July 29, 1997 a
't J
I l
l Mr. Michael J. Colomb Site Executive Officer i
.New York Power Authority James A. FitzPatrick Nuclear Power Plant Post Office Box 41 i
Lycoming, NY 13093
SUBJECT:
MAINTENANCE RULE BASELINE INSPECTION FOR FITZPATRICK i
Dear Mr. Colomb:
i I
in a telephone conversation on July 25,1997, between Mr. T. Herrmann and
.l Mr. Paul Bissett, arrangements were made for the NRC to conduct a baseline inspection of i
your maintenance rule program at FitzPatrick. The inspection is planned for the week of September 28,1997.
The inspection objective is to evaluate your performance to support compliance with the l
requirements of 10 CFR 50.65, " Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The inspection will be conducted using Inspection l
Procedure 62706, " Maintenance Rule" and will involve a team of at least four inspectors.
The team will require information about your program for their in-office preparation for the inspection. This information is identified in the enclosure to this letter. Please provide this i
information to Mr. Bissett by the week of September 7,1997. Mr. Herrmann has been i
advised of this request.
I i
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211 or e-mail address GWM@NRC. GOV.
Sincerely, Glenn W. Meyer, Chief Operator Licensing and l
Human Performance Branch Division of Reactor Safety i
l Docket No. 50-333
\\l I
l 5"" ^ " " SE!
lll11llllll5ll115llllllllllll
)
?I,-,
, _.~-
l o,
l.
l Mr. Michael J. Columb 2
cc w/ encl:
l C. D. Rappleyea, Chairman and Chief Executive Officer l
R. Schoenberger, President and Chief Operating Officer J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Nuclear Operations W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering i
R. Deasy, Vice President - Appraisal and Compliance Services R. Patch, Director - Quality Assurance j
G. C. Goldstein, Assistant General Counsel C. D. Faison, Director, Nuclear Licensing, NYPA K. Peters, Licensing Manager T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Director, Electric Division, Department of Public Service, State of New York l
G. T. Goering, Consultant, New York Power Authority l
J. E. Gagliardo, Consultant, New York Power Authority l
E. S. Beckjord, Consultant, New York Power Authority i
F. William Valentino, President, New York State Energy Research and Development Authority i
J. Spath, Program Director, New York State Energy Research and Development Authority l
l
[
l I
i i
4 4
a.
}
Mr. Michael J. Columb 3
Distribution w/ encl:
H. Miller, RA W. Axelson, DRA Nuclear Safety Information Center (NSIC)
PUBLIC NRC Resident inspector Region i Docket Room (with concurrences)
J. Rogge, DRP R. Barkley, DRP R. Junod, DRP W. Dean, OEDO (WMD)
A. Dromerick, NRR K. Cotton, NRR D. Hood, NRR M. Campion, RI i
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR F. Talbot, NRR DOCDESK l
i l
l l
DOCUMENT NAME: A: MRI.FTZ To receive a copy of this document adicate in the bos:
"C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS Rl/DRS Rl/
Rl/
l Rl/
NAME (, PBissett p,
GMeyer 1_[
)
DAlQ d7/IB/97 ]f 7 07 @ 97 /f 07/ /97 07/ /97 07/ /97 V
OFFICIAL RECORD COPY I
4
~
d REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION t
- 1.
Copy of Maintenance Rule Program and all related procedures (covering all modes of operations) including those relating to expert panels, PRA, risk assessments and l
ranking, and scoping. Also, procedures used for assessing risk when taking equipment out of service. If not included in the procedures, please provide the l
definition of availability and reliability used at the site.
- 2.
List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.
- 3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
l l
' 4.
List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.
- 5.
List of high risk and low risk significant SSCs. In this list also include: (1) low risk significant standby SSCs; (2) the top 20 low risk significant SSCs which missed the 1
cut off; (3) the SSCs with risk significance different from that determined by PRA.
"6.
Assessments of risk significant and risk rankings. Risk reduction worth, risk achievement worth, and core damage frequency results, if applicable.
j
'7.
Organization chart depicting key personnel involved in maintenance rule j
implementation and list of their office telephone numbers, including system engineers and their systems.
I 8.
Background explanations ( i.e. copies of " conditions adverse to quality reports" etc.)
for SSCs currently assigned to the (a)(1) category.
9.
Copy of any internal or external maintenance rule assessments.
10.
Current maintenance rule trending data.
- 11.
Current performance criteria and goals for SSCs. Include a list of SSCs classified as
" inherently reliable" and/or "run to failure". If PRA used, provide PRA information such as reliability and availability basic events in the PRA used for risk ranking compared to performance criteria established for these SSCs.
12.
Qualifications and backgrounds for Expert Ibnel Members. Criteria used by the expert panel to determine risk significance for all modes of operation. Minutes from the last five expert panel meetings.
- 13.
Summary of significant changes made to the PRA model since the IPE.
14.
Copies of equipment status 1 documents (LCO logs, Equipment tagging logs, RO and SRO logs) for the last month of power operation.
Items identified with asterisk (*) are needed for in-office review prior to the inspection i
onsite.