML20151T804)
- ML20151T805 + (ML20151T805)
- 05000461/LER-1988-019, :on 880712,all Three Circulating Water Pumps Automatically Shut Down Causing Rapid Loss of Condenser Vacuum.Caused by Random Failure of Condenser Pit High Water Level Switch.Switch Replaced + (ML20151T808)
- IR 05000482/1998015 + (ML20151T809)
- ML20151T810 + (ML20151T810)
- ML20151T811 + (ML20151T811)
- ML20151T812 + (ML20151T812)
- ML20151T814 + (ML20151T814)
- ML20151T816 + (ML20151T816)
- ML20151T817 + (ML20151T817)
- ML20151T818 + (ML20151T818)
- PY-CEI-NRR-0888, Forwards Summary of MSIV Logic Mod Plans,Per Util 880212 Commitment & Open Item Noted in Insp Rept 50-440/88-03 + (ML20151T819)
- IR 05000327/1985035 + (ML20151T820)
- ML20151T821 + (ML20151T821)
- 05000298/LER-1988-019, :on 880715,reactor Manually Scrammed Subsequent to Discovery of Electrical Arcing at Bolted Connection Between Removable Covers of Isolated Phase Bus Duct.Caused by Broken Ground Strap.Sys Restored to Svc + (ML20151T822)
- ML20151T823 + (ML20151T823)
- ML20151T824 + (ML20151T824)
- 05000498/LER-1988-044, :on 880714,automatic Actuation of Control Room Ventilation Sys to Recirculation Mode Occurred.Caused by Presence of Halon Gas in zero-sample Gas Used as Ref Value for Measurement of Subsequent Samples + (ML20151T825)
- ML20151T828 + (ML20151T828)
- ML20151T829 + (ML20151T829)
- ML20151T831 + (ML20151T831)
- 3F0998-05, Informs NRC of Util Plans to Integrate Efforts of Class 1 Fatigue Analysis for RCS Attached Piping & Large Bore Piping Project.Commitment Made to Complete RCS Attached Piping Class 1 Fatigue Analysis Is Being Revised to July 15,2000 + (ML20151T832)
- ML20151T833 + (ML20151T833)
- ML20151T834 + (ML20151T834)
- ML20151T836 + (ML20151T836)
- ML20151T838 + (ML20151T838)
- ML20151T839 + (ML20151T839)
- ML20151T841 + (ML20151T841)
- ML20151T843 + (ML20151T843)
- PY-CEI-NRR-0841, Forwards Addl Info on Util Program to Test & Evaluate motor- Operated Valves in High Pressure Eccs,In Accordance W/Ie Bulletin 85-003,per NRC 880405 Request + (ML20151T844)
- ML20151T845 + (ML20151T845)
- ML20151T846 + (ML20151T846)
- ML20151T848 + (ML20151T848)
- ML20151T852 + (ML20151T852)
- NUREG/CR-5177, Forwards Proprietary Vols 1 & 2 to NUREG/CR-5177 Re Review of Westinghouse Advanced PWR Probabilistic Safety Study,For Review.Repts Withheld (Ref 10CFR2.790) + (ML20151T853)
- ML20151T854 + (ML20151T854)
- ML20151T855 + (ML20151T855)
- NRC-88-3364, Forwards Proprietary & Nonproprietary Amend 4 to Westinghouse Advanced PWR RESAR-SP/90 Pda Module 13, Auxiliary Sys. Proprietary Rept Withheld (10CFR2.790) + (ML20151T856)
- ML20151T857 + (ML20151T857)
- ML20151T858 + (ML20151T858)
- ML20151T859 + (ML20151T859)