Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151J345 + (ML20151J345)
- ML20151J351 + (ML20151J351)
- HL-5437, Forwards Revs to Ei Hatch GL 88-01 & NUREG-0313 Commitments Re Third 10-year Interval Inservice Insp Program + (ML20151J355)
- ML20151J357 + (ML20151J357)
- 05000368/LER-1997-007-01, :on 970626,fuel Handling Area Ventilation Flow Rate Less than TS Requirement During Crane Operation W/Load Over Storage Pool Due to Personnel Error.Provided Addl Guidance in Crane Hold Card Instructions + (ML20151J360)
- ML20151J361 + (ML20151J361)
- ML20151J365 + (ML20151J365)
- IR 05000528/1984014 + (ML20151J370)
- ML20151J376 + (ML20151J376)
- ML20151J381 + (ML20151J381)
- ML20151J383 + (ML20151J383)
- JPN-88-036, Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Summary Rept of Review of safety-related Sys Encl.Commits to Submitting Detailed Calculations for RHR Pumps by 881028 & for Sizing of Min Lines by 890128 + (ML20151J384)
- ML20151J388 + (ML20151J388)
- ML20151J389 + (ML20151J389)
- 05000369/LER-1988-014-02, :on 880624,ESF Actuation & Blackout Occurred Due to Personnel Taking Wrong Action.Caused by Slow Response of Diesel Generator 2A Lube Oil Pressure Switches.Switches Recalibr & Procedure Will Be Revised + (ML20151J394)
- ML20151J395 + (ML20151J395)
- ML20151J399 + (ML20151J399)
- ML20151J402 + (ML20151J402)
- ML20151J405 + (ML20151J405)
- ML20151J406 + (ML20151J406)
- ML20151J407 + (ML20151J407)
- ML20151J411 + (ML20151J411)
- IR 05000275/1984005 + (ML20151J417)
- ML20151J425 + (ML20151J425)
- IR 05000302/1997001 + (ML20151J428)
- ML20151J429 + (ML20151J429)
- 3F0897-01, Forwards Response to RAI on Resolution of USI A-46,stating That Anchorage Calculations for Tanks & Heat Exchangers to Confirm Engineering Judgement of Anchorage Adequacy Will Be Completed Prior to Restart But No Later than 971201 + (ML20151J431)
- ML20151J434 + (ML20151J434)
- ML20151J439 + (ML20151J439)
- IR 05000219/1988007 + (ML20151J450)
- ML20151J453 + (ML20151J453)
- ML20151J454 + (ML20151J454)
- ML20151J455 + (ML20151J455)
- ML20151J460 + (ML20151J460)
- ML20151J464 + (ML20151J464)
- IR 05000528/1984013 + (ML20151J472)
- 05000219/LER-1997-008-01, :on 970627,determined That Intermediate Range Monitor Sys Contacts in Reactor Protection Were Not Tested by Procedure.Caused by Inadequate Testing Procedures. Revised Sp 620.4.005 + (ML20151J477)
- ML20151J480 + (ML20151J480)
- ML20151J481 + (ML20151J481)
- ML20151J486 + (ML20151J486)
- IR 05000354/1988018 + (ML20151J492)
- ML20151J496 + (ML20151J496)
- A07343, Notifies of Receipt of Invoices G0999,G1035,G1036 & G1037 for Fourth Quarterly Installment of 1988 Annual Fee + (ML20151J499)
- ML20151J500 + (ML20151J500)
- ML20151J502 + (ML20151J502)
- 05000271/LER-1996-012, :on 960416,determined That Low Pressure Coolant Injection Flow Could Potentially Be Diverted.Caused by Inadequate Design Review Prior to Proceduralizing Use of Sys.Revised RHR Procedure + (ML20151J503)
- ML20151J505 + (ML20151J505)
- ML20151J510 + (ML20151J510)
- NUREG-1077, Fr Notice of Finding of No Significant Impact Re Renewal of License SNM-21 + (ML20151J511)
- IR 05000277/1988018 + (ML20151J514)
- ML20151J520 + (ML20151J520)