Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151Q507 + (ML20151Q507)
- ML20151Q509 + (ML20151Q509)
- ML20151Q511 + (ML20151Q511)
- 05000366/LER-1988-006-01, :on 880318,unplanned Scram Occurred & Main Steam Line Isolation Valve Failed to Close.Scram Caused by Deficiency in Procedure.Cause of Valve Failure Unknown. Procedure Rev Issued + (ML20151Q513)
- ML20151Q517 + (ML20151Q517)
- ML20151Q521 + (ML20151Q521)
- ML20151Q524 + (ML20151Q524)
- ML20151Q528 + (ML20151Q528)
- ML20151Q538 + (ML20151Q538)
- ML20151Q541 + (ML20151Q541)
- BSEP-88-0405, Forwards Revs to Emergency Procedures,Including Rev 4 to PEP-2.6.1 Re Plant Operations Director & Rev 1 to PEP-02.6.22 Re Technical Assessment Director.List of Revs to Procedures Encl.W/O Procedures + (ML20151Q543)
- ML20151Q546 + (ML20151Q546)
- ML20151Q550 + (ML20151Q550)
- ML20151Q552 + (ML20151Q552)
- 05000327/LER-1987-078, :on 871221,inadequate Procedure for RCS Chemical Addition Resulted in Noncompliance W/Tech Spec Action Statement.Procedures Revised to Provide Instructions for RCS Chemical Addition + (ML20151Q554)
- ML20151Q558 + (ML20151Q558)
- ML20151Q561 + (ML20151Q561)
- ML20151Q565 + (ML20151Q565)
- ST-HL-AE-2695, Informs That More Definitive Test of Negative Flux Rate Trip Performed on Both Four & Three Loop Plants W/Rod Worths Significantly Less than Max Worth Noted in WCAP-10298, Resulting in Indication of No Reactor Trip + (ML20151Q567)
- ML20151Q572 + (ML20151Q572)
- ML20151Q575 + (ML20151Q575)
- ML20151Q577 + (ML20151Q577)
- ML20151Q581 + (ML20151Q581)
- ML20151Q593 + (ML20151Q593)
- ML20151Q599 + (ML20151Q599)
- ML20151Q602 + (ML20151Q602)
- PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies + (ML20151Q605)
- ML20151Q607 + (ML20151Q607)
- 05000293/LER-1988-018, :on 880705,full Scram Signal Occurred.Caused by Procedure Weakness & Previous Administrative Controls That Were Not Entirely Adequate for Previous Changes Made to Procedure.Procedure Revised + (ML20151Q609)
- BSEP-88-0378, Discusses Util Reconsideration of Commitment to Reduce Low Level 2 Water Level Setpoint Provided in 871013 Updated Status of Facility Strategy for Avoiding Partial Low Level 2 Initiations/Isolation on Scrams + (ML20151Q611)
- ML20151Q613 + (ML20151Q613)
- ML20151Q615 + (ML20151Q615)
- ML20151Q620 + (ML20151Q620)
- ML20151Q624 + (ML20151Q624)
- ML20151Q627 + (ML20151Q627)
- ML20151Q631 + (ML20151Q631)
- ML20151Q634 + (ML20151Q634)
- ML20151Q636 + (ML20151Q636)
- BECO-88-025, Discharge Monitoring Rept for Jan-Mar 1988 + (ML20151Q641)
- ML20151Q642 + (ML20151Q642)
- IR 05000369/1988019 + (ML20151Q645)
- ML20151Q649 + (ML20151Q649)
- B12957, Application for Amend to License DPR-65,incorporating Changes Re Present Snubber Test Resampling Plan to Provide Consistency Among Snubber Sampling Plans for All Four Plants Operated by Northeast Utils.Fee Paid + (ML20151Q651)
- BECO-88-072, Requests Change in Distribution for NRC Correspondence to Replace Kp Roberts W/Kl Highfill at Listed Address + (ML20151Q653)
- ML20151Q657 + (ML20151Q657)
- ML20151Q661 + (ML20151Q661)
- BSEP-88-0736, Discusses Enforcement Discretion Re Design Problem W/Hpci Injection Valve E41-F003 Discovered on 880705.MSIV Encl Will Be Monitored for Leakage Once Per Shift + (ML20151Q663)
- ML20151Q666 + (ML20151Q666)
- PNO-I-88-042, licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal + (ML20151Q667)
- ML20151Q670 + (ML20151Q670)
- ML20151Q672 + (ML20151Q672)